HomeMy WebLinkAboutResolution - 2021-R0028 - Amendment No. 2 to Agreement with Parkhill, Smith and Cooper, Runway 8.26 Rehab 1.26.21Resolution No. 2021-R0028
Item No. 6.1.3
January 26, 2021
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute
for and on behalf of the City of Lubbock, Amendment No. 2 to that certain Agreement dated
May 12, 2020 for runway 8/26 rehabilitation services at the Lubbock Preston Smith
International Airport, by and between the City of Lubbock and Parkhill, Inc., of Lubbock,
Texas, and related documents. Said Amendment is attached hereto and incorporated in this
resolution as if fully set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council on January 26, 2021
AT ST:
J0
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
Kelly CYmpbell, X.A.E.
Executive director of Aviation
DANIEL M. POPE, MAYOR
City Attorney
ccdocs/RES.Amend #2 Agrmt- Runway 8/26 Rehabilitation Project
January 5, 2020
Resolution-Nom2-02-1--R0028
Parkhill
Ms. Kelly Campbell, A.A.E., Director of Aviation September 24, 2020
Lubbock Preston Smith International Airport
Administration Office, 2nd Floor
5401 North Martin Luther King Jr. Blvd., Unit 389
Lubbock Texas 79403
Re: Amendment No. 2 to Agreement for Professional Services, Design Phase Services for LBB
Runway 8/26 Rehabilitation Final Design, Bidding, Construction Phase, and Closeout
Services
Dear Ms. Campbell:
As requested, we prepared Amendment No. 2 for final design, bidding, construction administration,
Resident Project Representative (RPR), Closeout and Constriction phase materials testing, and
surveying related to the LBB Runway 8/26 Rehabilitation Project. Refer to attached detailed fee
sheets for an itemization of the scope of services. Parkhill's proposed services include:
1. Parkhill performed final design services to ready the Project for bidding, including integration
into the LBB Terminal Apron Rehabilitation bid documents.. Costs were tracked and hours
spent are tabulated within this package. Fee for final design task represents cost plus 15%
profit.
2. Parkhill to assist LBB with Bid Phase services as detailed on attached fee sheet.
3. Parkhill to provide construction administration services as detailed on attached fee sheet.
Construction administration services reflect a 50-calendar day project to final completion.
Services are proposed on an hourly rate basis. Unused fee will not be invoiced.
4. Parkhill to provide RPR services as detailed on attached fee sheet. RPR time reflects 50
calendar days to final completion and Is proposed on an hourly rate basis. Unused fee will not
be invoiced.
5. Parkhill will provide closeout -phase services in accordance with FAA requirements and as
detailed on attached fee sheet.
6. Parkhill services include construction materials testing by our partner firm, Pavetex
Engineering, LLC. There is not any OA testing anticipated, but a small reimbursable fee is
proposed as contingency.
Proposed Amendment 2 services are summarized as follows:
Task 3FDS Lump Sum Fee for Final Design Services (PARKHILL) $ 26,000.00
Task 4BID Lump Sum Fee for Bid Phase Services (PARKHILL) $ 2,000.00
Task 5CON Hourly Rate Fee for Construction Phase Services (PARKHILL) $ 35,000.00
Task 6RPR Hourly Rate Fee for RPR Services (PARKHILL) $ 40,000.00
Task 7CLO Lump Sum Fee for Closeout Phase Services (PARKHILL) $ 6,000.00
Task 9SSC RelmburwtI2 Swvioes for Construction PAVETEX 2 000.00
TOTAL AMENDMENT NO.2 $111,000.00
110Ws11proJeqs1Yp1712715.17100J�MM00 COHfR101_fWAIU:onstnidioM2020.0912020.09.24 Wpwvaye28 C1,CoNrsct�.doe
4222 85th Street Lubbock. Texas 79423 i 8064732= Parkh9l.eom
Ms. Kelly Campbell, A.A.E.
Page 2
September 24, 2020
We propose to modify the agreement (Contract No.15310) between the City of Lubbock and Parkhill
dated May 12, 2020 and provide approved Task 3, 4, and 7 services under provisions of Exhibit B -
Payments to the Engineer, Paragraph B4.01 (Lump Sum Method) of Contract and Task 5, 6 and 9
services under provisions of Exhibit B - Payments to the Engineer, Paragraph 84.01 (Hourly Rate
Method) of Contract. Any necessary additional services will be provided according to Exhibit B -
Payments to the Engineer, Paragraph B4.02. Compensation for Tasks 3, 4, 5, 6, 7 and 9 services
shall not exceed the total above without Owner's written approval.
