HomeMy WebLinkAboutResolution - 1191 - CO#3 To Contract - Mccullough Co - Water Distribution Main - 08/26/1982JWF:da RESOLUTION RESOLUTION 1191 - 8/26/82 See Reso. 922, 9/24/81 for original contract BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock Change Order No. 3 to be entered into with McCullough Contracting Company with respect to Water Distribution Mains under W.W.O. 11606, attached herewith which shall be 'spread upon the minutes of the Council and as spread upon the minutes of this ;Council shall constitute and be a part of this Resolution as if fully copied 'herein in detail. !Passed by the City Council this 26th day of Ampu n t 1982. r Of ILL MCALI R, MAYOR !ATTEST: i Evelyn Ga fga, City 2ree ry-Treasurer i !APPROVED AS TO CONTENT: i Guy Wi on, Water Utilities Engineer 1 APPROVED AS TO FORM: • r J. WVth Fullingim, Assistant CfXy Attorney RESOLUTION 1191 - 8/26/82 See Reso. 922, 9/24/81 for prig. Change Order No. 3 �ontract. Water Distribution Mains Pump Sta. No. 9 to 4th.St. & Chicago Ave. Water -Treatment Plant to Pump Sta. No. 4 Memphis Ave. 82nd St. to 98th Street. W.W.O. 11606 To: McCullough Contracting Company P.O. Box 957. Murfreesboro, Tennessee.37130 Original -Amount of -the Contract Change Order #1 (Retainage 10% to 5% Change Order:#2 Amended Amount of Contract Change Order #3 Amended amount of contract $2,995,046..90 NONE $ 1,213.64 $2,996,260.50 $_, ',23.57 —1 007, d1pG.$3 WHEREAS, it is desirable to make changes in the plans and specifications for this project; THIS AGREEMENT WITNESSETE: In consideration of the mutual advantages 'gained, the Owner and the Contractor agree to the change shown herein and in the attached exhibits and data and the Owner and the Contractor agree that the original contract between them shall be modified'and amended to the extent herein indicated. All alterations in this change order were made before execution. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this -the 26th day of August, 1982.. CITY OF LUBBOCK OWNER I", By yor ATTEST: PPM RECOMMENDED FOR APPROVAL: Chief�E ineer, Water Utilities Engr. Attachment .to Change Order No..3 McCullough Contracting Company W.W.O. 11606 EXPLANATION OF'CHANGE: 1. Precautionary thrust restraint and additional blocking at 98th ' Street and Memphis Avenue. 2. 54" valve box alterations. 3. Assisting in repair of water pressure break at Pump Station No. 10.. 4. Grade change @ Sta. 67•'+ 00, on N.W. Distribution Main.. 5. Closure @ Pump Station No. 9. BREAKDOWN OF CHANGE (1) Charges due to precautionary .thrust restraint and.additional blocking at 98th Street and .Memphis Avenue. LABOR Placing, Blocking and assisting G.H.A. during welding $100.00 Crane Operator $187.00 $287.00 EQUIPMENT Linkbelt Crane (2 days @$340.00) $680.00 Generator (2 days @$ 40.00) $ 80.00 . 50 Ft. Air Rose $ 20.00 $780.06 MATERIALS 3 C.Y. Concrete $159.00 $159.00 Sub Total $1226.00 Profit and overhead @ le %45'17P $ /88 .90 TOTAL $1373.12 (2) 54" Valve Box alterations LABOR Casting Concrete in place (4.5 C.Y.) $600.00 $600.00 EQUIPMENT Crane to set 108" R.C.P. Box (4 hrs. @ $90.00). $360.00 $360.00 MATERIALS Built-up footing for 108" R.C.P. $238.00 (4.5 C.Y. concrete) Additional cost for 108" box 108" R.C.P. - $2804.00 96" R.C.P. - $2000.00 Difference in Cost $ 804.00 $804.00 Forming material $258.00 Reinforcing Steel $ 50.00 $1350.00 Sub total = $2310.00 Profit