HomeMy WebLinkAboutResolution - 2021-R0027 - Amendment No. 1 to Contract 15310 with Parkhill, Smith and Cooper, Terminal Apron Rehab 1.26.21Resolution No. 2021-R0027
Item No. 6.1.2
January 26, 2021
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute
for and on behalf of the City of Lubbock, Amendment No. 1 to that certain Agreement dated
May 12, 2020 for terminal apron rehabilitation services at the Lubbock Preston Smith
International Airport, by and between the City of Lubbock and Parkhill, Inc., of Lubbock,
Texas, and related documents. Said Amendment is attached hereto and incorporated in this
resolution as if fully set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council on January 26, 2021
AT(EST: 44
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
Kelly CaYnpbell, A.A.E.
Executive director of Aviation
APPROVED AS —TO FORM:
DANIEL M. POPE, MAYOR
City Attorney
ccdocs/RES.Amend #1 Agrmt- Terminal Apron Rehabilitation Project
January 5, 2021
Resolution No. 2021-R0027
Parkhill
Ms. Kelly Campbell, A.A.E., Director of Aviation September 24, 2020
Lubbock Preston Smith International Airport
Administration Office, 2nd Floor
5401 North Martin Luther King Jr. Blvd., Unit 389
Lubbock Texas 79403
Re: Amendment No.1 to Agreement for Professional Services. Design Phase Services for LBB
Terminal Apron Rehabilitation Final iDesign, Bidding, Construction Phase, and
Closeout Services
Dear Ms. Campbell:
As requested, we prepared Amendment No. 1 for final design, bidding, construction administration,
Resident Project Representative (RPR), Closeout and Construction phase materials testing, and
surveying related to the LBB Terminal Apron Rehabilitation Project. Refer to attached detailed fee
sheets for an itemization of the scope of services. Parkhill's proposed services include:
1. Parkhill performed final design services to ready the Project for bidding. This effort included
multiple meetings with terminal building Contractor and development of a phasing plan to
align with ongoing terminal building improvements projeCt. Effort also included multiple
meetings with FAA and airlines. Final design services Included rework of Project
specifications to reflect 10H, as well as revisions to the Construction Safety and Phasing Plan
to reflect current FAA AC requirements. Final design effort extended October 2019 through
May 2020. Costs were tracked and hours spent are tabulated within this package. Fee for
final design task represents cost plus 151% profit.
2. Parkhill to assist LBB with Bid Phase services as detailed on attached fee sheet. This
Includes original bid plus rebid.
3. Parkhill to provide construction administration services as detailed on attached fee sheet.
Construction administration services reflect a 245-calendar day project to final completion.
Services are proposed on an hourly rate basis.
4. Parkhill to provide RPR services as detailed on attached fee sheet RPR time reflects
245calendar days to final completion and is proposed on an hourly rate basis. Unused fee will
not be invoiced.
5. Parkhill will provide closeout -phase services in accordance with FAA requirements and as
detailed on attached fee sheet
6. Parkhill services include construction materials testing by our partner flan, Pavetex
Engineering, LLC. Anticipated testing is as detailed in attached proposal. Construction
materials testing is proposed on a reimbursable basis and unused testing budget will not be
invoiced. Parkhill also included limited construction phase CIA surveying, also included on an
hourly rate basis. QA surveying may be required for verification of the edge drain system.
Proposed Amendment 1 services are summarized as follows:
Task 3FDS Lump Sum Fee for Final Design Services (PARKHILL) $ 72,960.00
Task 4BID Lump Sum Fee for Bid Phase Services (PARKHILL) $ 18,400.00
Task 5CON Hourly Rate Fee for Construction Phase Services (PARKHILL) $115,000.00
Task 6RPR Hourly Rate Fee for RPR Services (PARKHILL) $245,000.00
Task 7CLO Lump Sum Fee for Closeout Phase Services (PARKHILL) $ 17,400.00
Task 9SSC Reimbursable Services for Construction (PAVETEX) $ 84,700.00
Task SRVY Hourly Rate Surveying 520&s for Construction (PARKHILL) S 4.000.00
TOTAL AMENDMENT NO.1 S557_ase_ee
90etSIW( ftl201A2714.17100 AONINI00 CONMMI fN4L%Ccr4kudtn2M,o9a=.09.24TemingLopwRd* C&Ca*&d#jrmg* df doc
4222 SSth Street Lubbock, Texas 79423 808.473.= Parkh9l com
Ms. Kelly Campbell, A.A.E. Page 2 September 24, 2020
We propose to modify the agreement (Contract No.15310) between the City of Lubbock and Parkhill
dated May 12, 2020 and provide approved Task 3, 4, and 7 services under provisions of Exhibit B -
Payments to the Engineer, Paragraph B4.01 (Lump Sum Method) of Contract and Task 5, 6, 9, and
SRVY services under provisions of Exhibit B - Payments to the Engineer, Paragraph B4.01 (Hourly
Rate Method) of ContracL Any necessary additional services will be provided according to Exhibit B -
Payments to the Engineer, Paragraph B4.02. Compensation for Tasks 3, 4, 5, 6, 7, 9, and SRVY
services shall not exceed the total above without Owner's written approval.