If terms of this amendment are agreeable, please sign and return one copy of this amendment.
Receipt of this signed letter will serve as our Notice to Proceed with these services. We look forward
to working with you in completing this Project. For questions, please call me directly at 806.473.3600.
Sincerely,
PARKHILL, S & COOPER, INC.
By
Mark D. Haberer, PE, CM
Principal/Project Manager
IN TRIPLICATE
MDWdg
Enclosures
Accepted by:
CITY OF LUBBOC
By
Daniel M. Pope Jr
Mayor
AttlAccaZarza
By
City Secretary
Approved as to Content:
30
Kelly ftmpbell, A. .E.
Director of Aviation
Project Detail - YTD Friday, September 26. 2020
12,03:31 PM
Parkhill, Smith & Cooper, Inc. Year -to -Date through 9=2020
Hours Ovt Hrs
Hours
Project Number: 01271517.00 LOS Alrtleld-Wide Joint Seal
Phase Number: IOAS Additional Services
Labor
C01 Engineering Student-SS1
B 01326 Snellgrove, Blake 7/28/2020
4.00
4,00
B 01326 Snellgrove, Blake 7/29/2020
3.00
3.00
Total for 01326
7.00
7.00
Total for Engineering Student-SS1
7.00
7.00
CO2 Engineering Student-882
B 01320 Mutter, Adam 7/28/2020
4.00
4.00
B 01320 Muler, Adam 9/11/2020
3.00
3.00
Total for 01320
7.00
7.00
Total for Engineering Student-SS2
7.00
7.00
C20 Engineer-PL2
B 01213 Pahe, Lanell 8/3/2020
3.00
3.00
B 01213 Pahe, Lanell 8/4/2020
7.00
7.00
B W213 Pahe, Lanell 8/10/2020
7.00
7.00
B 01213 Pahe, Lanell 8/11/2020
7.00
7.00
B 01213 Pahe, Lanell 8/12/2020
7.00
7.00
8 01213 Pahe, Lanell 8/13/2020
7.00
7.00
B 01213 Pahe, Lanell 8/17/2020
5.00
5.00
B 01213 Pahe, Lanell 8/18/2020
9.00
9.00
B 01213 Pahe, Lanell Off9/2020
4.00
4.00
B 01213 Pahe, Lanell 8/20/2020
8.00
8.00
B 01213 Pahe, Lanell 9/l/2020
7.00
7.00
B 01213 Pahe, Lanell 9/8/2020
9.00
9.00
B 01213 Pahe, Lanell 9/9/2020
4.50
4.50
B 01213 Pahe, Lanell 9110/2020
4.00
4.00
B 01213 Pahe, LeneO 9/11/2020
4.00
4.00
Total for 01213
92.50
92.50
Total for Engineer-PL2
92.60
92.50
C70 Sector Director-PL7
B 01069 Haberer, Mark 7/28/2020
4.00
4.00
B 01089 Haberer, Mark 8/3/2020
2.00
2.00
B 01089 Haberer, Mark 8/11/2020
1.00
1.00
B 01089 Haberer, Mark SAW2020
2.00
2.00
B 01089 Haberer, Mark 8/14/2020
2.00
2.00
B 01089 Haberer, Mark 8/24/2020
2.00
2.00
B 01089 Haberer, Mark 8/25/2020
2.00
2.00
B 01089 Haberer, Mark 8/26/2020
2.00
2.00
B 01089 Haberer, Mark SM8/2020
1.00
1.00
B 01089 Haberer, Mark 8/31/2020
1.00
1.00
B 01089 Haberer, Mark 9/1/2020
2.00
2.00
B 01089 Haberer, Mark 9/2/2020
3.00
3.00
B 01089 Haberer, Mark 9/312020
2.00
2.00
B 01089 Haberer, Mark 9/4/2020
2.00
2.00
B 01089 Haberer, Mark 9/8/2020
1.00
1.00
B 01089 Haberer, Mark 911=0
2.00
2.00
B 01089 Haberer, Mark 9/10/2020
3.00
3.00
8 01089 Haberer, Mark 9/11/2020
2.00
2.00
Total for 01089
36.00
30.00
Total for Sector Director-PL7
36.00
WOO
R50 RPR-PL5
B 01071 Carpenter, Mark 7/28/2020
4.00
4.00
Total for 01071
4.00
4.00
v7.6.758 (MHABERER) - Cost and Billing, Selected By: Projects, Tasks/Disciplines, SubTasks/Phases with Year -to -Date Page 1 of 3
20201
Hours
Ovt Hrs
Hours
Total for RPR-PL5
4.00
4.00
T30 Technologist-PL3
B 01362 Castleman, James 7/27/2020
1.00
1.00
B 01362 Castleman, James 7/28/2020
4.00
4.00