and overhead @ 4=017e $ 20t 3516.E TOTAL 0) Assisting in repair of water pressure break at Pump Station No. 10. LABOR Two operators for 4 days $616.00 $616.00 EQUIPMENT HSP Crane 4 days @$190:00/day $720.00 Backhoe 4 days @$180.00/day; $720.00. JI480.00 Sub .Total $2096.00 profit and overhead @15°Za ;TOTAL ta347-ft ' r�, 410-40 (4) Grade change @ Station 67 + 00 on N.W. Distribution Main. Note: Power lines were found to be on Pipe.Grade'Fiiday, April 2, 1982. Grade adaptors were ordered same day. Grade adaptors arrived on site Monday morning approximately 10:30 A.M. One Joint of pipe had to be taken up and relaid in order to adjust grade enough to get under power lines. LABOR Superintendent = 2 Hrs. @ 14.42 $ 28.84 Exp..; for .Super- =.:25 Day- @30.00/Day $ 7.50 Foreman - 6 Hrs. 12.50/Hr. $ 75.00 Exp. for Foreman.- .75 -Day @20.00/D. $ 15.00 Operators -2 Ea. .for•A Hrs. @7.00/Hr. $ 56.00 Laborers -4 Ea. for 4 Hrs. @ 5.00/Hr. $ 80.00 - -5 Ea. for 4 Hrs. @ 4.50/Hr. $ 90.00 $ 352.34 EQUIPMENT Linkbelt 5800 Backhoe 0.5 Day @ 275.00/Day $137.50 Linkbelt HSP 22 Crane 0.5 Day @ 190:00/Day Two.Ton Truck -Chevy 0.5 Day @ 92.00/Day $ 46.00 Ford Pickup Truck 0.5 Day @ 28.00/Day $ 14.00 Case 580 D Backhoe .05 Day @ 60.00/Day $ 30.00 Tool Trailer .05 Day @ 3.00/Day $ 1.50 Diesel Fuel & Grease $ 16.00 Pontiac Cai 0.25 Day @ 20.00/Day 5.00 $ 345.00 Fringe Benefits @ 20% of 352.34 $: 70.46 $ 70.46 MATERIAL (G.H.A.) Invoice No. 311496 (grade adaptors) $ 556.00 Sub Total $1323.80 Profit and Overhead @ 152 TOTAL $1522.37 (5) Closure @ Pump .Station No. 9. MATERIAL ..(G.H.A.)'Invoice No. 311509 $1218.00 36" Dished Head Plug, 50% allowed on return, Invoice No. 311510 260.00 $1478.00 LABOR AND EQUIPMENT (1) -To expose existing 36" Pipe Labor: Operator -1 Ea. for 1 hr. @ $7.00/Hr. 7.00 Laborers -2 Ea. for 1 hr. @ $4.50/hr. 9.00 16.00 Fringe @.20% of $16.00 3.20. Equipment: Cat. 215 Backhoe for 1 Hr. @ $22.50/Hr. 22.50 $'-.41.70 (2) Haul pipe to and from G -H -A for modification Labor: Driver -1 Ea. for 2 Hrs. @ $5.00/Hr. 10.00 Fringe @ 20% of $10.00 2.00 Equipment: Chevy 2 Ton Truck for 0.25 Day @ $92.00/Day 23.00 $ 35.00 (3) Installing Closure Labor: Superintendent -4 Hrs. " @ $14.42/Hr. 57.68 Expenses for Super. - 0.5 Day @ $30/Day 15.00 Foreman -8 Hrs. @ $12.50/Hr. 100.00 Expenses for Foreman - 1 Day @ $20/Day 20.00 Operator - 10 Hrs. @ $7.00/Hr. 70.00 Laborers -1 Ea. for 9 Hr. @ $6.50/Hr. 61.75 3 Ea. for 9 Hrs. @ $5.00/$r. 142.50 466.93 -Fringes @ 20% of $466.93 93.37 93.37 Equipment: Linkbelt ESP22 Crane 1 -Day @ .$190.00/Day, 190.00 Case 580 Backhoe - 1 Day @ $60.00/Day 60.00 Ford Pickup Truck --1 Day @ $28.00/Day 28.00 Tool_Trailer - 1 Day @ $3.00/Day 3.00 Pontiac Car - 0.5 Day @ $20/Day 10.00 Diesel Fuel and Grease 30.00 321.00 (4) Grouting in Closure Labor: Foreman - 8 Hrs. @ $12.50/Hr. 100.00 * Operator - 1 Ea. for 5 Hrs. @ $7.00/Hr. 35.00 Laborer'- 1 Ea. for 8 Hrs. @ $6.50/Hr. 52.00 Laborer - 1 Ea. for 8 Hrs. @ $5.00/Hr. 40.00 227.00 * Used as Laborer Fringe @ 20% of $227.00 $ 45.40 45.40 Equipment: Ford Pick -up -1 Day @ $28.00/Day 28.00 28.00 SUB TOTAL $2736.40 Profit & Overhead @ 15%. 410.46 TOTAL $3146.86 t Item No. 1 $ 1373.12 Item No. 2 $ 2587.20 Item No. 3 $ 2347.52. Item No. 4 $ 1522.37 Item No. 5 $ 3146.86 .. Net Amount of Change Order to. Contract$1...,.,.,..,, -,0 H n MhdrCA% zMaEn zt-naM 7F. zMaCf) .