If terms of this amendment are agreeable, please sign and return one copy of this amendment.
Receipt of this signed letter will serve as our Notice to Proceed with these services. We look forward
to worsting with you in completing this Project. For questions, please call me directly at 806.473.3600.
Sincerely,
PARKHILL, S TH & COOPER, INC.
By
Mark D. Haberer, PE, CM
Principal/Project Manager
IN TRIPLICATE
MDWdg
Enclosures
Accepted by:
CITYOF WBBO
te,
By
Daniel M. Pope
Mayor
Attest:
By V
Rebecca Garza
City Secretary
Approved as to Content:
� .. i *A. rtinrlink I a -
Kelly mpbell, XA.E.
Director of Aviation
Approved as
By
First Assistant City Attorney
Project Progress By Project Manager Monday, June 15.2020
1:31:47 PM
Parkhill, Smith & Cooper, Inc. For the period 6/1i'2020 - W3012020
JTD
Hours
Task Number:10AS Additional Services
Billing Manager:
Mark Haberer
Project Manager:
Mark Haberer
Client:
City of Lubbock • Aviation (Lubbock
Preston Smith International Airport)
Profit Center:
1:01:01
Status:
Active
Type:
Regular
Revenue Method:
BE
Labor
CO2 Engineering Student-SS2
Calderon, Rebecca
22
Total for Eng veering Student•SS2
22
C20 Engineer-PL2
Pahs, Lanell
234
Total for Engineer-PL2
234
C40 Project Engineer-PL4
Hazlett, Tessa
103
Total for Project Engineer-PL4
103
C60 Sector Director-131.6
Haberer. Mark
4
Total for Sector Director-151.6
4
C70 Sector Director--PL7
Haberer, Mark
56
Total for Sector Director-PL7
56
T30 Technologist-PL3
Castleman, James
177
Total for Technologist-PL3
177
UO3 Project Assistant-SS3
German, Debra
83
Total for Project Assistant-=
83
U31 Operations Support Team Leader-PL3
Gonzalez, Kristian
1
Total for Operations Support Team
t
Leader-PL3
Total for Labor
677
Total for Overhead
Total for Labor and Overhead 677
Expenses
Direct Expenses
Total for
% Complete:
Labor % Complete:
Expense % Complete:
Start Date:
Complete Date:
Unit Table:
Budgeted OH Rate
Direct Labor:
Direct Expense:
Direct Consultant.
Reimbursable Expense:
Reimbursable Consultant
Total Fee:
Multiplier/Amount:
v7.6.755 (MHASERER) - Cost, Project Budgeting Page 1 of 9
Project Progress By Project Manager For the period 6/1/2020 - 6130MM Monday, June 15, 20201:31:47 PM
JTD
Hours
621.00 Travel
Reimbursable Expenses
Total for
521.00 Travel
Total for
522.00 Reproductions
Total for Reimbursable Expenses
Total for ExDenses
Total for 1OAS 677
v7.6.755 (MHABERER) - Cost, Project Budgeting Page 2 of 9
Parkhill
Project Fee and Budget Sheet
(Hou► y/8illi Rates
Today's Date: September 24, 2020
Prepared By:
MDH
Principal:
MDH
Project Manager:
MDH
Project Name: LBB Terminal Apron Rehab
Project Number: 1271417.00
Task/Discipline: 4BI D
Projected Start Date: March 1, 2021
Fee (Revenue) Type: Lump Sum
Markup on Direct Expenses: 15.00%
Markup on Reimbursables: 15.00%
Fee costs summary
(Profit and Markup Included in Total Fee)
Labor Cost: $18,173
Direct Consultants:
Direct Expenses: $211
Reimburable Consultants:
Reimbursable Expenses:
Total Fee:
Fee Summary
(OH and Profit In labor, Markup included In Directs and Reimbursables)
Labor: $18,173
Directs: $243
Subtotal: $28,416
Reimburables:
Total Fee: $18,416
Page 1 of 3
$18,400
�
i�d
ii
uo�
ii
ii
OII�IIV�YI
II
IIII�N�W
C�
III�I
�
9��On
IVIVI
�nnnr�riur�ar
�����6tlVVWtld•
Y
Direct Expenses Project: LBO Terminal Apron Rehab Project No:1271417 Task: 4WD Current Fee: $18,416
Expenses Included in lump sum fee. Not billed to clent.
