HomeMy WebLinkAboutResolution - 1356 - Contract - Bruce Thornton A/C Inc - Heating & A/C, FD Training Building - 03/31/1983KJ /mck
RESOLUTION
RESOLUTION 1356 - 3/31183
Bid #7302
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a contract between
the City of Lubbock and Bruce Thornton Air Conditioning, Inc. for heating and
air conditioning for training building attached herewith which shall be spread
upon the minutes of the Council and as spread upon the minutes of this Council
shall constitute and be a part of this Resolution as if fully copied herein in
detail.
Passed by the City Council this 31st day p Mar , 1983.
r
LMcALISTER, MAYOR
ATTEST:
velyn Ga fga, Ci
APPROVED AS TO CONTENT:
Tom Foster, Fire Chief
APPROVED AS TO FORM:
tary-Treasurer
6'444.�
Ken Joh son, Assistant City Attorney
CONTRACT
STATE OF TEXAS '
COUNTY OF LUBBOCK
RESOLUTION 1356 -3/31/83
Bid 7302
THIS AGREEMENT, made and entered into this 31st day of March ,
A.D. 19813. by and between the City of Lubbock, County of Lubbock, State of
Texas, acting by and through Bill McAlister , Mayor, thereunto
authorized to'do so, hereinafter referred to as OWNER, and
Bruce Thornton Air Conditioning, Incorporated
of the City of Lubbock , County of Lubbock
and State -of.-_______ Texas , hereinafter -termed CONTRACTOR.
WITNESSETH:--: That for- and in consideration of the payments and agreements
hereinafter mentioned, to be made and performed -by the OWNER and under the
conditions expressed in the -bond bearing even date herewith- (if ,any) the CON-
TRACTOR hereby agrees with OWNER to commence and complete the construction of
certain improvements described as follows:
Specifications and conditions are described and outlined in attachment "A"
as is incorporated herein by reference.
and all extra work in connection therewith, under -the terms as stated in the'
-contract documents--and--at his -{or their) own- proper�cost-and expense -to -furnish
all - mater-ials supplies, machinery, . equipment ;-.tools,: superintendence,- lab6r,_
insurance and other accessories -and -services necessary to -complete -the said -
construction in accordance with the -contract documents as defined in the General
Condition of Agreement.
The CONTRACTOR hereby agrees to commence work within ten days after the
date -written notice to do so -shall - have been given to him and to substantially
complete same within the time specified in the contract documents.
The OWNER agrees to pay the CONTRACTOR, in current funds for the perfor-
mance of the contract in accordance :with -the-- proposal--submitzed =-therefor,
subject to additions and deductions, as provided -in the contract documents and
to make payment on account thereof as provided therein.
IN WITNESS WHEREOF, the parties to these presents have executed this
agreement in Lubbock, Texas in the year and day first above written.
CITY OF LUBB , TEXAS0 R)
. BY:
MA OR - Bill McAlister
..ATTEST:
Secretary
ATTEST:
Secretary
Bruce Thornton Air Conditioning, Inc.
CONTRACTOR .
BY:1��
Bruce Thornton
TITLE: President
COMPLETE ADDRESS:
Bruce Thornton Air Conditioning, Inc.
6716 -Cedar Avenue
Lubbock, Texas 79404
Phone: 806-745-7944
i
ATTACHMENT "A"
CITY OF LUBBOCK
P.O. BOX 2000 .
LUBBOCK, TEXAS 79157
LUBBOCK FIRE DEPT,
SPECIFICATIONS FOR:
HEATING AND AIR CONDITIONING FOR
GENERAL: To Provide for All Labor, Materials and Supplies required for
installation of the following heating and air conditioning units, unless such
items are'specifically excluded from this bid. Contractor to furnish four each:
Gas Furnaces, Condenser Units, Cooling Coils and Plentums. Heating and Cooling
Units to be furnished and installed by Contractor are:
One - Fedders Gas Furnace FGUP-065-522A or Approved Equal.
One - Fedders 2 -Ton Conditioning Unit CFCO24F3B or Approved Equal.
Three -
Fedders
Gas Furnaces
FGUP-140-522A
or Approved Equal.
Three -
Fedders
Conditioning
Unit-CFC060F8A
or Approved Equal. -
Units are to be installed, complete and be operational and meet all City
and State Standards and Codes. Contractor shall furnish all permits, licenses,
and insurance.
Cooling Coils and Plentum shall be installed but NO DUCT WORK shall be pro-
vided or installed by bidder. This will be done at a later date under separate
Contract. Also to be provided by owner shall be air return box on which heating
units are to set. Contractor will use this box as a heater base and be respon-
sible for cutting holes to provide for air flow through unit.
Contractor shall furnish and install requiredventflues, and other venting
material needed for heating equipment, as well as all freon lines, condensation
lines,. and electrical lines -from circuit breakers -to condensing units. Note,
however that gas will be plumbed to equipment rooms and that ample electrical'
circuits will also be provided and breaker boxes will be in place .for hook up.
See attached mechanical schedule for electrical gas hookups required.
NOTE: If any further information is required, please contact Wayne Mahaffey,
Deputy Chief of Administration, Lubbock Fire Department, 519 Avenue K,
Lubbock, Texas or phone 762-6411 extension 2631.
•
tr ^
N
LVBgoU(- FIRE- 5TATn ON Te -MMI N L- FOC-,
MECHM I C AL SC REDUL E -
ARK
MFU
MODEL_
TON
E(EC'fRKALE
NRK RIGS
FEDDEZ,>
FGUR140-5-77-A
S -To N
115/6AS
3 FVPNBCF-S
FEDDEQS
F60P-M5-S2 4
2 TO N
115/GAS
FVP. h4NG,3=-
F EDD E ZS
CFCMOFtA
5 TO N
20$/.240-3
3 GOND. UN ITS
Fl=-tDDEP,S
CFCO24F38
Z TON
•D30-1
1 GOND UNIT -
L