B 01362 Castleman, James 7/29/2020
2.00
2.00
B 01362 Castleman, James 8/10/2020
5.50
5.50
B 01362 Castleman, James e/11/2020
8.75
8.75
B 01362 Castleman, James 8/12/2020
7.25
7.25
B 01362 Castleman, James 8/13/2020
9.00
9.00
B 01362 Castleman, James 8/14/2020
5.25
5.25
B 01362 Castleman, James 8✓1742020
8.60
8.50
B 01362 Castleman, James 8/18/2020
3.00
3.00
B 01362 Castleman, James 8/19/2020
1.00
1.00
B 01362 Castleman, James 8/20/2020
4.00
4.00
B 01362 Castleman, James 8/21/2020
2.75
2.76
B 01362 Castleman, James 8/24/2020
2.50
2.50
B 01362 Castleman, James 9/1/2020
3.50
3.60
B 01362 Castleman, James 9/2/2020
.50
.50
B 01362 Castleman, James 9/3/2020
1.00
1.00
B 01362 Castleman, James 9/8/2020
7.76
7.75
B 01362 Castleman, James 9/9/2020
4.50
4.50
B 01362 Castleman, James 9/11/2020
1.00
1.00
Total for 01362
82.75
82.75
Total for Technologist-PL3
82.75
82.75
UO3 Project Assistant-SS3
B 10073 German, Debra 8/3/2020
1.10
1.10
B 10073 German, Debra 8/12/2020
1.10
1.10
B 10073 German, Debra 8/13/2020
1.80
1.80
B 10073 German, Debra 8/14/2020
1.70
1.70
B 10073 German, Debra 8/18/2020
1.00
1.00
B 10073 German, Debra 8/19/2020
1.70
1.70
8 10073 German, Debra 8/20/2020
2.40
2.40
B 10073 German, Debra 8/22/ =
.40
.40
B 10073 German, Debra 8/25/2020
2.60
2.60
B 10073 German, Debra 8/31/2020
.20
.20
B 10073 German, Debra 9/1/2020
2.70
2.70
B 10073 German, Debra 9/3/2020
.90
.90
B 10073 German, Debra 9/4/2020
.70
.40
1.10
B 10073 German, Debra 9/8/2020
.80
.80
B 10073 German, Debra 9/8/2020
1.80
1.80
B 10073 German, Debra 9/10/2020
5.90
5.90
Total for 10073
26.00
.40
27.20
Total for Project Assistant-SS3
26.80
.40
27.20
Total for Labor
256.05
A0
256.45
Total for Overhead
Total for Labor and Overhead
260AS
AO
256AS
Expenses
Relmbursable Expenses
521.00 Travel
B EX 000047493 7/28/2020 / Carpenter,
Mark / Mileage MC
B EX 000047403 8/28/2020 / Haberer,
Mark / Mileage
Total for 521.00
Total for Reimbursable Expenses
Total for Expenses
Total for 10AS
256.05
.40
266.45
Total for 01271517.00
256.05
.40
256A5
v7.6.758 (MHABERER) - Cost and Billing, Selected By: Projects, Tasks/Disciplines, SubTasks/Phases with Year -to -Date Page 2 of 3
ParkhilP
Project Fee and Budget Sheet
(Hourly/Billing Rates)
Toda 's Date: September 24, 2020
Prepared By: MDH
Principal: MDH
Project Manager: MDH
Project Name: LBB Terminal Apron Rehab
Project Number: 1271417.00
Task/Discipline: 4BI D
Projected Start Date: March 1, 2021
Fee (Revenue) Type: Lump Sum
Markup on Direct Expenses: 15.00%
Markup on Reimbursables: 15.00%
Fee Costs Summary
(Profit and Markup Included in Total Fee)
Labor Cost: $2,048
Direct Consultants:
Direct Expenses:
Reimburable Consultants:
Reimbursable Expenses:
Total Fee:
Summary
and Profit in labor, Markup included in Directs and Relmbursables)
Labor: $2,048
Directs:
Subtotal: $2,048
Reimburables:
Total Fee: $2,048
$2,000
Page 1 of 3
�iii�
�°I
��o���
r
�a
�
�n
oo��
v��r���
0u����������
InII�VII
�������
M
0
Direct Expenses Project: LOB Terminal Apron Rehab Project No: 2272417 Task: 481D Current Fee: $2,048
Expenses included In lump sum fee. Not billed to client.
