Loading...
HomeMy WebLinkAboutResolution - 762 - CO#2 To Contract - JL Frazier Co - Transformer Vault & Beacon Construction, LIA - 03/26/1981AA:dh RESOLUTION #762 - 3/26181 Change Order #1 - Reso. 584 - 8/14/ Contract - Reso.,,#387- 1/10 /80 RESOLUTION Bid #5584 r BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order to the contract of 12/]3/79 between J. L. Frazier Company and the City of Lubbock which is attached herewith and which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 26th ATTEST: Evelyn Ga fga, City.Secr ary-Treasurer APPROVED AS TO CONTENT: 4 41 Marvin Coffee, DViftor of Aviation APPROVED AS TO FORM: I Le:�eL - Angela 41rams, Assistant City Attorney day of March ,1981. r LL ALIST$R, MAYOR TO: R. L. FRAZIER COMPANY 5506 - 27th Street Lubbock, Texas 79407 i RESOLUTION #762 - 3/26/81 Change Order X61 - Reso 584 - 8/14/8D Contract - Reso. #387 - 1/10/80 CHANGE ORDER NO. 2 Bid #5584 Transformer Vault & Beacon Construction ADAP Project No. 6-48-0138-14 Contract No. 1 Lubbock International Airport Lubbock, Texas General description of work included in contract: The construction of a new transformer vault, installation of transformer vault equipment, installation of standby engine -generator, installation of airport rotating beacon, installing new lighting cable, installing duct, con- struction of manholes, and other related items of work. Original Amount of Contract . . . . . . .$362,543.00 Change Order No. 1 . . . (Add) 4,050.00 Change Order No. 2 . . . . . . (Add) 14,991.00 Adjusted Contract Price . . . . . . . $381,584.00 Adjustment in Construction Time: Original Time for Completion 180 Calendar days Change Order No. 1 None Change Order No. 2 (Add)223 Calendar days Adjusted Time for Completion 403 Calendar days WHEREAS, it is desirable to make changes in the work to be constructed under this project: THIS AGREEMENT WITNESSETH: In consideration of the mutual advantage gained, the Owner and the Contractor agree to the changes indicated below and further agree that the amount of the contract shall be adjusted by the amount shown above. 1. PROPOSAL ITEM NO. 3, "Electrical Equipment and Wiring Installed in Existing Control Tower," shall be revised. The unit price shall be revised from $479.00 to $979.00. The Quantity shall remain 1 job. Deduct: 1 job @ $479.00 = $479.00 Add: 1 job @ $979.00 = $979.00 Sub- Total (Add) _ $500.00 2. PROPOSAL ITEM NO. 7, "Airport Rotating Beacon and Tower," shall be revised. The unit price shall be revised from $24,046.00 to $24,296.00. The Quantity shall remain 1 job. Deduct: 1 job @ $24,046.00 = $24,046.00 Add: 1 job @ 24,296.00 = 24,296.00 Sub -Total (Add) $ 250.00 CHANGE ORDER NO. 2 Page 1 of 4 3. PROPOSAL ITEM NO. 11, "2 -inch Underground Duct," shall be revised. The Quantity shall be revised from 320 L.F. to 1,045 L.F. The unit price shall be unchanged. Deduct: 370 L.F. @ $1.60 = $ 592.00 Add: 1,045 L.F. @ 1.60 1,672.00 Sub -total (Add) _ $1,080.00 4. PROPOSAL ITEM NO. 14, "4 -way, 4 -inch Underground Duct," shall be revised. The Quantity shall be revised from 2,540 L.F. to 2,665 L.F. The Unit price shall be unchanged. Deduct: 2,540 L.F. @ $10.00 = $25,400.00 Add: 2,665 L.F. @ $10.00 = 26,665.00 Sub -Total (Add) _ $ 1,265.00 5. PROPOSAL ITEM NO. 20, "Underground Cable 1/c, 5KV," shall be revised. The Quantity shall be revised from 100,000 L.F. to 103,300 L.F. The Unit price shall be unchanged. Deduct: 100,000 L.F. @ $0.37 $37,000.00 Add: 103,300 L.F. @ 0.37 = 38,221.00 Sub -Total (Add) _ $ 1,221.00 6. PROPOSAL ITEM NO. 29, "Manhole, 2 -foot Square," (as added by Change Order No. 1) shall be revised. The Quantity shall be revised from 5 each to 7 each. The Unit price shall