• N� m H FJ•K � n o 0 d n 0 0,$u n ° o w n H In n 0> H r n m 0_ N O. K A K A_ Pi rt m.., 0 m n 00 ODW L L 03 OD F' r r�.�� 1-n 0. w0CL¢o Nn P.'� K A (6 H Ci. rt•vm •o t w 0 to 1 NO N O rt x ao r • \O Oo 0o • ---0 o N O o rL K m °�°9 �0! �• v ya FJ• •d m @n W oto.: ON• O0�• �09 co. 1 .. �, •., roo o rt n ... K �.. _. o %Q N n 4- r V M1 a� . o • OD 0. r l� 4, rtO N "%D GOON N 41 0 N� CL o° y I to •v rt m C: CL o m m rt trti N r O H O r rt M m E Y K n O r 00 v O K n FJ• ON m m K m 10 'v E O F4 rt K H n C -4N FA H H n N� m H rt H H In n 0> H r n m o a F+ n o' ::r w o n b o' :r 0 Sat o M W �D o xo oonm 1-4 k4 o Ci. rt•vm mm :3- 0rt(D 00 IF- :3 W to m 10 m to 19 m 14 K FJ• •d m m f M F4 r 'v E3 m Fy O O p r V m rt r K t7 - W 0. N rt o FJ• o CL o C0 Pd E o 0 N� CL m to •v rt m rt m m rt m tD �D m E Y K iD K In rt FJ• K n FJ• m m m m 10 'v E O F4 m K rt `C o' 0 ° rt 0) rr O O O O O O r K W a m 0. !D t 03 r g m O to w m r r C: r r_ n tt %D N K P� K m �D �O �C H m n rt a m 0 n O' K co o n E O n n FJ- E r N N N O' CL m to rt rt F4 lb o m r rt O o 1r O n m w w N N W 1.n O CL 1-4 n C o o O m v o m rt o m CL w m m n o m W K DQ DQ �3 o rt m F+ m 10 O 1 1 1 t m 7' F'• W K r m m i� r O rt O K rt C w :3 0o rt m w F-4 m H E H n N n o m w K El O OD rt rt C CL n o v+ CL m w n K O In O OQ rt W r m O K M F4 0' n m m rt Do K m K rt O m 0 o m :r 19 o %D n O Cl. F4 0 m rt n o►c m p m O w 'v E rt m a co m o m O O F 4 C n K E m M W w H 10 rt w m K O m K r o rt K o n 0 `C m m lFJ w m `C o m F o r Ib K In rt m - rt • m O o R7 r m K N K m v :3 0 �" 0 r F4 m rt m n cr O FL `C 1010 rOt rot 0 w 0 w n rt m K O m W r3 °' K M r~ o n O n C: to rt ° FJ• C: K C 'ty K 10 O w o n o MO rt K =Id p 039 o b m o w m C: K n rt n m r Z CL n O F4 Co r M rt r r to rt Cr { F4 rt O 1- r W 1+ K C rt w rt M C: 03 m C m w r N O m r m m C: K o O' m r 10 n o F+• m 1-4 W 1) F4 K E n m a' g OQ rt O rt m n CL r m rt o CL o n o E o rt w m m F'• n rt C: CL m Oo m m 0 o 0 0 o rt m rn m K m w Do E r 0 K 00 id o FJ Dd w o. m F4 03 'v m O rt ". r o m td m O 10 o 13. rt o r -A N W K o' O r K m r o w CL o G o+ M W o x' m rt n bd F4 O O m !-L o O' K n m N m a r o m W O lb 0 K K o n m W m m n m r O r %' m CL C m o W F� .• F4 m rt o 13 n :3 r m m m- O m p 0 r rt o V F4 rr E O O m K K F4 •v o m o' rt m o m o n n- m m K .. m m m n OQ m rt rt K Rb rt E m o 03 E K F4 O K O' K K O m m w n .. n %4 0 m K m m rt o m r 0 (cr K K m r Mo n tea. r m m ro C k< n O FJ n r M .'3 W C: r rt rt m rt 114 rt CD FJ o m m CL r r ro w F4 0' m m i K Cs. F4o n m C r 1--3 w m o K m 01 m I m •• o CL N rt CL O o W o W rt m o rt o m m w F4 o C: •C m 0. K m rt K �CF&E m a r o o+ 00 r 00 o K Ps m 0 w n N I 00 n o' Cn CL m m m F4 rt n w I K m Q N O rt Cs m o 0 0 rt CL rt .E in �C r rt n o n N rt 0) F4 o m m m rt O o' O m O rt ]C O FJ- 1 CQ o rt m CL 14, m In n m rr rt o F4 W In w m m K m rt 0 o tt to O OQ w (D - 00 w w a.n ° °' rt mn Mcr m R m� n H 0w ° 1-1 rt IPI o n M r rt C: n ►d P- m M sn F4 m E 1-4 n O r rt tY :3 H E O m zwFr to K O O rt o N ::r mOQ M 0 C K W O E3 C: m O F+ m F4 C C: m rn F+• `C C w rt O O rt o m 10 03 K r K m o m m Cl =1 n o n o K m 0 n m a • rt H a bd 19 n n t7 o a o w 0' � m N m C' m O N n PV m fg 1-4 W 10 rt 0 :d O M m CL K m O m :3 a O r r O rt W K- m Om rt o K `C PW o r%4 OQ m O K rt v m goon w 0 �0mCo m o IF- N O v 0Q DQ m CL 1-4 F4 w lb rt 0)(m °rt o w am oxo m W rt o m C rr Ln o m o' rt m rt CL G, K .K K O m F4 w ts. N n m rt 6