Loading...
HomeMy WebLinkAboutResolution - 1242 - Contract - LAP Inc - Paving Improvements, Quaker Ave Form S Loop 289 To 82Nd St - 10/21/198241 RESOLUTION 1242 - 10/21/82 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of City of Lubbock BE and is hereby authorized and directed to execute for an on behalf of the City of Lubbock a con- tract between the City of Lubbock and Lubbock Asphalt Products , for the paving improvements to be constructed on Quaker Avenue from South Loop 289 to 82nd Street (G.W.O. 11,591) in the City of Lubbock, Lubbock County, Texas, attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of. this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. PASSED BY THE CITY COUNCIL THIS 21st DAY OF October , 1982. r , Bill McAlister, Mayor ATTEST: Evelyn Gaf ga, City ecty APPROVED AS TO CONTENT: Don J nings City Engineer APPROVED AS TO FORM: hn C. Ross, Jr., City Att,qkney 10 K�" _ Texas on this day THE STATE OF TEXAS public in nd for Lubbock County. rn ewspa- F LUBBOC Kee Noor M$naeer of the SoutandsSunday, who COUNTY O Bonnie + �cc Morning. Evening E e Twi 1 a All i 1 be�ublsl��d y°Qa4;i��[orp Before me Lubbock Avalanche -JO ON, e personally appearedblishers of the that said newsgorint- ration. Pu ose and say of this Texas and the attached p pers CO sworn duty sworn did deP being by m prior to the first ins 598p84 at Lubbock Coand was printed in the Lubbock th�ed n fifty-two weeks p No. of th1original1982, _$ 60 is a trueecOP3 & copy of the dates: Avalanche -journal on the following cunt Manager JOURNAL LUBBOCK AV ALAN apes Corporation Southwestern Newsp P scribed and sworn to before me this 11th day of Sub - FORM 5&10 October 19 ,- 0l� t�nestiarT. vusr 11 it LAI s, ugh A,M, ell -the 18th ay of (7!- +$g, to Wr ish all form all work fOt llsed and Pet },frilti;.tion of the foNowing dep Proiect: ftOtvfta Paying aaP to 82nndl he expiretim of the time and Bova fill be opereddby t ed Tars he Ibr Of purchasing at his Offk6 abli;ly read aloud- , ty of the the sole_ relIt""r"tibid A 01 CITY SECRETARY •s ara -►fte4 c^c`k isst :r's M eertf to tt�' tri a ;15 setistactory yaba irk, or a -0r Party, a Ile sie surety jp Me order o1 the >ouft ec r m an a^iO" int oft Man S�, of the as ale a stun bid sub wi�� rater iMa b bidder, all necessary t and a ueredl yrfthin 10 days xfs(i1 reo ward of thecon-. er not if of a. Kt 10 h,m. idders safe reSDon- shall be each bet M¢ s,te of the i oiloy toto�nttotm himself regard• 1 M ela feral coed+dohs under whIc hall be 1 M4 work d and 8 tlh�orc hlvlin ep!'.. erstood tars a^d }dared tin the 0 b�tl wbmAted< lel ration Of M¢ Cuicati, s' enf aY he Pians SPe r e'a Cxam nedtatcthe office of the it a ok Te>`asasin9 for Me City pit¢ntibo Of Each b4dder ule oftpen �y1 tte C's ailing the8 el'O, per deem 41 P incluided in the c�ficec0lthe ages file in t lime ,city umentabn Purchasingumentissoe- 1oirecto�o� which doc ..,.notice to dire V ';n's Ann. hsCl ea(e4uiren'�nts- n ccncernin9 tby > and am, rates the P ret a scales Ofwage k Nesbitt, Of Lu ioboa P Is/F Purchasing for of _`__ NA . - Fidelity and Deposit NOME OFFICE OF MARYLAND, F City of Lubbock City Secretary City Hall 916 Texas L-jubbock, Texas CONTRACTOR: Cama �,�,- p �� _ BALTIMORE, AID. 21203 �? General Form Status Inquiry `V. .. 79401 OUR BOND NO* 6059020 T LUr-E:DCK ASPHALT PRODUCTS• INC LU'�ECCK TEXAS DESCRIPTION: STt_ET 1t�Pr0\iEVaNTS GUAKE.R AVE ST FRCS SCUTH LOOP 289 TC t52ND STREET LUEEOCK OWNER: CITY CF LUSEO%K CONTRACT PRICE 088,532.00 BOND(S) EFFECTIVE DATE 10/21/82 WITHOUT PREJUDICING YOUR RIGHTS OR AFFECTING OUR LIABILITY UNDER OUR BOND(S) DESCRIBED ABOVE. WE WOULD APPRECIATE SUCH OF THE FOLLOWING INFORMATION AS IS NOW AVAILABLE. VERY TRULY YO Se BY P.�� Q/�. %\ Paul P. Cooper, \yr. jrjanager Is IF CONTRACT COMPLETED• PLEASE STATE: APPROXIMATE DATE OF COMPLETION OF WORK (OR FINAL DELIVERY) APPROXIMATE ACCEPTANCE DATE FINAL CONTRACT PRICE S OLD IERE 2. IF CONTRACT UNCOMPLETED9 PLEASE STATE: APPROXIMATE PERCENTAGE OR DOLLAR AMOUNT OF CONTRACT COMPLETED OR DELIVERED 3s DO YOU KNOW OF UNPAID BILLS FOR LABOR OR MATERIAL? (CHECK) YES NO ESTIMATED COMPLETION DATE 4. REMARKS: (IF ANY) SIGNATURE It is understood that the information contained herein is furnished as a matter of courtesy for the confidential use of the surety and is merely an expression of TI TLE opinion.It is also agreed that in furnishing this information, no guaranty or warranty of accuracy or correctness is made and no responsibility is assumed as a result of reliance by the surety, whether such information is furnished by the owner or by an, architect or engineer as the agent of the owner. 1 9 GATE PLEASE RETURN INQUIRY TO: FIDELITY AND DEPOSIT COMPANY OF MARYLAND C315M—REV. 2.81 General Form Status Inquiry—Federal cases to be submitted in duplicate. Addressed envelopes to be attached. Sl 5541 — SUITE 1900 P' -RC CLMM ELDG 1712 COMMERCE S7k_E1 DALLAS* TX 75201