Amount
Direct Consultant Costs
611 Structural Consultant
612 Mech/Elec Consultant
623 Environ/Civil Consultant
614 Architectural Consultant
62S Testing Consultant (Geotech, CMT, TAB, etc.)
616 Surveying Consultant
617 Interior Design Consultant
618 Other Consultant - Kitchen / Food Consultant
618 Other Consultant- Acoustical Consultant
618 Other Consultant -AV/ IT Consultant
618 Other Consultant
Total Direct Consultants
Direct Expense Costs
621 Travel
Motel Days @
Men @ /Man -day =
AirTravel Air Fare @
Men @ /Man
=
Parking Days @
/Day
=
Car Rental Days @
/Day
=
Mileage Miles @
$0.585
@ 2 Trips
=
Subtotal
622 Reproductions
Blackline Prints
34" x 22"
Shts @
$2.50 /Sht @
Sets =
36" x 24"
Shts @
$2.75 /Sht @
Sets -
42" x 30
Shts @
$3.25 /Sht @
Sets =
Other
sf @
$0.% /sf @
Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.25 ISM @
Submittals =
8-1/2" x 11" B&W
Originals @
$0.09 /Sht @
1 Sets =
8-1/2" x 11" Color
Originals @
$0.55 /Sht @
1 Sets -
11" x 17" B&W
Originals @
$0.18 /Sht @
1 Sets -
11" x 17" Color
Originals @
$1.05 /Sht @
I Sets =
Binding Cost
Sets @
$2.00 /Set
=
Laminating
Shts @
$2.00 /Sht
=
Scan to file
Burn to CD/OVO
CO/DVD @
$13.50 /each
a
Scan Specs
Originals @
$0.15 /Sht
=
Scan Drawings
Originals @
$1.50 /Sht
Subtotal
623 Models/Renderin Photos
Shots @ /Shot
624 Telephone Calls @
$2.00 /Call
625 Meals Days @
Men @ /Man -day
626 Field Supplies
628 Posta a Mailings @
$2.00 /Mailin (Standard
628 Postage Mailings @
/Mailing (Overnight)
629 Publications
630 Misc Reimbursable Exp
632 Temporary Personnel
634 Office Supplies
635 CADD
636 Field Equip Rental
639 License & Regulation Fee
643 NM Gross Receipt Tax
647 Computer Suies
Total Direct Expenses
Page 3 of 3
Parkhill
Project Fee and Budget Sheet
(Hou /—Ing Rates)
Today's Date: September 24. 2020
Prepared By.
Principal:
Project Manager:
MDH
MDH
MDH
Project Name: LBB Terminal Apron Rehab
Project Number: 1271417.00
Task/Discipline: SCON
Projected Start Date: March 1, 2022
Fee (Revenue) Type: Hourly Rate w/Max
Markup on Direct Expenses: 25.00%
Markup on Reimbursables: 15.00%
Fee Costs Summary
(Profit and Markup Included in Total Feel
Labor Cost: $32,661
Direct Consultants:
Direct Expenses:
Reimburable Consultants:
Reimbursable Expenses: $1,884
Total Fee: S34.828
Summary
and Profit in Labor, Markup Included in Directs and Reimbursables)
Labor: $32,661
Directs:
Subtotal: $32,661
Reimburables: $2,167
Total Fee: $�34
$35,000
Page 1 of 3
No Text
Relmburable Expenses Project: l8B Terminal Apron Rehab Project No.1271417 Task: SCON
Current Fee: $34,828
Expenses NOT Included in lump sum fee. These are billed to client, IncludirtS markup, If allowed.