Amount
Direct Consultant Costs
611 Structural Consultant
612 Mech/Elec Consultant
613 Environ/Clvil Consultant
614 Architectural Consultant
615 Testing Consultant (Geotech, CMT, TAB, etc.)
616 Surveying Consultant
617 Interior Design Consultant
618 Other Consultant - Kitchen / Food Consultant
618 Other Consultant -Acoustical Consultant
618 Other Consultant - AV/ iT Consultant
618 Other Consultant
Total Direct Consultants
Direct Expense Costs
621 Travel
Motel Days @
Men @ /Man -day -
Air Travel Air Fare @
Men @ /Man
=
Parking Days @
/Day
=
Car Rental Days @
/Day
=
Mileage 30 Miles @
$0.585
@ S Trips
= $87.75
Subtotal
$88
622 Reproductions
Blackline Prints
34" x 22"
Shts @
$2.50 /Sht @
Sets =
36" x 24"
Shts @
$2.75 /Sht @
Sets -
42" x 30
Shts @
$3.25 /Sht @
Sets =
Other
sf @
$0.55 /sf @
Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @
Submittals n
8-1/2" x 11" B&W 10D
Originals @
$0.09 /Sht @
1 Sets = $9.00
8-1/2" x 11" Color 200
Originals @
$0.55 /Sht @
1 Sets $55.00
12" x 17" B&W 50
Originals @
$0.18 /Sht @
1 Sets = $9.00
11" x 17" Color 25
Originals @
$1.05 /Sht @
1 Sets - $26.25
Binding Cost
Sets @
$2.00 /Set
=
Laminating
Shts @
$2.00 /Sht
=
Scan to file
Burn to CD/DVD
CD/DVD @
$13.50 /each
=
Scan Specs
Originals @
$0.15 /Sht
=
Scan Drawings
Originals @
$1.50 /Sht
=
Subtotal
$99
623 Models/Renderings/Photos
Shots @ /Shot
624 Telephone 10 Calls @
$2.00 /Call
$20
625 Meals Days @
Men @ /Man -day
626 Field Supplies
628 Postage 2 Mailings @
$2.00 /Mailing (Standard)
$4
628 Postage Maill @
/Malting (Overnight)
629 Publications
630 Misc Reimbursable Exp
632 Temporary Personnel
634 Office Supplies
635 CADD
636 Field Equip Rental
639 License & Regulation Fee
643 NM Gross Receipt Tax
647 Computer Supplies
Total Direct Experms $211
Page 3 of 3
Parkhill
Project Fee and Budget Sheet
(Hourly/11111ing Rates)
Today's Date: September 24, 2020
Prepared By: MDH
Principal: MDH
Project Manager: MDH
Project Name: LBB Terminal Apron Rehab
Project Number: 1271417.00
Task/Discipline: SCON
Projected Start Date: March 1, 2021
Fee {Revenue) Type: Hourly Rate w/Max
Markup on Direct Expenses: iS.00%
Markup on Reimbursables: iS.00%
Fee Costs Summary
(Profit and Markup Included In Total Fee)
Labor Cost: $107,068
Direct Consultants:
Direct Expenses:
Reimburable Consultants:
Reimbursable Expenses: $7,005
Total fee:
and Profit in labor, Markup Included In Vrects and Reimbursables)
Labor: $107,068
Directs:
Subtotal: $107,068
Reimburables: $8,056
Total Fee: $115,123
$115,000
Page 2 of 3
lililiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiI
Reimburable Expenses Project: LBB Terminal Apron Rehab Project No: 2271417 Task-. SOON Current Fee: $115,123
Expenses NOT included In lump sum fee. These are billed to client, including markup, if allowed.
Amount
Reimbursable Consultant Costs
511 Structural Consultant
512 Mech/Elec Consultant
513 Environ/Civil Consultant
514 Architectural Consultant
51S Testing Consultant (Geotech, CMT, TAB, etc.)
516 Surveying Consultant
517 Interior Design Consultant
518 Other Consultant - Kitchen / Food Consultant
518 Other Consultant - Acoustical Consultant
518 Other Consultant - AV/ IT Consultant
518 Other Consultant
Total Reimbursable Consultants
Reimbursable Expenses
521 Travel
Motel Days @
Men @ /Man -day =
Air Travel Air Fare @
Men @ /Man =
Parking Days @
/Day a
Car Rental Days @
/Day a
Mileage 30 Miles @
$0.595
@ 22 Trips
$386.20
_,
Subtotal
$386
522 Reproductions
..,.
