Loading...
HomeMy WebLinkAboutResolution - 934 - Accept Paving Improvements - Kerr Co - Tract A-I, Frankford Terrace Addition - 10/08/1981RESOLUTION 934 - 10/8/81 RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND AVENUES AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Frankford Terrace Addition, Tracts "A" thru "I" made arrangements with Kerr Construction Company for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the above mentioned addition including the following streets: Fulton Avenue from its intersection with the South lip line of 24th Street to its intersection with the North lip line of 25th Street known and designated as New Subdivision Sub -Unit Number 05 of Unit Number 2028. 25th Street from its intersection with the West raw edge of Frankford Avenue to its intersection with a line 950.16 feet West of the West property line of Frankford Avenue known and designated as New Subdivision Sub -Unit Number 06 of Unit Number 2028. Frankford Avenue from its intersection with a line 15.00 feet South of South property line of 24th Street to its intersection with a line 285 feet South of South property line of 25th Street known and designated as New Subdivision Sub -Unit Number 07 of Unit Number 2028. (Concrete Only). AND WHEREAS, the construction of the above improvements on the above- mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost in the amount of $885.48 and to release escrow money in the amount of $529.93. II. This resolution shall take effect and be in force from and after its passage. RESOLUTION (Page 2) PASSED AND APPROVED THIS 8TH DAY OF OCTOar,ij Mayor ATTEST: Evelyn G fga, City e e ry APPROVED AS TO -CONTENT: A�L - . Don Je ings, C' y Engineer APPROVED AS TO FORM: C�a�.... Jolfn Ross, Jr., City Attorney a a�. RESOLUTION (Page 2) PASSED AND APPROVED THIS 8TH DAY OF OCTOar,ij Mayor ATTEST: Evelyn G fga, City e e ry APPROVED AS TO -CONTENT: A�L - . Don Je ings, C' y Engineer APPROVED AS TO FORM: C�a�.... Jolfn Ross, Jr., City Attorney 1 RESO. 934 — 10/8/81 I • w w rt N N HW� N H 00 N O W�00 O V In N In N NJ W V O V O 00 00 O O O 00 00 a% 00 rn O O I O N O N N V O �D kn 00 In In N c n 1-h ftl :E� O N En rxj V V Ln rt K n m rn to H G rtrt r N N N to In mrtx m o pql ti_ V V O En rt N r•n O w cn rt G rt to O rn p rt o e m o a Z rxn m m m � H nnH rt NO y OD C tt -IH rt Pd t: ti m G o rt Fl. w0 rt rt rt wO rt rt C 9: to rt m R. O rn m C r m w %4 kC w `C rtm - m G rh y ti b m FA FJ m I -j G C O w I O rn bb m O En m bym p WO MH .O w n l b O rn K G ab o G C m y m G 1-1 G m N g w P. -d tv hi rt rn n m m H to G G w w a G' ro o x' m rt w rt oa w C r G rn rt rt l� W p. m O n O O t" n w 0 y o Id�' " M a. %O w o m 0 0 b W rt In £ rt r,h O II m O H r i C. m m N rt� c7% rt rt n WOt� aq G r v v In Ln 0 o in 4- O O 00 N �O �0 ?o O ON w w rt Ij HW� t21 H 00 W�00 V In N In N O+ W V O V O 00 00 O 00 O 00 O � a% 00 rn N In N I -- N O N N 0 0 �D to 00 In In 00 V V H H r N N N to In In V V V O O O N N N O O O O O O O O O rn rn a� o, rn rn V V V H H. al rt H H t21 H v n r14 o a' C 4'] N O O n C K P3 m I -r rt m mwdC-n rt rC G C n m H t=i En C+ a z n rn n H O m H m H p. En H O =0 C rt 9� O H H H z C °o= n O H t=i H I-' = H 110 N H CONSOLIDATED FINAL ESTIMATE FRANKFORD TERRACE TRACTS "A' THRU "I" Accepted October 8, 1981 COST ESTIMATE 5,009.13 S. Y. Paving 6" Base @ $ 6.35 $ 31,807.98 3,317.78 L. F. Curb & Gutter @ $ 5.50 $ 18,247.79 125.70 L. F. Removal of Curb & Gutter @ $ 6.50 $ 817.05 62.98 S. Y. Alley Return_ @ $ 22.50 $ 1,417.05 20.00 S. Y. Concrete Removal @ $ 3.00 $ 60.00 16.67 S. Y. Driveway Returns @ $ 22.50 $ 375.08 CONTRACT COST COST DISTRIBUTION $ 52,724.95 Acct. No. 183 TOTAL $ 52,724.95 $ 51,309.54 $ 885.48 $ 529.93 City Paving City Prepaid Unit & Contractor Developer W.O. to Account to Sub -Unit Cost Cost Contractor Contractor 2028-05 $ 14,785.71 $ 14,547.88 $ 58.25 $179.58 Acct. No. 184 2028-06 33,109.64 33,109.64 --- --- 2028-07 4,829.60 3,652.02 827.23 350.35 Acct. No. 183 TOTAL $ 52,724.95 $ 51,309.54 $ 885.48 $ 529.93