Loading...
HomeMy WebLinkAboutResolution - 1431 - Agreement - Saunders Inc - Underground Conduit, Etc. - 07/14/1983RESOLUTION RESOLUTION 1431 - 7/14/83 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an agreement to be executed by and between said City and Saunders Construction, Inc. (as contrac- tor) for construction consisting of installation of underground conduit, pull boxes, valve boxes and pull wire as per specifications and drawings, attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Reso- lution as if fully copied herein in detail. Passed by the City Council this 14th day of July , 1983. <=�C' >6uu-o� E. JACK BRKWN, MAYOR PRO TEMPORE ATTEST: Evelyn Ga iga, City ee e y -Treasurer APP&OVEb AS TO CONTENT: G. Cook, TraMc/,Engineer f6 -Signal tems and Operations APPROVED AS TO FORM: t t J. Wort-14Fullingim, Assistant City A �. RESOLUTION 1431 - 7/14/83 Bid 7437 CONTRACT C' STATE OF TEXAS COUNTY OF LUBBOCK THIS AGREEMENT, made and entered into this 14 day of July , A.D. 1983, by and between the City of Lubbock, County of Lubbock, State of Texas, acting by and through E. Jack Brown, Mavor Pro Tem , thereunto authorized to*do so, hereinafter referred to as OWNER, and Saunders Construction Inc. of the City of Lubbock , County of Lubbock , and State of Texas , hereinafter termed'CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the CON- TRACTOR hereby agrees with OWNER to commence and complete the construction of certain -improvements described as.follows: Installation of underground conduit, pull boxes, valve boxes,and pull wire as tx--r specifications and drawings. and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to complete the said— construction in accordance with the contract documents as defined in the, General Condition of Agreement. The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been given to him and to substantially complete the same within' 60 days. For and in consideration of the aforementioned, Owner hereby agrees to pay to the Contractor the sum of $ 18,606.25 ..The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with the proposal submitted therefor, subject to additions and. deductions, as provided in the contract documents and -to make payment on account thereof as provided therein. L IN WITNESS .WHEREOF, the parties to these presents have executed this contract in six (6) counterparts, each of which shall be deemed an original,. in the year and day first above mentioned. CITY OF.LUBBOCK, TEXAS Mayor Pro E. Jack Brom ATTEST: City Sec etar -Treas r APPROVED AS TO CONTENT: J' Be ram, Director of Planning APPROVED AS TO FORM: EE Z92ZEEZ Asst. City torney J rth Fullingim, Ij ATTEST: ------------ CONTRACTOR Saunders Construction Inc. BY: Sh iby Saunders!, TITLE: PRESIDENT CO11PLETE ADDRESS: Box 463 Shallowater, Texas 79363