HomeMy WebLinkAboutResolution - 1107 - Accept Paving Improvements - WD Turner Co - University Ave Widening, 4Th To 19Th - 05/27/1982i
JI RESOLUTION 1107 - 5/27/82 11
RRSnTITTTOM
RESOLUTION ACCEPTING PAVING IMPROVEMENTS ON A PORTION OF UNIVERSITY
AVENUE AS DESCRIBED BELOW:
WHEREAS, The City of Lubbock passed a resolution on June 18th, 1981
authorizing the construction of street improvements by W. D. Turner
Construction Company on a portion of the following:
University Avenue Widening from 4th Street to 19th Street under
Contract GWO 11,558;
AND WHEREAS, the improvements upon the said portion of University
Avenue have been inspected and found to have been constructed according
to the approved plans and specifications.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS
Im
That the improvements on said portion of University Avenue be, and
the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the final payment to the Contractor in the amount of
$23,050.08.
II.
This resolution shall take effect and be in force after its passage.
PASSED AND APPROVED THIS 27th DAY OF MAY, 1982.
AT WST:
E lyn Gaf f1ra, ty Sec ety
AP/PROVED A TO CONTENT:
Don Je ings, C' y Engineer
APPROVED AS TO FOR11:
C e.
hn Ross Jr., City Attorney
r
Z� Z*41 9
Bif-1 McAlister, Mayor
V MONTHLY ESTIMATE
- P►Y. �� 191. CITY. OF LUBBOCK
Prot _University Avenue widening. from 4th Street to 19th Street Project No. GWO 11,558
Contractor: W. D. Turner Construction Company Estimate No. FINAL
Address: 3002 50th Street Contract $ 841,511.65
Lubbock, Texas 79413 23,415.00 C.O.No. 1
864,926.65
Estimate Period From 5-1- ,19 82 to 5-27- '19 82
on First estimate and final estimate use actual work dates
ITEM _ UNIT OF PROJECT WORK DONE CONTRACT
- MEASURE EST. OUANTITIES ON CONTRACT PRICE AMOUNT
1. 6" thick concrete-.pa-ving with
91
thickened edges using 5%
Air -Entrained T.H.D. Class "C"
3,600 psi concrete including
subgrade preparation. Complete f
in place, per square yard: S.Y. 15.650 17,03U.bb 1 $ 24.60 1 418,954,24
1-1/2" compacted T.H.D. TvPe "C' I I I
A.C. Paving. This bid item wil i I
require the removal of existingI
A.C. avin -and•-base reconstruc4t j
subgrade, 6" of compacted
caliche base, and repave.__
Complete in place, per square
yard: I S.Y.! 1.070 { 969.21 { S 5_qn { 5,718.34
6" concrete curb and gutter{ I ( I
•aiid/or 30" separate gutter ! i
including No. 6 deformed dowel i
tlo the curb line on 5 foot I I I ! I
centers, including subgrade
preparation; complete in place,
per linear foot; I L.F. 5,050! 5,652.40 I 29,675.10
4. OPTIONAL BID ITEM - (OMIT)
iCe Total Amount of Work Done ... , ...
S
Less 10% Retained ......
Difference ...................
$
Less Special Deduction ...........
S
Less Liquidated Damage , ........
S
c
S
Amount Due this Estimate.........
f
iCe Total Amount of Work Done ... , ...
S
Less 10% Retained ......
Difference ...................
$
Less Special Deduction ...........
S
Less Liquidated Damage , ........
S
Less Previous Payments...........
S
Amount Due this Estimate.........
S
I
` MONTHLY ESTIMATE
CITY. OF LUBBOCK
ProjectUniversity Avenue Widening from 4th Street to 19th Street Project No. GWO 11.558
Contractor. W. D. Turner Construction Company Estimate No. FINAL
Address; 3002 50th Street - Contract S841,511.65
• Lubbock, Texas 79413 23,415.00 C.O.No.l
864,`926'.65
Estimate Period From 5-1— -19 8210 5-27,-1982
! On First estimate On; final estimate use actual work dates
!
