HomeMy WebLinkAboutResolution - 918 - Accept Paving Improvements - WD Turner Co - Avenues K & L Widening, 28Th To 38Th - 09/24/1981J RESOLUTION 918 - 9/24/81 4 RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS, AND/OR AVENUES AS LISTED BELOW. WHEREAS, the City of Lubbock heretofore entered into contract with W. D. Turner Construction Company for the making and construction of street improvements on portions of streets, and/or avenues in said City including among others the following: Avenues "K" and "L" widening from 28th Street to 38th Street (GWO 10,977). AND WHEREAS, the construction of the above improvements on the abovementioned streets and or avenues was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with terms of said contract GWO 10,977. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned streets, and/or avenues be and the same are hereby accepted, and the City Engineer be and he is hereby authorized to release retainage monies to the above mentioned contractor. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 24TH DAY OF SEPT E R, 1981. 01 Bi11 McAlister, Mayor ATTEST: Evelyn Ga ga, ity Sec et ry f :_APP VED TO CONTENT: -- Don Jen*°ings, C,Xy Engineer APPOVED AS TO FORM: '94 G --� n C. Ross, Jr., City Attorney MONTHLY ESTIMATE CITY OF LUBBOCK Protect: Avenue "K" and "L" Widening Contra -^tor: W. D. Turner Construction Company Address: 3002 - 50th. Street Lubbock, Texas 79413 Estimate Period From 9-1 , 19 81 to 9-24 On First estimate and final estimate use actual work dates Project No. G.W.O. 10,977 Estimate No. 5th & Final Contract $ 163, 966.75 19 81 UNIT OF PROJECT WORK DONE CONTRACT ITEM MEASURE � EST. QUANTITIES ON CONTRACT � PRICE I AMOUNT 1. 1-1/2" T.H.D. Type "C" A.C. j S.Y. ! 11,600 j 11,866. $5.40 $ 64 079.96 Pav1—ng—o—n'6-"T caliche base in- cluding n-clu ing removal of existing surface and base. 2. 6" Curb and Gutter or 30" L.F. 6,374 -),9ub-91 1 $4.85 - 28,6-8.51 separate Gutter i 4 3. 1-1/2" T.H.D. Tvne "C" A.C. S.Y. 337 415.16 S'A_75 S 1.5:6.85 P existins caliche base. ! i 1 4. Valley Gutters constructed S.Y 196 198.28 1 $1_q 00 $ 3.7E7. 32 with 3,QQ0 #17 day reinforCed � con -rete_ i 5. Alley Returns and Drainage S.Y. 117 102.55 $18.50 $ 1,8:7.18 Cnannels, 5" in thickness, constructed with reinforced 3,000#/7 day concrete 6. Curb and Gutter removal L.F. 3.475 3,007.08 $2.00 $ 6,:0_4.16 and disposal. 7. 4' thick sidewalk construction S.Y. 200 265.22 I $15.00 $ 3,9-8,30 including subgrade preparation 8. Concrete slab. removal S.Y. 672 319.75 82_nn $ :639,50 9• Railroad Track removal and L.F.--69-4-- __ 694.00 $5.00 $ 3,470.00 disposal, including ties and other construction necessary to clear area. APPROVED: i i Eng neer Date Dept_ Head Date 1 i I Date Tota; Amount of .fc;k Done ....... S Less 10% Retained ............. S Difference ................... S Less Special Deduction ........... S Less Liquidated Damage ......... S Less �*-evious Pay. -rents........... S Amount Due this Estimate......... S MONTHLY ESTIMATE • CITY OF LUBBOCK Project: Avenue "K" and "L" Widening Project No. G.W.O. 10.977 Contractor: W. D. Turner Construction Company Estimate No. 5th & Final Address: 3002 - 50th. Street Contract$ 163,966.75 Lubbock, Texas 79413 Estimate Period From 9-1 , 19 81 to 9-24 On First estimate and final estimate use actual work dates , 1981 ITEM UNIT OF MEASURE PROJECT EST. OUANTITIES WORK DONE CONTRACT ON CONTRACT PRICE AMOUNT 10. Reinforced concrete Median S.Y. 22 31.93 6" in thickness constructed with 3,00041/7 day concrete. f ! I f 11. Driveway Returns 5" in thick-! S.Y. 50 44.46 $ 866.9' ness, constructed with rein- forced 3,00041/7 day concrete I i crete IT 13 1 ! 931.60 1 si 50I and base between proposed I I street located at 37th street and Avenue "L". ! I 1 I ! I 14. Backfill for Item 13 above S.Y. 715 ' 931.60 j with native top soil 15. 1-1/2" 'Irl, I 2 ,270-41 95 Paving includinz removal of! ! existing surface. scarifine existing base, recoWact base ! ! .,..a ! I 16. 1-1/2" T.H.D. Tuve "C" A.C. i S.Y. 7,294 6,958.88 ! 5 40 ! $ 37.577.95 Paving on 6" of compacted ! ! I caliche base, including sub - grade preparation. i APPROVED: I Fnr Engr•s Offire Tota! Amount of Wcrit Done . . . . . v + 167s 691.26 Catculations by: I Less 10% Retained ............. S --- Engineer Dae Difference ................... S --- I Less Special Deduction ........... S /0� { cneCked bV: — Dept. He Date Less Liquidated Damage ......... S --- - — ....... Less -' Devious Payments .. . S 148, 762.13 Date Amount Due this Estimate......... S 18,929.13