HomeMy WebLinkAboutResolution - 934 - Accept Paving Improvements - Kerr Co - Tract A-I, Frankford Terrace Addition - 10/08/1981RESOLUTION 934 - 10/8/81
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND AVENUES AS
LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Frankford Terrace Addition, Tracts "A" thru
"I" made arrangements with Kerr Construction Company for the construction of
paving improvements on certain streets dedicated in said subdivision under the
provisions of said Ordinance prior to the recording of the subdivision plat
of the above mentioned addition including the following streets:
Fulton Avenue from its intersection with the South lip line of 24th
Street to its intersection with the North lip line of 25th Street known
and designated as New Subdivision Sub -Unit Number 05 of Unit Number 2028.
25th Street from its intersection with the West raw edge of Frankford
Avenue to its intersection with a line 950.16 feet West of the West
property line of Frankford Avenue known and designated as New Subdivision
Sub -Unit Number 06 of Unit Number 2028.
Frankford Avenue from its intersection with a line 15.00 feet South of
South property line of 24th Street to its intersection with a line
285 feet South of South property line of 25th Street known and designated
as New Subdivision Sub -Unit Number 07 of Unit Number 2028. (Concrete Only).
AND WHEREAS, the construction of the above improvements on the above-
mentioned streets was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in
accordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost in the
amount of $885.48 and to release escrow money in the amount of $529.93.
II.
This resolution shall take effect and be in force from and after its
passage.
RESOLUTION
(Page 2)
PASSED AND APPROVED THIS 8TH DAY OF OCTOar,ij
Mayor
ATTEST:
Evelyn G fga, City e e ry
APPROVED AS TO -CONTENT:
A�L - .
Don Je ings, C' y Engineer
APPROVED AS TO FORM:
C�a�....
Jolfn Ross, Jr., City Attorney
a
a�.
RESOLUTION
(Page 2)
PASSED AND APPROVED THIS 8TH DAY OF OCTOar,ij
Mayor
ATTEST:
Evelyn G fga, City e e ry
APPROVED AS TO -CONTENT:
A�L - .
Don Je ings, C' y Engineer
APPROVED AS TO FORM:
C�a�....
Jolfn Ross, Jr., City Attorney
1 RESO. 934 — 10/8/81
I
•
w
w
rt
N
N
HW�
N
H
00
N
O
W�00
O
V
In N
In N
NJ
W
V
O V
O 00
00
O
O
O 00
00
a%
00
rn
O
O
I
O
N
O N
N
V
O
�D
kn
00
In In
N c n 1-h ftl
:E� O N
En rxj
V V
Ln rt K n
m rn to
H
G
rtrt
r
N
N
N
to
In
mrtx
m o
pql
ti_
V
V
O
En rt N r•n
O w cn
rt G
rt to O
rn p rt
o e
m o a
Z rxn m
m
m
�
H
nnH
rt NO y
OD C
tt
-IH rt
Pd t:
ti m
G
o
rt
Fl. w0
rt rt rt
wO
rt rt C
9:
to rt m
R.
O rn
m C
r m
w
%4 kC w
`C rtm
- m G
rh y ti
b m
FA
FJ
m I -j
G
C O
w I
O rn
bb
m O
En m
bym p
WO
MH
.O
w n l
b
O rn
K G
ab
o
G
C m
y m
G 1-1
G
m
N g
w
P. -d tv
hi
rt rn n
m m
H
to
G
G w w
a
G' ro o
x' m
rt w
rt
oa w C
r G
rn rt rt
l�
W
p. m
O n
O O
t"
n
w
0 y o
Id�'
" M
a. %O w
o
m
0 0 b
W rt
In £
rt r,h
O
II
m
O H
r i
C. m
m N
rt�
c7%
rt
rt n
WOt�
aq
G
r
v
v
In
Ln
0
o
in
4-
O
O
00
N
�O
�0
?o
O
ON
w
w
rt
Ij
HW�
t21
H
00
W�00
V
In N
In N
O+
W
V
O V
O 00
00
O
00
O 00
O �
a%
00
rn
N In
N I --
N
O N
N
0 0
�D
to
00
In In
00
V V
H
H
r
N
N
N
to
In
In
V
V
V
O
O
O
N N N
O O O
O O O
O O O
rn rn a�
o, rn rn
V V V
H
H.
al
rt
H
H
t21
H
v n r14
o a'
C 4']
N O
O n
C K
P3 m
I -r rt
m
mwdC-n
rt rC
G C
n m
H
t=i
En
C+
a z
n rn
n H O
m H
m H
p.
En H
O =0 C
rt 9�
O H
H H z
C
°o= n O
H t=i H
I-' = H
110
N H
CONSOLIDATED FINAL ESTIMATE
FRANKFORD TERRACE
TRACTS "A' THRU "I"
Accepted October 8, 1981
COST ESTIMATE
5,009.13
S.
Y.
Paving 6" Base
@
$
6.35
$
31,807.98
3,317.78
L.
F.
Curb & Gutter
@
$
5.50
$
18,247.79
125.70
L.
F.
Removal of Curb & Gutter
@
$
6.50
$
817.05
62.98
S.
Y.
Alley Return_
@
$
22.50
$
1,417.05
20.00
S.
Y.
Concrete Removal
@
$
3.00
$
60.00
16.67
S.
Y.
Driveway Returns
@
$
22.50
$
375.08
CONTRACT COST
COST DISTRIBUTION
$ 52,724.95
Acct. No. 183
TOTAL $ 52,724.95 $ 51,309.54 $ 885.48 $ 529.93
City Paving
City Prepaid
Unit &
Contractor
Developer
W.O. to
Account to
Sub -Unit
Cost
Cost
Contractor
Contractor
2028-05
$ 14,785.71
$ 14,547.88
$ 58.25
$179.58
Acct. No. 184
2028-06
33,109.64
33,109.64
---
---
2028-07
4,829.60
3,652.02
827.23
350.35
Acct. No. 183
TOTAL $ 52,724.95 $ 51,309.54 $ 885.48 $ 529.93