Loading...
HomeMy WebLinkAboutResolution - 712 - CO #1 To CDWO 7917- 5Th Year CD Paving Program- 28 Alley Returns, S Overton Add - 02/12/1981JWF:pc RESOLUTION #712 - 2/12/81 (Amends Reso. #41, 1/25/79) RESOLUTION RESOLUTION ACCEPTING CHANGE ORDER NO. 1 TO THE 5TH YEAR COMMUNITY DEVELOP -1 MENT PAVING PROGRAM-CDWO 7917. WHEREAS, it is desirable to make changes in the plans and specifications I for this project, being namely, the additional construction of 28 Alley Returns located in the South Overton Addition. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: - THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Texas the above mentioned Change Order No. 1, copy of which Change Order is annexed hereto and made a part hereof. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 12th day of February _, 1981. r BIL cALISTER, MAYOR `ATTEST elyn Ga ga, City S c -Treasurer APPROVED AS TO CONTENT: Don JenjKngs, Vfy Engineer APPROVED AS TO FORM: J.�th Fullingim, Assistanr/City Attorney RESOLUTION #712, 2/12/81 (Amends Reso. #41, 1/25/79) CHANGE ORDER NO. 1 5th Year CD Paving Improvements CDWO 7917 To: W. D. Turner Construction Co. 3002 50th Street Lubbock, Texas 79413 Gentlemen: WHEREAS, it is desirable to make changes in the plans and specifications for this project, being namely, the additional construction of 28 Alley Returns located in the South Overton Addition and being more specifically located as shown on the attached map. Amount of Original Contract $211,189.10 Amount of Change Order #1 $ 27,772.00 New Amount of Contract subsequent to $238,961.10 Change Order No. 1 THIS AGREEMENT WITNESSETH: In consideration of the mutual advantages gained, the Owner and the Contractor agree to the change shown herein and in the revised plans. The Contractor agrees to proceed with construction and to adhere to applicable specifications, under the direction of the Engineer. Furthermore, the parties agree that the original contract between the Owner and the Contractor shall be modified to the extend herein indicated, including two (2) attachments. IN WITNESS WHERE, the Owner and the Contractor have hereto set their hands this 12th day of February, 1981. W. D. Turner Construction Co. (Contractor) Title: W. D. Turner Construction Co. CITY OF LUBBOCK (Owner) By Attest: B 11 cAlister, Mayor Evelyn Ga ga, City tary RECOMMENDED FOR APPROVAL /)09�7 In DoA Jenn, gs, Cith Engineer Larry gyalVngham, Ci y nager February 12, 1981 CHANGE ORDER NO. 1 5th Year Community Development Paving Program CDWO 7917 Quantities and Cost of Change Order No. 1 C & G Removal 952 L. F. @ $8.00/L. F. _ $ 7,616.00 C.& G Construction 880 L. F. @ $5.70/L. F. _ $ 5,016.00 Alley Returns 566 S. Y. @ $26.00/S. Y. _ $14,716.00 Pavement Patching 106 S. Y. @ $4.00/S. Y. _ $ 424.00 Total $27,772.00 010 ��GOOD�1➢�i �A��OPa��a➢� ��G�oA�v001� �O��OD�aO��� ��W�Q e�A� � �� �, ,�, -1111 MAN 4oAuNVjyq��� dimULM ..� oo0a oO�ii� ���nD�10�0���oQP��0�0� ��o0�Q0000�'oOOp�"o Jill �Q -1 21 USA������ OU Mm .�, 1029 q11 1v0PR1�001 ���lo���l�l� ����0 � ��➢� A����al�� � : i All:d� ��AA� ®SAA �AA��fa�dPONmc CEO - �� All r AIDeQ00�0� aI 00a��1�0� �A���P� �0� ��ADO®�o00�� ���lip. MY-lill��!�e- S000qN�o NO[all Of 1161,11 e�A�ODa�loop 11111 0110111 11 lull iii00ia1101�WIN —W.F1321 A A PON ®3Md� A- r 301 MAIN mill WOO��m��ooO ��i�oa©O P ' - E� �.►ti � � � 0 . , AOQDaoOoa� OQPa410�' ��Ov�aoIIN RODPvao�o'_�`�A�waaool� ® � All 111 11a .7AlI ■ Do0Palo ®�M��- o � ' t iGO�w 0�1� �IOQO ®loop �000�1�01 OOP�1�0 - vv � �' _ 00 �A�D�. �01�p � E �eeI�®e���� ���e������� �e�e��d��d� ��oo�e�e��- ����� � � �� o���� ����a a�n0000�voaoo� c�o����aoo�� a��oQa�ovop WIR wig 13 EX mn KZ WHOM oilWP W ; i -L7• ���� Ise®F.�IWHRRAq A ��vv