` ITEM
UNIT OF PROJECT WORK GONE CONTRACT
MEASURE EST. QUANTITIES1 ON CONTRACT PRICE AMOUNT
k` 5. Reinforced -concrete (3,000#/7
day) 5" thick driveway returns
and.parking areas includiniz
I subgrade preparation; -complete
iri place, per squareyard;
S.Y.- 2200 2,624.02 $
19.80 51,955.60
6. 4" thick sidewalk construction
including sub rade preparation;
( C
complete in prlace, per square
I
yard;
S.Y. 571 1 673.66
17.50 11 789.05
7. 4" thick exposed aggregate
I
sidewalk construction includin
e. Der s
8. Concrete paving removal and ! l -�--
disposal, including breaking
up, removing, and satisfactor
disposing of existing paving
locations shown on the plans
per square yard of removal an
disposal;
9. Concrete slab removal and
disDosal. (sidewalks. medians
.) incl
,316.25
breaKing up, removing, ana l
satisfactorily disposingper I
squareyard;_ ! S.Y. 3,360 i3,993.55 S 5.40 21,025.17
APPROVED:
Engineer
1
'.*Pt. Mead
r. DIRECMR—•
Oatc
Date
'— Date
•: o++ice Tota! Amount of Work Done .. S
>ns b
Less 10% Retained ............ S
Difference .. S
Less Special Deduction ....... S
DVI
Less Liquidated Damage .......S
Less Previous Payments ............ S
Amount Due this Estimate......... S
iz MONTHLY ESTIMATE
CITY OF LUBBOCK
Project: University Avenue Widening from 4th Street to 19th Street Project No.
i
i Contractor. W. D. Turner Construction Company Estimate No.
Address: 3002 50th Street - Contract S
Lubbock. Texas 79413
Estimam Period From 5-1- , 18 82 to 5-27- • 1g 82
on First estimate and final estimate use actual work dates
GWO 11,558
FINAL
841, 511.65
23,415.00
864,926.65
C.0_.No.1
STEM
UNIT OF PROJECT WORK DONE CONTRACT
MEASURE EST. QUANTITIES ON CONTRACT PRICE
AMOUNT
t 10. Concrete pavement sawing.
Thickness-of concrete pavement
varies from 6" to 9". De th of
sawing to be-as required to
I
separate and obtain smooth and
clean vertical joint at locationsI
as shown on the plans, per
linear foot;
L.F. I15,650I
13,33 .05
88,671.43
11. Curb and gutter removal and
I
t disposal including-existing-
ncludin -existinmonolithic
monolithiccurb which will be I
sawed one foot from face.
Sawing is in Item 10 above
a Per linear foot of removal{
disposal;
L.F. I
27.16
2.52
16,700.44
12 -Removal and disposal of A.C. {
I {
paving in existing esplanades I
I
+
and other areas to sub rade
depth for new concrete paving I
{
I
{
construction. Removal and
isposal per square yard;
S.Y. i
5,085 I 5,680.91
8,407.75
I
I I
13. Removal and disposal of storm I
I I
sewer inlet boxes, including;
I
breaking up, removing, and I
I
{
sates actorily disposing of
inlet boxes. Removal and
i
dis osalper box; !
! !$
500.00
! i
APPROVED: _
a t
Engineer Date
=wpt. Head - - Date
_
DIRECTOR—Date - --- Dau
For Enor'i Office _
Calculations by:
CneCkCC VV:
Tota! Amount of Work Done ..
Less 10% Retained ......... .. S
Difference ................:.. S
Less Special Deduction ........... S
Less Liquidated Damage _ .......... S
Less Previous Payments ........... S
Amount Due this Estimate......... S
foot clear •o eni '
MONTHLY ESTIMATE
inlet boxes, complete in place
CITY. OF LUBBOCK _
Proje= University Avenue Widening
from'4th Street to 19th Street
Project No.
GWO 11,558
Contractor: W. D. Turner Construction Company,•
Estimate No.
FIS'
Address: 3007 50th Street '
15. 24" I.D. Class Two Reinforced
Contract $
841.511.65
'
23,415.00 C.O.No.l.-
• Lubbock, --Texas 79413
-
!
864,926.65
Estimate Period From 5-1-
18 82 to 5-27-
19 $2
on First estimate and rinai estimate Use actual work dates
foot.; L.F. !
-
=
" -
UNIT OF PROJECT ` ViORK DONE CONTRACT
MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOuhrr
foot clear •o eni '
inlet boxes, complete in place
as shown on the plans; er "each Ea.!
3 1,200.001.
3
15. 24" I.D. Class Two Reinforced
concrete pipe furnished and !
installed for lead lines, ! (
!
complete in place, per linear!
!
foot.; L.F. !
56
20
1 120.00
16. Relocation of Texas Tech chain I
!
link fence as shown on the pland.I
!
complete in place
Completed 1 $
775.001
775.00
17..TEXAS TECH WATER SPRI FR
SYSTEM CONSTRUCTION !
Installation of 1" P V C S, 0 160I
i
water lines approximately 8" !
!
cut, complete in place, Der ! i
linear foot L.F.I
! 00 i$
2.25
2,025.00
Installation of 1" single lug
quick coupler connections, to
dimensions as shown on SECTION + !
!
