Loading...
HomeMy WebLinkAboutResolution - 1467 - Accept Paving Improvements - Kerr Co - Lots 197-221, Whisperwood Addition - 09/08/1983RESOLUTION 146] - se, RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND AVENUES AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Whisperwood Addition - Lots 197 through 221 made arrangements with Kerr Construction Company for the construction of pav- ing improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the above mentioned addition including the following streets: Utica Avenue from its intersection with a line 15 feet north of the north property line of lst Street to its intersection with a line 7 feet north of the north property line of alley north of 1st Street known and designated as New Subdivision Sub -Unit Number 16 of Unit Number 2029. 1st Street from its intersection with the west lip line of Utica Avenue to and including Cul-de-sac west of Utica Ave., known and designated as New Subdivision Sub -Unit Number 17 of Unit Number 2029. 2nd Street from its intersection with the west lip line of Utica Avenue to its intersection with a line 25.94 feet southwest of northeast corner of Lot 203 known and designated as New Subdivision Sub -Unit Number 18 of Unit Number 2029. 2nd Drive from its intersection with the west lip line of Utica Avenue to its intersection with a line 25.94 feet southwest of northeast corner of Lot 203 known and design- ated as New Subdivision Sub -Unit Number 19 of Unit Number 2029. AND WHEREAS, the construction of the above improvements on the above- mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accor- dance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned streets be and the same are hereby accepted and the City Engineer be and he is here- by authorized to notify the owner of said acceptance and amount of payment due the contractor. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 8TH DAY OF SEPTEMBER 1983. Alan"Henry, Mdyor ATTEST: E elyn Gaf a,. C ty Se Q'14�lv APPROVED AS TO CONTENT: Don Jen ngs, CiA Engineer APPROVED AS TO FORM: , 4 z- --l-2,,, -, . 49,1�n Ross, Jr., City Attorney RESOLUTION 1467 9%8/83 CONSOLIDATED FINAL ESTIMATE WHISPERWOOD ADDITION LOTS 197 thru 221 Accepted September 8, 1983 QUANTITIES S.Y. S.Y. Alley S.Y. L.F. C & G Unit & Location Paving L.F. Ret. & Drg. Valley Remv. & Pv1 Sub -Unit 6" Base C & G Slabs Gutter Repair 2029-16 Utica Avenue from 15` N of NPL of 1st Street to 7' N of NPL of alley N of 1st Street. 1195.06 583.43 20.20 2029-17 1st Street from WLL of Utica Avenue to and in- cluding Cul-de-sac W. of Utica Avenue. 1049.29 536.36 52.54 2029-18 2nd Street from WLL of Utica Avenue to 25.94 ft. SW of NE corner of Lot 203 1351.79 1018.10 71.59 2029-19 2nd Drive from WLL of Utica Avenue to 25.94 ft. SW of NE corner of Lot 203. 1629.47 918.98 20.20 86.00 TOTAL QUANTITIES 5225.61 3056.97 111.99 52.54 86.00 COST ESTIMATE 5,225.61 S.Y. Paving 6" Base @$ 6.45 $33,705.18 3,056.97 L.F. Curb & Gutter @$ 5.85 $17,883.27 111.99 S.Y. Alley Return & Dr. Slabs @$21.90 $ 2,452.58 52.54 S.Y. Valley Gutter @$23.50 $ 1,234.69 86.00 L.F. C & G removal & Pavement repair @$ 4.50 $ 387.00 CONTRACT COST $55,662.72 fb COST DISTRIBUTION Unit & Property Sub -Unit Contract 'Cost Owner Cost 2029-16 $11,564.16 $11,564.16 2029-17 $11,140.32 $11,140.32 2029-18 $16,242.75 $16,242.75 2029-19 $16,715.49 $16,715.49 TOTAL $55,662.72 $55,662.72