Blackline / Color Plots
34" x 22"
Shts @
$2.50 /Sht @ Sets =
36" x 24"
Shts @
$2.75 /Sht @ Sets =
42" x 30
Shts @
$3.25 /Sht @ Sets =
Other
sf @
$0.55 /sf @ Sets =
Mounting foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$015 /Sht @ Submittals =
8-1/2" x 11" B&W S00
Originals @
$0.09 /Sht @ 1 Sets =
$45.00
8-2/2" x 11" Color S00
Originals @
$0.55 /Sht @ 1 Sets =
$275.00
11" x 17" B&W
Originals @
$0.19 /Sht @ Sets =
11" x 17" Color
Originals @
$1.05 /Sht @ Sets =
Binding Cost
Sets @
$2.00 /Set =
Laminating
Shts @
$2.00 /Sht =
Scan to file
Burn to CO/OVD
CD/DVO @
$13.50 /each =
Scan Specs
Originals @
$0.15 /Sht =
Scan Drawings
Originals @
$1.50 /Sht =
Subtotal
$320
523 Models/Renderings/Photos
Shots @ /Shot
524 Telephone 50 Calls @
$2.00 /Call
$100
525 Meals Days @
Men @ /Man -day
526 Field Supplies
S28 Postage 12 Mailings @
$2.00 /Mailing (Standard)
$24
528 Postage 2 Mailings @
$2S.OD /Mailing (Overnight)
$S0
S30 Misc Reimbursable Exp
S32 Temporary Personnel
534 Office Supplies
535 CADD
536 Field Equip Rental
S37 Interior Design Items
539 License & Regulation Fee Procore Construction Management
Program (24S days x $25/da)
$6,125
$43 NM Gross Recel tTax
547 Computer Supplies
Total Rehnbrusable
biperizes $7,005
Page 3 of 3
Parkhill
Project Fee and Budget Sheet
(Hourly/Billing Rates)
Today's Date: September 24, 2020
Prepared By: MDH
Principal: MDH
Project Manager: MDH
Project Name: LBB Terminal Apron Rehab
Project Number: 1271417.00
Task/Discipline: 6RPR
Projected Start Date: March 1, 2021
Fee (Revenue)Type: Hourly Rate w/Max
Markup on Direct Expenses: 15.00%
Markup on Reimbursables: 25.00%
Fee Costs Summary
{Profit and Markup Included in Total Fee)
Labor Cost:
Direct Consultants:
Direct Expenses:
Reimburable Consultants:
$244,211
Reimbursable Expenses: $635
Total Fee:
Summary
and Profit in Labor, Markup included in Directs and Reimbursables)
Labor: $244,211
Directs:
Subtotal: $241,211
Reimburables: $730
Total Fee: $244,941
$245,000
Page 1 of 3
r
•
a
Reimbusabke Expenses Project: LBO Terminal Apron Rehab Project No.-1271417 Task: 6RPR Current Fee: $244,941
Expenses NOT included in lump sum fee. These are billed to client, Including marku , if allowed.
Amount
Reimbursable Consultant Costs
511 Structural Consultant
S12 Meeh/ElecConsultant
513 Environ/Civil Consultant
514 Architectural Consultant
515 Testing Consultant (Geotech, CMT, TAB, etc.
SILO Surveying Consultant
517 Interior Design Consultant
518 Other Consultant-Kitchen/Food Consultant
518 Other Consultant - Acoustical Consultant
518 Other Consultant -AV/ IT Consultant
518 Other Consultant
Total Reimbursable Consultants
Reimbursable Expenses
521 Travel
Motel Days @
Men @ /Man -day
=
Air Travel Air fare @
Men @ /Man
=
Parking Days @
/Day
=
Car Rental Days @
/Day
=
Mileage 35 Miles @
$0.585
@ 31 Trips
= $634.73
Subtotal
$635
522 Reproductions
Blackline / Color Plots
34" x 22"
Shts @
$2.50 /Sht @
Sets =
36" x 24"
Shts @
$2.75 /Sht @
Sets =
42" x 30
Shts @
$3.25 /Sht @
Sets =
Other
sf @
$0.55 /sf @
Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @
Submittals o
8-1/2" x 11" B&W
Originals @
$0.09 /Sht @
Sets =
8-1/2" x 21" Color
Originals @
$0.55 /Sht @
Sets
11" x 17" B&W
Originals @
$0.18 /Sht @
Sets =
11" x 17" Color
Originals @
$1.05 /Sht @
Sets =
Binding Cost
Sets @
$2.00 /Set
=
Laminating
Shts @
$2.00 /Sht
=
Scan to file
Bum to CO/DVD
t0/DVD @
$13.50 /each
=
Scan Specs
Originals @
$0.15 /Sht
=
Scan Drawings
Originals @
$1.50 /Sht
Subtotal
523 Models/Renderings/Photos
Shots @ /Shot
524 Telephone Calls @
/Call
525 Meals Days @
Men @ /Man -day
526 Field Supplies
528 Postage Mailings @
/Mailing (Standard)
528 Postage Mailings @
/Malling (Overnight)
530 Mlsc Reimbursable Exp
532 Temporary Personnel
534 Office Supplies
535 CADD
536 Field Equip Rental
537 Interior Design Items
539 License & Rgulatlon Fee
S43 NM Gross Receipt Tax
547 Computer Supplies
Total RelmbrusaMe Expenm t63S
Page 3 of 3
Parkhill
Project Fee and Budget Sheet
(Hourly/eiaing Rates)
Toda 's Date: September 24, 2020
Prepared By: MDH
Principal: MDH
Project Manager: MDH
Project Name: LBB Terminal Apron Rehab
Project Number: 1271417.00
Task/Discipline: 7CLO
Projected Start Date: March 1, 2021
Fee (Revenue) Type: Lump Sum
Markup on Direct Expenses: iS.00%
Markup on Reimbursables: 15.00%
Fee Costs Summary
(Profit and Markup included in Total Fee)
Labor Cost:
Direct Consultants:
$17,282
Direct Expenses: $112
Reimburable Consultants:
Reimbursable Expenses:
Total Fee:
Summary
and Profit in labor, Markup Included In Directs and Relmbursables)
Labor: $17,282
Directs: $129
Subtotal: $17,411
Reimburables:
Total Fee: $17,411
$17,400
Pagel of 3
i
nii
Direct Expenses Project: LBB Terminal Apron Rehab Project No-1271417 Task: 7CLO Current Fee: $17,411
Ex ernes Included in lump sum fee. Not billed to client.