Amount
Reimbursable Consultant Costs
Sll Structural Consultant
512 Mech/Elec Consultant
513 Environ/GvilConsultant
514 Architectural Consultant
515 Testing Consultant (Geotech, CMT, TAB, etc.)
S16 Surveying Consultant
517 Interior Design Consultant
528 Other Consultant - Kitchen / Food Consultant
S18 Other Consultant- Acoustical Consultant
S18 Other Consultant- AV/ IT Consultant
S18 Other Consultant
Total Reimbursable Consultants
Reimbursable Expenses
521 Travel
Motel Days @
Men @ /Man -day =
Air Travel Air Fare @
Men @ /Man =
Parking Days @
/Day a
Car Rental Days @
/Day =
Mileage 30 Miles @
$0.585
@ 8 Trips =
$240.40
Subtotal
$140
S22 Reproductions
Bladdine / Color Plots
34" x 22"
Shts @
$2.50 /Sht @ Sets -
36" x 24"
Slits @
S2.7S /Sht @ Sets =
42" x 30
$his @
$3.25 /Sht @ Sets -
Other
$f @
SO.SS /sf @ Sets -
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @ Submittals
8-1/2" x 11" B&W 500
Originals @
$0.09 /Sht @ 1 Sets =
$45.00
8-2/2" x 11" Color SOO
Originals @
$0.55 /Sht @ 1 Sets -
$275.00
11" x 17" B&W
Originals @
$0.18 /Sht @ Sets =
21" x 17" Color
Originals @
$1.05 /Sht @ Sets =
Binding Cost
Sets @
$2.00 /Set =
Laminating
Slits @
$2.00 /Sht =
Scan to file
Burn to CD/DVD
CD/DVD @
$13.50 /each =
Scan Specs
Originals @
$0.15 /Sht
Scan Drawings
Originals @
53.50 /Sht =
Subtotal
$320
S23 Models/Renderings/Photos
Shots @ /Shot
524 Telephone SO Calls @
$2.00 /Cali
$100
525 Meals Days @
Men @ /Man -day
526 Field Supplies
528 Postage 12 Mailings @
$2.00 /Mailing {Standard
$24
S28 Postage 2 Mailings @
$25.00 /Mailing (Overnight)
$SO
S30 Misc Reimbursable Exp
S32 Temporary Personnel
534 Once Supplies
S3S CADD
S36 Field Equip Rental
537 Interior Design Items
539 Ucense & Regulation Fee Procore Construction Mana ement Program 50 days x $25/day)
$1,250
543 NM Gross Receipt Tax
547 Computer Supplies
TotalRebnbrosable Expenses $1,884
Page 3 of 3
Parkhill
Project Fee and Budget Sheet
jMourty/Billing Rates)
Toda 's Date: September 24, 2020
Prepared By:
Principal:
Project Manager:
MDH
MDH
MDH
Project Name:
LBB Terminal Apron Rehab
Project Number:
1271417.00
Task/Discipline:
6RPR
Projected Start Date:
March 1, 2021
Fee (Revenue) Type: Hourly Rate w/Max
Markup on Direct Expenses: 15.00%
Markup on Reimbursables: 15.00%
Fee Costs Summary
IProfit and Markup Included in Total Fee)
Labor Cost: $38,889
Direct Consultants:
Direct Expenses:
Reimburable Consultants:
Reimbursable Expenses: $635
Total Fee:
Summary
and Profit in Labor, Markup included in Directs and Reimbursables)
Labor: $38,989
Directs:
Subtotal: $38,889
Reimburables: $730
Total Fee: $39,619
--- $40,000
Page 1 of 3
ilfii�IliC
�Y
II
��I
al
I�
�
I�
l0
la�l
NIB
I���I
,,,�
d�,
��������
Reimburable Expenses Project: LBB Terminal Apron Rehab Project No:1271417 Task: 6RPR Current Fee: $39,619
Ex nses NOT Included In lump sum fee. These are billed to client, lncludlU markup, If allowed.
