HomeMy WebLinkAboutResolution - 923B - CO#5 To Contract - Jackie Cooper Co - Improvements, WTP & Pump Station #9 - 11/18/1982JWF:da RF.gnT.TTTTnW RESOLUTION �B - 11/18/82 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock Change Order No. 5 to an existing contract previously executed by said City and Jackie Cooper Construction Co., Inc., said Change Order No. 5 being for additional improve- ments and modifications being in the public interest and welfare, and costing approximately $9,436.00 in additional expenditures as set forth with more particularity in said Change Order No. 5, _attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 18th day of November 91982. _ .. BM McAL STER, MAYOR ATTEST: elyn Gaffga, City Secretary -Treasurer APPROVED AS TO CONTENT: Wil D. Watson, Chief Engineer of Water tilities APPROV TO FORM: J. WXrtlq/Fullingim,.Asst. City Attorney N 23-B �J gLReso. 923, 9/24%88(82 ` CHANGE ORDER, #5 Improvements to Municipal Water Treatment Plant and Pump Station No. 9 Lubbock, Texas November 8, 1982 TO: Jack Cooper Construction Co., Inc. P. 0. Box 1153 Temple, Texas 76503-1153 General description of work included in original contract: The construction of six rapid sand filters and a 15 mgd pump station at the Municipal Water Treatment Plant, construction of 25 mgd Pump Station No. 9 and chlorination and electrical control building, and other related items. Original Amount of Contract. $ 3,118,176.00 Change Order No. 1. . . . a -0- Change Order No. 2 . . . . 4,739.00 Change Order No. 3 . . . . 15,140.00 Change Order No. 4 . . . . . 0 0 . . . . 2,600.00 Change Order No. 5 . . . . . . . . . . 0 9,436.00 Adjusted Contract Amount . . . . . . . . $ 3,150,091.00 Adjustment in Construction Time . . . . . . None WHEREAS, it is desirable to make changes in the work to be constructed under this project. THIS AGREEMENT WITNESSETH: In consideration of the mutual advantage gained, the Owner and the Contractor agree to the changes indicated below and further agree that the amount of the contract shall be adjusted by the amount shown above. 1. Furnish and install a water line to the new filter pipe gallery at the Water Treatment Plant including fittings, hose bib, etc. Add. . . . . . . . . . . . . . . . . 2. Furnish and install a 2-1/2 inch diameter chlorine solution line from Manhole C to the existing settled water channel serving the existing rapid sand filters at the Water Treatment Plant. Add. . . . . . . . . . . . . . . . CHANGE ORDER NO. 5 PAGE 1 of 2 $ 1,485.00 $ 2,849.00 3. Furnish and install a 1 -inch air and vacuum valve on pump suction vessels including associated piping and valves, drain piping, heat trace, and insulation at Pump Station No. 9. Add. . . . . . . . . . . 4. Relocate 2 -inch air and vacuum valves and modify piping on six (6) new filtered water channels at the Water Treatment Plant by installing piping inside new rapid sand filters such that backflow of settled water into the filtered water channel is prevented. Add . . $ 3,322.00 $ 1,780.00 The aforementioned changes and work affected thereby, are subject to all contract stipulations and covenants. The Owner and the Contractor agree that there will not be an adjust- ment to the time allowed for completion of the project for the above listed changes. IN WITNESS THEREOF, the Owner and the Contractor havehereto set their hand this the day of ., 1982. RECOMMENDED: PARKHILL, SMITH & COOPER, INC., Consulting Engineers By -OF 11 tIj • Engineer._ //- 9 ,1982 APPROVED: JACK COOPER CONSTRUCTION CO., INC., Contractor By� 19 82 APPROVED: CITY OF LUBBOCK, TEXAS, Owner r _ B �A QYOR NOV 18198 1982 ATTEST: City Secretary CHANGE ORDER NO. S PAGE 2 of 2