Amount
Direct Consultant Costs
611 Structural Consultant
612 Mech/ElecConsuitant
613 Environ/Civil Consultant
624 Architectural Consultant
615 Testing Consultant (Geotech, CMT, TAB, etc.)
616 SurveyingConsultant
617 Interior Design Consultant
618 Other Consultant - Kitchen / Food Consultant
618 Other Consultant - Acoustical Consultant
628 Other Consultant - AV/ IT Consultant
628 Other Consultant
Total Direct consultants
Direct Expense Costs
621 Travel
Motel Days @
Men @ /Man -day =
Air Travel Air Fare @
Men @ /Man
Parking Days @
/Day
=
Car Rental Days @
/Day
=
Mileage 30 Miles @
$0.585
@ 2 Trips
$35.10
Subtotal
$35
622 Reproductions
Blackline Prints
34" x 22"
Shts @
$2.50 /Sht @
Sets =
36" x 24"
Shts @
$2.75 /Sht @
Sets =
42" x 30
Shts @
S3.2S /Sht @
Sets =
Other
sf @
$0.55 /sf @
Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @
Submittals =
8-1/2" x 11' B&W 50
Originals @
$0.09 /Sht @
1 Sets = $4.50
8-1/2" x 11" Color 50
Originals @
$O.SS /Sht @
1 Sets = $27.50
12" x 27' B&W 25
Originals @
$0.19 /Sht @
1 Sets = $4.50
11" x 17" Color 2S
Originals @
$1.05 /Sht @
1 Sets = $26.25
Binding Cost
Sets @
$2.00 /Set
=
Laminating
Shts @
$2.00 /Sht
=
Scan to file
Burn to CD/DVD
CD/DVD @
$13.50 /each
=
Scan Specs
Originals @
$0.15 /Sht
=
Scan Drawings
Originals @
$1.50 /Sht
=
Subtotal
$63
623 Models/Rendedngs/Photos
Shots @ /Shot
624 Telephone 5 Calls @
$2.00 /Call
$10
62S Meats Days @
Men @ /Man•da
626 Field Supplies
628 Postage 2 Mailings @
S2.W /Mail( Standard
$4
628 Postage Mailings @
/Mailing (Overnight)
629 Publications
630 Misc Reimbursable Exp
632 Temporary Personnel
634 Office Su plies
63S CADD
636 Field Equip Rental
639 License & Regulation Fee
643 NM Gross Receipt Tax
647 Computer Supplies
Total Direct Ex uses $112
Page 3 of 3
Project Fee and Budget Sheet
(Hourly/ailling Rates)
Toda 's Date: September 24 2020
Prepared By: MDH
Principal: MDH
Project Manager: MDH
Project Name: LBB Terminal Apron
Project Number: 1271417.00
Task/Discipline: 9SSC
Projected Start Date: March 1, 2021
Fee (Revenue) Type: Hourly Rate w/Max
Markup on Direct Expenses: 25.00%
Markup on Reimbursables: 15.00%
Fee costs summary
(Profit and Markup Included In Total Fee)
Labor Cost:
Direct Consultants:
Direct Expenses:
Reimburable Consultants: $73,608
Reimbursable Expenses:
Summary
and Profit in labor, Markup included In Directs and Relmbursables)
Labor:
Directs:
Subtotal:
Reimburables: $84,649
Total Fee: 649 1 Total Fee: $84,649
$84,700
Page 1 of 2
Reimburable Expenses Project: 1BB Terminal Apron
Project No:1271417 Task: 9SSC Current Fee:
$84.649
Expenses NOT included in lump sum fee. These are billed to client, Including markup, If allowed.
