HomeMy WebLinkAboutResolution - 1444 - Contract Extension - MPO - FY 1984 Unified Work Program - 08/11/1983JWF:js
RESOLUTION 1444 - 8/11/83
RESOLUTION
WHEREAS, the City Council of the City of Lubbock finds it to
be to the public interest to extend the agreement between the
City of Lubbock and the Steering Committee of the Lubbock Urban
Transportation Study (Metropolitan Planning Organization); NOW
THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized
and directed to execute for and on behalf of said City an
extension of a contract dated October 23, 1975 to a period
covering from September 1, 1983 through August 31, 1984, said
extension to be entered into by and between said City and the
Steering Committee of the Lubbock Urban Transportation Study
(Metropolitan Planning Organization), attached herewith which
shall be spread upon the minutes of the Council and as spread
upon the minutes of this Council shall constitute and be a part
of this Resolution as if fully copied herein in detail.
Passed by the City Council this 11th day of August
1983.
CK BROWN, MAYOR PRO TEMPORE
ATTEST:
yn tial-tga; city -beur"ary-treasurer
APPROVED AS TO CONTENT:
0111 Mcuanlel, irarrlc Lnglneering
APPROVED AS TO FORM:
0, 4;A
�u�Ul'/Y'�•
u ingim, ssis nt CitT Attorney
STATE OF TEXAS
RESOLUTION 1444 - 8/11/83
C.7 Y
RE iARY-TREAS'JR��'
This Contract, entered into this 11th day of August ,
1983, by and between the Steering C mnfttee of the Lubbock Urban Transportation
Study (Metropolitan Planning Organization), hereinafter referred as the "MPO"
and the City of Lubbock, Texas, hereinafter referred to as the "City".
WITNESSETH
WHEREAS, on October 23, 1975, the MPO entered into a contract with the
City of Lubbock, Texas;
NOW THEREFORE, it is hereby agreed that the aforementioned contract of
October 23, 1975, shall, subject to the condition hereinafter stated, be
extended to cover the period from September 1, 1983, through August 31, 1984.
Work will be performed as set forth in the Unified Work Program FY 1984
(September 1, 1983 - August 31, 1984).
Condition:
Exhibit "B" attached hereto shall replace Exhibit "B" as attached to the
aforementioned contract of October 23, 1975.
IN TES InW WHEREOF, the parties hereto have caused these presents to
be executed on the aforementioned date.
PARTY OF THE FIRST
Steering Cmir ittee
Lubbock Urban Transportation Study
/4BillDaniel, C hainnan
wgw- wom
i
wAs WA ru # �-
`
�
Y
r
� �
IN TES InW WHEREOF, the parties hereto have caused these presents to
be executed on the aforementioned date.
PARTY OF THE FIRST
Steering Cmir ittee
Lubbock Urban Transportation Study
/4BillDaniel, C hainnan
wgw- wom
i
wAs WA ru # �-
City of Lubbock
O
E. Jack Brown, Acting Mayor
f -11W wV�W
Evelyn Gafftja
City Secretary - Treasur
APPROVED AS TO FORM
•
•
I
t's•
•
202.14
�
. s
EXHIBIT B
Summary of Section 112 funding to be received by city of Lubbock for
performing listed tasks during FY 1984 (October 1, 1983 - September 30,
1984)
Task No.
Task Description
112 Funds
202.14
IH 27 Corridor Land Use Study
$
23,350
601.14
Review of Field Maintenance operations
$
6,000
601.24
Review of Traffic Signal Installation Procedures
$
4,000
701.24
Land Use Plan Update
$
28,700
$ 62,050
Chairman
Alton Brarell
County Commissioner
Alan Henry
City Councilman
Honorable bent Hance
Member of Congress
Honorable John T. Montford
State Senator
Honorable Nolan J. Robnett
State Representative
Honorable Froy Salinas
State Representative
�rraai. .i• ..i.,irsra
Chairman Bill McDaniel
Asst. Director of
Transportation and Traffic
City of Lubbock
Vice -Chairman
Coy Biggs
County Commissioner
Franklin Dunn
County Commissioner
James Bertram
Director of Planning
City of Lubbock
Jack Housworth
RepresenteGoodwind by
N. M.
Supervising Planning
Engineer
State Dept. of Highways
and Publsc Transportation
Ben Allay
District Engineer
State Dept. of Highways
and Public Transportation
H. M. Goodwyn
Tema Aeronautics
Commission
' Karen A. Kk
South Plains Association
of Governments
Robert A. Gorman
Federal Highway
Administration
' John Warner
Texas Air Control Board
• Ex Officio Member
Jack N. Moore
Senior Planning Engineer
Stets Dept of Highways
and Pub c TrenspoI on
LUBBOCK URBAN
P. 0. Box 771
Mr. harry Cunningham
City Manager
City of Lubbock
P. O. Box 2000
Lubbock, Texas 79457
ATIENTICH: Mr. Jim Bertram
Dear Sir:
TRANSPORTATION
STUDY
Lubbock, Texas 79408
July 29, 1983
806 745 - 4411
Enclosed are four copies of a contract between the Steering Cmmittee
of the Lubbock Urban Transportation Study (Metropolitan Planning
Organization) and the City of Lubbock. [This contract extends the
original contract of October 23, 1975 for another year, September 1,
1983 through August 31, 1984.
Exhibit "B" attached to this contract shall replace Exhibit "B" as
attached to the original contract of October 23, 1975.
Please acquire the required signatures in the appropriate manner and
return to this office.
if we can be of help, please call on us.
Yours truly,
Bill McDaniel
Chairman
Steering Cormnittee
Jack N. Moore
Secretary
Steering Committee
JN K/la
Enclosure