Amount
Reimbursable Consultant Costs
511 Structural Consultant
S22 Mech/ElecConsultant
S13 EnviroMGvilConsultant
524 Architectural Consultant
515 Testing Consultant (Geotech, CMT, TAB, etc.)
516 Surveying Consultant
517 Interior Design Consultant
518 Other Consultant- IOtchen / Food Consultant
S18 Other Consultant- Acoustical Consultant
SIB Other Consultant- AV/ IT Consultant
518 Other Consultant
Total Reimbursable Consultants
Reimbursable Expenses
521 Travel
Motel Days @
Men @ /Man -day
=
Air Travel Air fare @
Men @ /Man
=
Parking Days @
/Day
=
Car Rental Days @
/Day
_
Mileage 35 Miles @
$0.585
@ 31 Trips
$634.73
Subtotal
$635
522 Reproductions
Blackline / Color Plots
34" x 22"
Shts @
$2.50 /Sht @
Sets =
36" x 24"
Shts @
$2.75 /Sht @
Sets =
42" x 30
Shts @
$3.25 /Sht @
Sets =
Other
sf @
$0.55 /sf @
Sets -
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @
Submittals =
8-1/2' x 11" B&W
Originals @
$0.09 /Sht @
Sets -
8-1/2" x 11" Color
Originals @
$O.SS /Sht @
Sets =
11' x 17" B&W
Originals @
$0.18 /Sht @
Sets =
11" x 17" Color
Originals @
$1.OS /Sht @
Sets -
Binding Cost
Sets @
$2.00 /Set
=
Laminating
Shts @
$2.00 /Sht
Scan to file
Burn to CO/DVD
CD/DVD @
$13.50 /each
=
Scan Specs
Originals @
$0.15 /Sht
=
Scan Drawings
Originals @
$1.50 /Sht
=
Subtotal
523 Models/Renderings/Photos
Shots @ /Shot
524 Telephone Calls @
/Call
S25 Meals Days @
Men @ /Man -day
526 Field Supplies
S29 Postage Mailings @
/Mails (Standard)
S28 Postage Mailings to
/Malls Ovemight)
530 Misc Reimbursable Ex
S32 Temporary Personnel
534 Office Supplies
535 CADO
S36 Field Equip Rental
537 Interior Design Items
S39 License & Regulation Fee
S43 NM Gross Receipt Tax
S47 Computer Supplies
Total Reimbrusable Expenses $635
Page 3 of 3
Parkhill
Project Fee and Budget Sheet
(Hourly/ailling Rates)
Today's Date: September 24, 2020
Prepared By:
Principal:
Project Manager:
MDH
MDH
MDH
Project Name: LBB Terminal Apron Rehab
Project Number: 1271417.00
Task/Discipline: 7CLO
Projected Start Date: March 1, 2021
Fee (Revenue) Type: Lump Sum
Markup on Direct Expenses: 15.00%
Markup on Reimbursables: 15.00%
Fee Costs Summary
(Profit and Markup Included in Total Fee)
Labor Cost: $6,196
Direct Consultants:
Direct Expenses: $122
Reimburable Consultants:
Reimbursable Expenses:
Total Fee: $6,324
and Profit In labor, Markup included in Directs and Reimbursables)
Labor: $$6,196
Directs: $129
Subtotal: $6,324
Reimburables:
Total Fee: $0,324
$6,000
Page 1 of 3
iniliiiiiiiiiiiiiiiiiiiiiiiliii
����9�N�I������U��I������
������I��
I�101�
I�IIIIIIIIIIIIIIII
IIIIIIIII
IIIIOIN
IIIIIIIIIIIIIIIIIIIIIIIIIWI
IIIEIIII
Illlllllllllulllll�l
�IIII
IIII�
IIIII��
N�II
I�
II�III�I
Illln
IIIII�IIII�I
II��IIlrpsrll0l��l
IIIIII
I f I
Direct Expenses Project: LBO Terminal Apron Rehab Project No:1271417 Task: 7CLO Current Fee: $6,324
Expenses Included in lump sum (ee. Not billed to client.