Amount
Reimbursable Consultant Costs
511 Structural Consultant
512 Mech/Elec Consultant
513 Environ/ChA1 Consultant
514 Architectural Consultant
515 Testing Consultant (Geotech, CMT, TAB, etc.)
Pavetex Engineering
$73,60
516 Surveying Consultant
517 Interior Design Consultant
518 Other Consultant - Kitchen / Food Consultant
518 Other Consultant - Acoustical Consultant
518 Other Consultant - AV/ IT Consultant
518 Other Consultant
Total Reimbursable Consultants
$73,608
Reimbursable Expenses
521 Travel
Motel Days @
Men @
/Man -day
Air Travel Air Fare @
Men @
/Man =
Parking Days @
/Day
a
Car Rental Days @
/Day
c
Mileage Miles @
$0.545
@
Trips =
Subtotal
522 Reproductions
Btackline / Color Plots
34"x 22"
Shts @
$2.50 /Sht @
Sets =
36" x 24"
Shts @
$2.75 /Sht @
Sets =
42" x 30
Shts @
$3.25 /Sht @
Sets
Other
sf @
$O.S5 /sf @
Sets
Mounting foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @
Submittals =
9.1/2" x 11" B&W
Originals @
$0.09 /Sht @
Sets =
8-2/2" x 21" Color
Originals @
$0.55 /Sht @
Sets =
11" x 17" B&W
Originals @
$0.18 /Sht @
Sets -
11" x 17" Color
Originals @
$1.05 /Sht @
Sets =
Binding Cost
Sets @
$2.00 /Set
=
Laminating
Shts @
$2.00 /Sht
=
Scan to file
Bum to CO/DVD
CD/DVD @
$13.50 /each
a
Scan Specs
Originals @
$0.15 /Sht
=
San Drawings
Originals @
$1.50 /Sht
=
Subtotal
523 Models/Rendedngs/Photos
shots @
/Shot
524 Telephone Caps @
/Call
525 Meals Days@
Men @
/Man -day
$26 FieldSupplles
528 Postage Mailings @
/Mailing (Standard)
528 Postage Mailings @
/Mailing (Overnt
t)
530 Misc Reimbursable Exp
532 Temporary Personnel
534 Office Supplies
535 CADD
536 Field Equip Rental
537 Interior Design Items
S39 License & Re ulation Fee
543 NM Gross Receipt Tax
547 Computer Supplies
Total Reimbursable Expenses
Page 2 of 2
PA VE
AN ATLAS COMPANY -
June 16, 2020
Mark Haberer, PE, CM
Director of Aviation I Principal
mhaberer@team•psc.com
Parkhill, Smith & Cooper
4222 8Se' Street
Lubbock, Texas 79423
Re: Construction Materials Testing
LOB Terminal Apron Rehabilitation
Lubbock, Texas
Dear Mr. Haberer:
We greatly appreciate the opportunity to provide you with a fee proposal for the subject project. Please
note that this should not be taken as a lump sum proposal as all testing will be billed on an as -needed basis
according to the fees shown. This proposal is based on our plan review and the provided CMT RFP.
We look forward to working with you on this project. If you have any questions or need any additional
information, please feel free to contact me.
IN WITNESS WHEREOF, this Agreement is accepted on the date written below and subject to the terms and
conditions stated below.
CLIENT:
SIGNED:
TYPED NAME:
TITLE:
DATE:
PaveTex Engineering, LLC
/,,(. /14.,-
Cole Hutson, P.E.
General Manager
June 26, 2020
Construction Materials Testing
Fee Schedule
PaveTex
12804 County Road 2500
Lubbock 4
Office (806) 771-7283
PAVE
L
AN ATLAS COMPANY -Fax (806) ??1-7062 I
Date: March 19, 2020
Laboratory Tests
soils
Fee
Qty.
Extension
Standard Procdor 4' mold
$
160.00
2
$
320.00
Atterbe Umits
$
70.00
2
$
140.00
Classification of soils One washed d
$
75.00
2
$
150.00
A reates
Dry Gradation
60.00
6
$
360.00
Washed Gradation
$
75.00
8
$
600.00
Magnesium Soundness
$
350.00
8
$
2 800.00
L.A. Abrasion
$
325.00
7
2,275.00
Micro-Deval
$
350.00
5
$
1.750.00
Flat and Elongated
$
100.001
7
$
700.00
Crushed Face Count
75.00
5
$
375.00
Decant
$
76.00
8
$
600.00
Deleterious
$
75.00
8
$
600.00
Fineness Modulus
$
70.00
1
$
70.00
Inorganic Impurities -Color Test
$
100.00
2
$
200.00
Atterberg Limits
$
T0.00
2
$
140.00
Sand Equivalent
$
125.00
3
$
375.00
Bar Linear Shrinkage
$
50.00
2
$
100.00
Hot Mix
Asphalt Content (Ignition) / Gradation
$
160.00
10
$
1.600.00
Lab Molded Density set of 3
$
160.00
30
$
4.800.00
Max Theoretical Density/ Rice Gravity
$
330.00
BE
$
3,900.00
Core Thickness Test
$
10.00$
600.00
In Place Densityfrom cores
$
35.00
60
$
2.100.00
Hamburg Wheel Tracking
$
500.00
1
$
500.00
Residue by Distillation
250.00
Field Testin
W
Nuclear Field Densi 3 min
$
25.00
Slum
25.00
Entrained Air
$
35.00
Temperature
$
5.00
70
$
350.00
Making Cinders ea 4 min Incld breaks
30.00
88
$
2.6410.00
Concrete Cores per Inch min 4'
$
15.00
6T2
$
10 080.00
Makin Beams ea Incld breaks
$
60.00
96
$
5,760.00
Technician / IneeHn / Administrative
Technician HourlyTwo hour minimum
$
59.00
250
$
14.750.00
Technician Overtime Hourly"
$
.001
50
1
3.450.00
Technician Hourly (pick-up, strip, cure
$
59.00
15
885.00
Administrative/Clericat 1 hr minimum montw
$
59.00 1
12
$
708.00
QA tingency is
5,000.001
1
5.000.00
tiEstimated Total
1
$
73 60$.00
' Field testing Is billed in addition to Tech hourly rates
" Hourly rates apply portal to portal, between 8:00 am and 5:00 pm. Monday through
Friday. Overtime rates will be applied when services are provided outside of the before
mentioned hours.
