HomeMy WebLinkAboutResolution - 1253 - Accept Paving Improvements - Kerr Co - East West Drainage Channel - 11/11/1982RESOLUTION
RESOLUTION 1253 - 11/11/82
II RESOLUTION ACCEPTING IMPROVE11ENTS ON PORTIONS OF STREETS AND/OR
AVENUES LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions
of City Ordinance 1331, the subdivider of C.M.R. Industrial Park Add.,
Lot 2 made arrangements with Kerr Construction Company for the con-
struction of paving improvements on certain streets dedicated in said
subdivision under the provisions of said Ordinance prior to the record-
ing of the subdivision plat of C.M.R. Industrial Park Addition, Lot 2:
E -W drainage channel between Lots 1 & 2, C.M. R. Industrial
Park Addition and the alley return at S. Loop 239 on the West
side of Lot 1, C.M.R. Industrial Park Addition known and desi-
gnated as New Subdivision Sub -Unit Number 14, of Unit Number
2029.
AND WHEREAS, the construction of the above improvements on the
abovementioned streets was Derformed under the supervision of the
City Engineer, and said improvements have been completed and have
been inspected and found to have been constructed in accordance with
the provisions of the City Ordinance 1331; and
WHEREAS, in conformance with the provisions of Chapter 28 of
the City Code or Ordinances, the property ovmer made arrangements
with Kerr Construction Company for the construction of paving improve-
ments on the following street:
King Avenue from its intersection with the South Lip
Line of South Loop 289 to its intersection with a line
15.00 feet North of the North property line of E. 74th
Street constructed under street use Permit No. 30-82.
AND WHEREAS, the construction of the above improvements on the
abovementioned streets was performed under the supervision of the City
Engineer, and said improvements have been completed and have been in-
spected and found to have been constructed in accordance with the
provisions of Chapter 28 of the City Code of Ordinances.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned
streets be and the same are hereby accepted and the City Engineer
be and he is hereby authorized to direct the payment of the City's
portion of the cost (and to release escrow money), if any.
RESOLUTION
(Page 2)
II.
This resolution shall take effect and be in force from and
after its passage.
PASSED AND APPROVED THIS 11TH DAY OF NOVE 1982.
r
Bil McAlister,'Mayor
ATTEST:
Evelyn Ga fga, City lge6r ry
APPROVED AS TO CONTENT:
AV7
Don J nings City Engineer
APPROVED AS TO FORM:
ohn Ross, Jr., CityA orney
%
a CONSOLIDATED FINAL ESTIMATE
C.M.R. INDUSTRIAL PARK ADD., LOT 2
Accepted Nova 11, 1982 .
QUANTITIES
COST DISTRIBUTION
Unit &
Sub -Unit Contract Cost Property Cost
N.S. 2019-14 $7,560.98 $7,560.98
King Avenue (Constructed. under street use permit No. 30-82) is total property
owner cost at the price the property owner and contractor agreed on.
NQV12198
CIiy 2
S.Y.
S.Y.
L.F.
Unit &
Drainage
Alley
L.F.-
C & G
Sub -Unit
Location
Channel
Return
C &
Removal
N.S..2029-14 E -W Drainage Channel
318.44
24.64
43.12
37.50
bet. Lots l & 2 CMR
Industrial Park and
alley return at S.
Loop 289 on W. side
of Lot 1, CMR Indus-
trial Park
S.Y.
L.F.
S.Y.
Z.F.
Unit &
Paving
Curb &
Valley
C & G
Sub -Unit
Location
6" Base
Gutter
Gutter
Removal
King Avenue from the
3,509.16
1,329.46
28.04
102.00
S.L.L. of S. Loop 289
to 15'N.. of the N.P.L.
of E. 74th St. (Con-
structed under Street
Use Permit No. 30-82)
' COST ESTIMATE
318.44 S.Y.
Drainage Channel
@ $ LUMP SUM
$6,597.67
24.64 S.Y.
Alley Return
@ $ 20.75
$ 511.28
43.12 L.F.
Curb & Gutter
@ $ 5.70
$ 245.78
:37.50 L.F.
C &-G Removal
@ $ 5.50
$ 206.25
CONTRACT COST
$7,560.98
COST DISTRIBUTION
Unit &
Sub -Unit Contract Cost Property Cost
N.S. 2019-14 $7,560.98 $7,560.98
King Avenue (Constructed. under street use permit No. 30-82) is total property
owner cost at the price the property owner and contractor agreed on.
NQV12198
CIiy 2