Amount
Direct Consultant Costs
612 Structural Consultant
612 Mech/ElecConsultant
613 EnWron/Civil Consultant
614 Architectural Consultant
615 Testing Consultant (Geotech, CMT, TAB, etc.)
616 Surveying Consultant
617 Interior Design Consultant
618 Other Consultant - Kitchen / Food Consultant
618 Other Consultant- Acoustical Consultant
618 Other Consultant - AV/ ITConsultant
618 Other Consultant
Total Direct Consultants
Direct Expense Costs
621 Travel
Motel Days @
Men @ /Man•day =
Air Travel Air Fare @
Men @ /Man
=
Parking Days @
/Day
=
Car Rental Days @
/Day
a
Mileage 30 Miles @
$0.585
@ 2 Trips
= $35.10
Subtotal
$35
622 Reproductions
Blackline Prints
34" x 22"
Shts @
$2.50 /Sht @
Sets =
36" x 24"
Shts @
$2.75 /Sht @
Sets -
42" x 30
Shts @
$3.25 /Sht @
Sets =
Other
sf @
$0.55 /sf @
Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @
Submittals =
8.1/2" x 11" B&W SO
Originals @
$0.09 /Sht @
1 Sets = $4.50
8.2/2" x 11" Color 50
Originals @
$0.55 /Sht @
1 Sets = $27.50
11" x 17" B&W 25
Originals @
$0.19 /Sht @
1 Sets - $4.50
11" x 17" Color 2S
Originals @
$1.05 /Sht @
1 Sets = $26.25
Binding Cost
Sets @
$2.00 /Set
=
Laminating
Shts @
$2.00 /Sht
=
Scan to file
Bum to CD/DVD
CD/DVD @
$13.50 /each
=
Scan Specs
Originals @
$0.15 /Sht
=
Scan Drawings
Originals @
$1.50 /Sht
=
Subtotal
$63
623 Models/Renderings/Photos
Shots @ /Shot
624 Telephone 5 Cells @
$2.00 /Call
$10
625 Meals Days @
Men @ /Man -day
626 Field Supplies
628 Postage 2 Mailings @
$2.00 /Mailing JStandard)
$4
629 Postage Mailings @
/Mailing (Overnl ht)
629 Publications
630 Mlsc Reimbursable Ex
632 Temporary Personnel
634 OMce Supplies
635 CADD
636 Field Equip Rental
639 License StRegulation Fee
643 NM Gross Receipt Tax
647 CmputerSupplies
Total Direct Ex eyes $11211
Page 3 of 3
Parkhill
Project Fee and Budget Sheet
IHourNAIllina Rates)
Toda 's Date: September 24, 2020
Prepared By: MDH
Principal: MDH
Project Manager. MDH
Project Name: LBB Terminal Apron
Project Number: 1271417.00
Task/Discipline: 9SSC
Projected Start Date: March 1, 2021
Fee (Revenue) Type: Hourly Rate w/Max
Markup on Direct Expenses: 15.00%
Markup on Reimbursables: 15.00%
Fee Costs Summary
(Profit and Markup Included in Total Fee)
Labor Cost:
Direct Consultants:
Direct Expenses:
Reimburable Consultants: $1,700
Reimbursable Expenses:
Total Fee:
I Summary
and Profit in labor, Markup included in Directs and Reimbursables)
Labor:
Directs:
Subtotal:
Reimburables: $1,955
Total Fee: $1,955
$2,000
Page 1 of 2
Reimburable Expenses Project: 1BB Terminal Apron
Project No:1271417 Task: 9SSC Current fee: $1,955
Expenses NOT included in lump sum fee. These are billed to client, Including markup, if allowed.
Amount
Reimbursable Consultant Costs
511 Structural Consultant
512 Mech/Elec Consultant
513 Envlron/Civil Consultant
514 Architectural Consultant
535 Testing Consultant (Geotech, CMT, TAB, etc.)
Pavetex Engineering
$1,7oc
516 Surveying Consultant
S17 Interior Design Consultant
518 Other Consultant- Kitchen / Food Consultant
518 Other Consultant- Acoustical Consultant
S38 Other Consultant - AV/ IT Consultant
518 Other Consultant
Total Reimbursable Consultants $1,700
Reimbursable Expenses
521 Travel
Motel Days @
Men @ /Man -day =
Air Travel Air Fare @
Men @ /Man =
Parking Days @
/Day =
Car Rental Days @
/Day =
Mileage Miles @
$0.545
@ Trips =
Subtotal
522 Reproductions
Blackline / Color Plots
34" x 22"
Shts @
$2.50 /Sht @ Sets =
36" x 24"
Shts @
$2.75 /Sht @ Sets =
42" x 30
Shts @
$3.25 /Sht @ Sets =
Other
sf @
$0.55 /sf @ Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @ Submittals =
8-1/2" x 12" S&W
Originals @
$0.09 /Sht @ Sets =
8-1/2" x 11" Color
Originals @
$0.55 /Sht IF Sets =
11" x 17" B&W
Originals @
$0.19 /Sht @ Sets -
11" x 17" Color
Originals @
$2.05 /Sht @ Sets =
Binding Cost
Sets @
$2.00 /Set =
Laminating
Shts @
$2.00 /Sht =
Scan to file
Burn to CD/OVO
CD/DVD @
$13.50 /each =
Scan Specs
Originals @
$0.15 /Sht =
Scan Drawings
Originals @
$1.SO /Sht =
Subtotal
523 Models/Renderings/Photos;
Shots @ /Shot
S24 Telephone Calls @
/Call
52S Meals Da @
Men @ /Man-da
526 Field Supplies
528 Postage Mailings @
/Mailin (Standard)
$28 Postage Mailings @
/Mailing (Overnight)
530 Misc Reimbursable Ex
532 Temporary Personnel
534 Office Supplies
535 CADD
S36 Field Equip Rental
S37 Interior Design Items
S39 License & Regulation fee
543 NM Gross Receipt Tax
547 Computer Sulies
Total Reimbrusable Expenses
Page 2 of 2
—•yak.` — Ta::...F�.J
Parkhill, Smith & Cooper, Inc.