be unchanged. Deduct: 5 Each @ $950.00 = $ 4,750.00 Add: 7 Each @ 950.00 = 6,650.00 Sub -Total (Add) _ $ 11900.00 7. PROPOSAL, Add a new Item No. 31, "4 -way, 2 -inch Underground Duct, furnished and installed in trench, including trenching and backfilling, per linear foot: for the unit price of $4.60 per linear foot. The Quantity shall be 500 L.F." Add: 500 L.F. @ $4.60 $2,300.00 8. PROPOSAL, Add a new Item No. 32, "Cable Connections, Extra, furnished and installed, complete, each: for the unit price of $25.00 each. The Quantity shall be 19 each." Add: 19 each @ $25.00 $ 475.00 9. PROPOSAL, Add a new Item No. 33 "Extra Labor, Equipment, and Materials for installing additional manholes, duct, cable and related items near the intersection of Runways 17R -35L and 8-26, complete for the lump sum price of $4,000.00" Add: 1 job @ $4,000.00 $4,000.00 10. PROPOSAL, Add a new Item No. 34, "Bore and clean existing duct that is silted or blocked in such manner to prevent installation of new cable. Boring and cleaning shall be done only when specifically authorized. Boring and cleaning shall be done, including labor and materials, complete, per linear foot: for the unit price of $10.00 per linear foot." Add: 200 L.F. @ $10.00 _ $2,000.00 CHANGE ORDER NO. 2 Page 2 of 4 11. SECTION 2 - INSTALLATION OF AIRPORT TRANSFORMER VAULT EQUIPMENT AND CONTROL TOWER EQUIPMENT Page 2-11 Paragraph 2-5 (b) Control Tower, the following shall be inserted: "Two (2) - rotary brightness control switches, 5 - brightness levels, for lighting on Runways 17R -35L and 8-26 shall be installed in the runway lighting control panel. The two existing defective switches shall be removed." 12. SECTION 7 - INSTALLATION OF AIRPORT ROTATING BEACON AND TOWER Page 7-9, Paragraph 7-5, (a), Airport Rotating Beacon and Tower: the following shall be inserted: "Install an auxiliary contactor in a NEMA 12 Enclosure and install a Hand/Automatic Switch in a weatherproof Box, all located at bottom of the Beacon Tower." 13. CONSTRUCTION TIME Adjust construction time by adding two hundred twenty three (223) calendar days in accordance with Paragraph 42 of the General Conditions in the Contract Documents. This additional time is for delays incurred by the Contractor in receipt of certain critical equipment and for delays caused by bad weather. Total construction time will be changed to 403 consecutive calendar days. The additional work involved with installation of,manholes, duct, cable, and related work near the intersection of Runways 17R -35L and 8-26 shall be done by the Contractor as soon as possible but only when the operation of aircraft allows the Director of Aviation to permit work within the area. This additional work will be done after the original contract work has been substantially completed, therefore it is not included In the above stated.construction time. CHANGE ORDER NO. 2 Page 3 of 4 The aforementioned changes, and work affected thereby, are subject to all contract stipulations and covenants. The Owner and the Contractor agree that there will not be an adjustment to the time allowed for completion of the project for the above listed changes, except as set forth in Item No. 13 above. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 26th day of March , 1981. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - RECOMMENDED: PARKHILL, SMITH & COOPER, INC., Consulting Engineers By l< Project Engineer L%1981 APPROVED: R. L. FRAZIER COMPANY, Contractor APPROVED: CITY OF LUBBOCK, TEXAS, Owner By ._ Mayor ' 1981 -ATTEST: City Secretary APPROVED AS TO CONTENT: ai n Coffee, Di orof Aviation APPROVED AS TO FORM: - gelaams, Assistant City Attorney CHANGE ORDER NO. 2 Page 4 of 4