PARKHILLSMITH&COOPER
In
Mr. Cole Hutson, PE, General Manager
PaveTex Engineering, LLC
12804 CR 2500
Lubbock Texas 79404
Re: City of Lubbock ITB No. 20-15341-JM - LBB Terminal Apron Rehabilitation
Dear Mr. Hutson:
4222 85th Street
Lubbock. Texas 79423
806.473.2200
June 15, 2020
Parkhill, Smith & Cooper, Inc. (Parkhill) is preparing a proposal to provide construction phase services
on the referenced project. We invite Pavetex to join our team in providing construction materials testing
(CMT) services. If interested, please prepare a proposal to include all testing services per attached
documents and in accordance with the proposed phasing plan. Specifically, CMT services shall include
at a minimum:
1. Section P-153: Compressive strength per ASTM D4832. 1/day of placement. Assume
12 placement days.
2. Section P-153: Consistency verification. 1/day of placement. Assume 12 placement days.
3. Section TxDOT 341: Assume 1/project for all aggregate tests in specification and summarized in
Construction Management Plan (CMP).
4. Section TxDOT 341: For all production testing specified, assume eight placement days with
10 lots and 30 sublots. Include all QA testing requirements accordingly.
5. Section P-501: Assume 1/project for all aggregate tests in specification and summarized in CMP.
6. Section P-501: Assume 12 placement days and a total of 16 lots and 48 sublots. Include all QA
testing requirements accordingly.
7. Section P-608: Verify emulsion dilution and Residue by Distillation or Evaporation per
ASTM D6997 or D6934 at 1/project.
8. Section P-610: Assume 10 placement days. Include all QA testing requirements accordingly.
9. Section D-751: Assume 12 trips and three density checks per trip for backfiil compaction around
infiltration structures.
10. Include $5,000 testing contingency for unforeseen QA testing requirements.
Included for your reference are Plans, Project Manual. and Bid Form. Furthermore, the CMP is Included
as an appendix within the Project Manual. The CMP includes a detailed table of QA tests required.
appreciate your effort to provide a proposal for CMT by noon June 17, 2020 if possible, and I look
forward to continuing our partnership with PaveTex.
Sincerely,
PARKHILL, SMITH & COOPER, INC.
By Z
ark D. Haberer, PE, CM
MDG/dg Project Manager
Enclosures
11Data1WM1ect81201712714.17100_ADMIM00 CONTR102 CONSULTICMT1Consvucdon PhaselCMT RFP e-15-2020.docm
Abilene Albuquerque Amarillo Arlington Austin 0 Paso Frisco Las Cruces Lubbock Mxad team-psc corn
Project Fee and Budget Sheet
(Hourly/Billing Rates)
Today's Date: Aril 6, 2020
Prepared By: Sam Wyatt
Principal: Mike Ramirez
Project Manager: Sam Wyatt
Project Name: LBB Terminal Apron Rehabilitation _
Project Number: 1271417,00
Task/Discipline: SRVY
Projected Start Date: March 1, 2021
Fee (Revenue) Type: Hourly Rate w/Max
Markup on Direct Expenses: 15.OD%
Markup on Reimbursables: 15.00%
Fee costs Summary
(Profit and Markup Included in Total Fee)
Labor Cost: $3,168
Direct Consultants:
Direct Expenses:
Reimburable Consultants:
Reimbursable Expenses: $718
Total Fee: $3,993
Fee Summary
(OH and Profit In Labor, Markup Included in Directs and Reimbursab!es)
Labor: $3,168
Directs:
Subtotal: $3,168
Reimburables: $825
Total Fee: $3,993
$4,000
Page 1 of 3
No Text
Relmburable Expenses Project: Project No: Task: Current Fee:
Expenses NOT Included in lump sum fee. These are bided to client, Including markup, if allowed.