Hourly Rate Schedule
January 1, 2020 through December 31, 2020
Client: City of Lubbock, TX
Agreement Date: September 24, 2020
Project: LBB Runway 8/26 Rehab
Location: Lubbock, TX
HOURLY HOURLY
CLASSIFICATION RATE CLASSIFICATION RATE CLASSIFICATION
Trainee
Design/Engineer Student
Design/Engineer/Survey Technician
Administrative Assistant
Word Processor
File Specialist
JPPORT STAFF II $93.00
Design/Engineer Student
Design/Engineer/Survey Technician
CADD
Administrative Assistant
Project Assistant
Word Processor
File Specialist
SUPPORT STAFF 111 $102.00
Design/Engineer Student
Design/Engineer/Controls/Survey Technician
CADD
Administrative Assistant
Project Assistant
Proposal Editor/Technical Writer
tOFESSIONAL LEVEL 1
Mechanical & Electrical $106.00
Civil & Structural $106.00
Architect $106.00
Design Intern
Landscape & Interior
Design Intern
Planner
Resident Project Representative
Technologist
Project Assistant
Surveyor
Clerical Supervisor
Mechanical & Electrical
Civil & Structural
Architect
Design Intern
Landscape & Interior
Design Intern
Planner
Resident Project Representative
Technologist
Project Assistant
Surveyor
Clerical Supervisor
WFESSIONAL LEVEL III
Mechanical & Electrical
Civil & Structural
Architect
Design Intern
Landscape & Interior
Design Intern
Resident Project Representative
Technologist
Project Assistant
Surveyor
PROFESSIONAL LEVEL IV
Mechanical & Electrical
Civil & Structural
Architect
Landscape & Interior
Resident Project Representative
Technologist
Project Assistant
Surveyor
$107.00
$148.00
$130.00
$128.001
HOURLY
RATE
V
Mechanical & Electrical
Civil & Structural
Architect
Landscape & interior
Construction Project Manager
Geologist
Resident Project Representative
Technologist
Project Assistant
Surveyor
Client Manager
tOFESSIONAL LEVEL VI
Mechanical & Electrical
Civil & Structural
Architect
Landscape & Interior
Construction Project Manager
Geologist
Resident Project Representative
Technologist
Surveyor
Client Manager
10FESSIONAL LEVEL Vil
Mechanical & Electrical
Civil & Structural
Architect
Landscape & interior
Construction Project Manager
Resident Project Representative
Technologist
Surveyor
Expenses: Reimbursement for expenses as listed, but not limited to, Incurred in connection with services, will be at cost plus 15 percent for items such as:
I. Maps, photographs, postage, phone, reproductions, printing, equipment rental, and special supplies related to the services.
2. Consultants, soft engineers, surveyors, contractors, and other outside services.
3. Rented vehicles, local public transportation and taxis, road top fees, travel, and subsistence.
4. Special or job -specific fees, insurance, permits, and licenses applicable to work services.
S. Mileage at IRS -approved rate.
Rate for professional staff for legal proceedings or as expert witnesses will be a rate one and•afialf tines these Hourly Rates. Excise and gross receipt taxes, if any,
will be added as an excense.
Foregoing Schedule of Charges is incorporated Into the Agreement for Services provided, effective January 1, 2020 through December 31, 2020.
After December 31, 2020, invoices will reflect the Schedule of Charges currently In effect.
$206.001
$155
$233.00I
$224.00
$216.00
$234.00
$211.00