RESOLUTION �B - 11/18/82
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock Change Order No.
5 to an existing contract previously executed by said City and Jackie Cooper
Construction Co., Inc., said Change Order No. 5 being for additional improve-
ments and modifications being in the public interest and welfare, and costing
approximately $9,436.00 in additional expenditures as set forth with more
particularity in said Change Order No. 5, _attached herewith which shall be
spread upon the minutes of the Council and as spread upon the minutes of this
Council shall constitute and be a part of this Resolution as if fully copied
herein in detail.
Passed by the City Council this 18th day of November 91982.
_ ..
BM McAL STER, MAYOR
ATTEST:
elyn Gaffga, City Secretary -Treasurer
APPROVED AS TO CONTENT:
Wil D. Watson, Chief Engineer of
Water tilities
APPROV TO FORM:
J. WXrtlq/Fullingim,.Asst. City Attorney
N 23-B
�J gLReso. 923, 9/24%88(82
` CHANGE ORDER, #5
Improvements to Municipal
Water Treatment Plant and
Pump Station No. 9
Lubbock, Texas
November 8, 1982
TO: Jack Cooper Construction Co., Inc.
P. 0. Box 1153
Temple, Texas 76503-1153
General description of work included in original contract: The
construction of six rapid sand filters and a 15 mgd pump station at the
Municipal Water Treatment Plant, construction of 25 mgd Pump Station No. 9
and chlorination and electrical control building, and other related items.
Original Amount of Contract. $ 3,118,176.00
Change Order No. 1. . . . a -0-
Change Order No. 2 . . . . 4,739.00
Change Order No. 3 . . . . 15,140.00
Change Order No. 4 . . . . . 0 0 . . . . 2,600.00
Change Order No. 5 . . . . . . . . . . 0 9,436.00
Adjusted Contract Amount . . . . . . . . $ 3,150,091.00
Adjustment in Construction Time . . . . . . None
WHEREAS, it is desirable to make changes in the work to be constructed
under this project.
THIS AGREEMENT WITNESSETH: In consideration of the mutual advantage
gained, the Owner and the Contractor agree to the changes indicated below
and further agree that the amount of the contract shall be adjusted by the
amount shown above.
1. Furnish and install a water line to the
new filter pipe gallery at the Water
Treatment Plant including fittings, hose
bib, etc.
Add. . . . . . . . . . . . . . . . .
2. Furnish and install a 2-1/2 inch
diameter chlorine solution line from
Manhole C to the existing settled water
channel serving the existing rapid sand
filters at the Water Treatment Plant.
Add. . . . . . . . . . . . . . . .
CHANGE ORDER NO. 5
PAGE 1 of 2
$ 1,485.00
$ 2,849.00
3. Furnish and install a 1 -inch air and
vacuum valve on pump suction vessels
including associated piping and valves,
drain piping, heat trace, and insulation
at Pump Station No. 9.
Add. . . . . . . . . . .
4. Relocate 2 -inch air and vacuum valves
and modify piping on six (6) new
filtered water channels at the Water
Treatment Plant by installing piping
inside new rapid sand filters such that
backflow of settled water into the
filtered water channel is prevented.
Add . .
$ 3,322.00
$ 1,780.00
The aforementioned changes and work affected thereby, are subject to
all contract stipulations and covenants.
The Owner and the Contractor agree that there will not be an adjust-
ment to the time allowed for completion of the project for the above listed
changes.
IN WITNESS THEREOF, the Owner and the Contractor havehereto set their
hand this the day of ., 1982.
RECOMMENDED: PARKHILL, SMITH & COOPER, INC., Consulting Engineers
By -OF 11 tIj • Engineer._ //- 9 ,1982
APPROVED: JACK COOPER CONSTRUCTION CO., INC., Contractor
By� 19 82
APPROVED: CITY OF LUBBOCK, TEXAS, Owner
r
_ B �A QYOR
NOV 18198
1982
ATTEST:
City Secretary
CHANGE ORDER NO. S
PAGE 2 of 2