VII (Construction Detail
Illustration), including concretle
doughnuts salvaged from existin !
sprinklers stem, complete in I
place, per each; Ea. i
32 `: 37 !$
27.00
999.00
APPROVED: -
I For Ennes office
calculations by:
}fetkeQ DYs
Tota Amount of Work Done ....... S
Less 10% Retained ......... S
Difference .................. su
Less Special Deduction ........... S
Less Liquidated Damage ...S
Less Previous Payments ............ S
Amount Due this Estimate......... S
Engineer Date
I_
Dept Head Date
DIRECTOR-. -. pate
r MONTHLY ESTIMATE
CITY. OF LUBBOCK
Project: - University Avenue Widening from 4th Street to 19th Street Project No.
Contractor: W. D. Turner Construction Company Estimate No.
Address: 3002 50th Street Contract S
Lubbock, Texas 79413
Estimate Period From 5-1- , 19L 82 to 5-27- 19 82
on First estimate and final estimate use actual work Cites
GWO 11,558
FINAL
841, 511.65
23,415.00
864,926.65
C.O.No.l
ITEM UNIT OF I PROJECT,WORK DONE CONTRACT
MEASURE EST. QUANTITIES ON CONTRACT PRICE
AMOUNT
18. No. 6 deformed steel bar .dowels,
12' in length, and vertical holes,
drilled in existing concrete
paving to accomodate dowels to
be placed in paving and epoxied
i
in place prior to median
construction. Complete in place,
per dowel epoxied i
2,350
1.50 4,447.50
19. No. 6 deformed steel
16n-in length, and-8" dee
horizontal holes drilled in
existing concrete paving to I
Accomodate dowels to be placedl
in paving and epoxied in lace !
prior to construction of new I
I I
concrete paving. Complete in I !
I
-place, per dowel epoxied in !
I
place; I
11900 ! 2,198
1.60 -3,516.80
20. Sawing-and installation of I i
Neoprene SERVICISED COMPRESSIONI
' SEAL". This item will consist I i
of sawing a 1/2" wide and 2"
deep joint in the concretI
i
paving and installing a 1-1/4"
wide and 1-1/2" deep "Neoprene i I
I
SERVICISED-COMPRESSION SEAL"
!
(Trade name of GRACE CONSTRUCTT I
PRODUCTS) ora product of com azrable
quality ands eiformande-,to be
j
jj canstructed at-:locations as
l
j -directed --by . the, Eli ineer -com late
II in place, per.linear..foot; i L. F.- 16.550 , 24,594.77 S
4.79 j 117,808.95
APPROVED: l For Enors Office
1 -
- - - - - calculations by,
. _
engineer Dace
- (Less
neckeC DY:
Dept. Mead a•t•
DIRECTOR— - Date
Tota! Amount of Vkrk Done ....... s
Less 10% Retained .......... . s
Difference ................... S
Special Deduction ........... S
Less Liquidated Damage ......... $
Less Previous Payments........... S
Amount Due this Estimate......... S
• IYIV1�[ 1 llL. i G.71 ilY1/1 i G
CITY. OF LUBBOCK
Proms University Avenue Widening from 4th Street to - 19th S r t Project No.
Contractor. W. D. Turner Construction Company Estimate No.
Address: 30Q2 50th Street Contract S
• Lubbock. Texas 79413-
Estimate Period From 5-1- , 1982 tC -5-27- 79 82
On First estimate and final estimate use actual work pates ..
GWO 11,558
FINAL
841,511:65
23,415.00 C.O.No.l
'964,926.65
ITEM -
UNIT OF PROJECT WORK DONE CONTRACT
MEASURE EST. QUANTITIES1 ON CONTRACT PRICE AMOUNT
21. 6" concrete curb and' utter
and/or 30' separate gutter
including sub rade preparation,
complete in place, per linear
j
foot;
L.F." 4300 I $
5.25 2,049.18
-
I ,
22. Wheelchair rams constructed
!
with new sidewalk constructionI
to dimensions' as shown in
SECTION VII (Construction
Detail Il lus t -ration
i .
subgrade preparation, complete -1
!
in place, per each;
Ea. 10 2 $
300.00 600.00
I
23. 4" x 8" a
1 I
constructed on 3.500 vsi caneret�P
base as shown in Construction
-Detail Illustrations. Comnletei
in place, per square foot; 1
S.F. 17,046 1 17,648.40
1110,302.50
• I
!
i
Change -Order No. -1 I
f I cwmnlPt-PA I
27,153.63
I
I I �. !
-
I l !
j 1
I
!
I
APPROVED:
Engineer Date
"
Dept. Data.,.Less
ulaecr�R— r Gats
_
( For Ener=i Orrice
Total Amount of Vw'cri: Done .... _ .. S 974,202.43
calculations by:
Less 10% Retained ........... S 0
Difference ................. S 9'74, 202.43
Less Special Deduction ........... S 81,856.75
CneCked DY: -
Liquidated Damage .... ... S ---
869,295.60
Less Previous Payments.. .
23 050.08
Amount Due this Estimate.......... S '