Reimbursable Consultant Costs Amount
bix Structural Consultant
512 Mech/Elec Consultant
S13 Environ/Clvii Consultant
514 Architectural Consultant
515 Testing Consultant (6eotech, CMT, TAB,
516 meying Consultant
517 Interior Design Consultant
528 Other Consultant - Kitchen / Food Consul
Sib Other Consultant - Acoustical Consultant
S38 Other Consultant - AV/ IT Consultant
Sig Other Consultant
ibursable Expel
521 Travel
Motel
Air Travel
Parking
Car Rental
Mileage
Days@
Men @
Air Fare @
Men @
Days @
/Day
Days @
/Day
30 Miles @
$0.585 @
522 Reproductions
Blackline / Color Plots
34" x 22"
36" x 24"
42" x 30
Other
Mounting Foam Board
Printing:
Set Up Fee
8-1/2" x IV B&W
8-1/2" x IV Color
11" x 17" G&W
11" x 17" Color
Binding Cost
Laminating
Scan to file
Burn to CD/OVD
Scan Specs
Scan Orawings
523 Mod
524 Telei
525 Meal
526 Fieid
528 Posti
528 Post;
530 Mlsc
53
S34 Offio
535 CAD(
539
543
S47
Fee
/Man -day
/Man a
a
1 Trips = $17.SS
Subtota
Shts @
$2.50 /Sht @
Sets =
Shts @
$2.75 /Sht @
Sets =
Shts @
$3.25 /Sht @
Sets =
sf @
S0.5S /sf @
Sets a
Boards @
$10.00 /ea @
Originals @
$0.15 /Sht @
Submittals =
Originals @
$0.09 /Sht to
Sets a
Originals @
$0.55 /Sht @
Sets =
Originals @
$0.18 /Sht @
Sets -
Originals @
$1.05 /Sht @
Sets =
Sets @
$2.00 /Set
Shts @
$2.00 /Sht
=
CO/DVD @
$13.50 /each
a
Originals @
$0.15 /Sht
Originals @
$1.50 /Sht
=
Page 3 of 3
Expenses
$18
Parkhill, Smith & Cooper, Inc.
Hourly Rate Schedule
January 1, 2020 through December 31, 2020
Client: City of Lubbock, TX
Project: LBB Terminal Apron Rehab
Agreement Date: September 24, 2020 Location: Lubbock, TX
HOURLY HOURLY HOURLY
CLASSIFICATION RATE CLASSIFICATION RATE CLASSIFICATION RATE
SUPPORT STAFF 1
$S5.00
PROFESSIONAL LEVEL 11
PROFESSIONAL LEVEL V
Trainee
Mechanical & Electrical
$120.00
Mechanical & Electrical
$206.00
Design/Engineer Student
Civil & Structural
$119.00
Civil & Structural
$208.00
Design/Engineer/Survey Technician
Architect
$115.00
Architect
$194.00
Administrative Assistant
Design Intern
Word Processor
i Landscape & Interior
$155.00
File Specialist
Landscape & Interior
$107.00
Construction Project Manager
Design Intern
Geologist
SUPPORT STAFF 11
$93.00
Planner
Resident Project Representative
Design/Engineer Student
Resident Project Representative
Technologist
Design/Engineer/Survey Technician
Technologist
Project Assistant
CADD
Project Assistant
Surveyor
Administrative Assistant
Surveyor
Client Manager
Project Assistant
Clerkal Supervisor
Word Processor
PROFESSIONAL LEVEL Vi
File Specialist
PROFESSIONAL LEVEL III
Mechanical & Electrical
$233.00
Mechanical & Electrical
$143.00
Civil & Structural
$224.00
SUPPORT STAFF III
$302.00
Civil & Structural
$148.00
Architect
$216.00
Design/Engineer Student
Architect
$130.00
Design/Engineer/Controls/Survey Technician
Design Intern
Landscape & Interior
$198.00
CADD
Construction Project Manager
Administrative Assistant
Landscape & Interior
$118.00
Geologist
Project Assistant
Design Intern
Resident Project Representative
Proposal Editor/Technical Writer
Resident Project Representative
Technologist
Technologist
Surveyor
PROFESSIONAL LEVEL I
Project Assistant
Client Manager
Mechanical & Electrical
$106.00
Surveyor
Civil & Structural
$106.00
PROFESSIONAL LEVEL VII
Architect
$106.00
PROFESSIONAL LEVEL IV
Mechanical & Electrical
$251.00
Design Intern
Mechanical & Electrical
$169.00
Civil &Structural
$245.00
Civil & Structural
$172.00
Architect
$234.00
Landscape & Interior
$101.00
Architect
$160.00
Design Intern
Landscape & Interior
$211.00
Planner
Landscape & Interior
$128.00
Construction Project Manager
Resident Project Representative
Resident Project Representative
Resident Project Representative
Technologist
Technologist
Technologist
Project Assistant
Project Assistant
Surveyor
Surveyor
Surveyor
Clerical Supervisor
Expenses: Reimbursement for expenses as listed, but not limited to, Incurred In connection with services, will be at cost plus 15 percent for items such as:
1. Maps, photographs, postage, phone, reproductions, printing, equipment rental, and special supplies related to the services.
2. Consultants, soils engineers, surveyors, contractors, and other outside services.
3. Rented vehicles, local pubic transportation and taxis, road toll fees, travel, and subsistence.
4. Special or job -specific fees, Insurance, permits, and licenses applicable to work services.
S. Mileage at IRS -approved rate.
Rate for professional staff for legal proceedings or as expert witnesses will be a rate one -and -a -half times these Hourly Rates. Excise and gross receipt taxes, if any,
will be added as an expense.
Foregoing Schedule of Charges Is incorporated into the Agreement for Services provided, effective January 1, 2020 through December 31, 2020.
After December 32, 2020, invokes will reflect the Schedule of Charges currently In effect.