HomeMy WebLinkAboutResolution - 1549 - Accept Paving Improvements - Kerr Co - Lot 7, Summer Place Addition - 01/12/1984!� RESOLUTION 1549 1/12/84
1
,P RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF AN ALLEY AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City Or-
dinance 1331, the .subdivider of Summer Place Addition Lot 467 made arrangements
with Kerr Construction Company for the construction of paving improvements on
a certain alley dedicated in said subdivision under the provisions of said
Ordinance prior to the recording of the subdivision plat of Summer Place Addi-
tion Lot 467 including the following alley return:
An alley return located on Loop 289 access Road; South of 32nd Street.
AND WHEREAS, the construction of the above improvements on the above-
mentioned alley was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with
the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned alley be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to notify the Developer of acceptance by the Lubbock City Council.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 12th DAY OF January 19 84.
Ala Henry, Payor
ATTEST
Evelyn Gaf ga, City e et
APPROVED AS TO CONTENT:
Don Jennings/City Engineer
APPROVED AS TO FORM:
lum < <'P '_� ,
n Ross, Jr'., City Attorney
CONSOLIDATED FINAL ESTIMATE
SUMMER PLACE ADDITION LOT X67
Accepted 1/12/84
QUANTITIES
S.Y.
L.F.C. & G.
Unit &
L.F.
Alley
Removal &
Sub -Unit
Location
C & G
Return
Repair
NS 2029-46
Alley return located on East
41.42
25.76
34.00
Side of West Loop 289; South
of 32nd Street
COST DISTRIBUTION
Unit &
Contract
Property
Sub -Unit
Cost
Owner
Cost
NS 2029-46
$1,075.84
$1,075.84
COST ESTIMATE
41.42
L.F. Curb & Gutter
@$ 6.90
$285.80
25.76
S.Y. Alley Return
@$24.40
$628.54
34.00
L.F. C & G Removal &
Repair
@$ 4.75
$161.50
CONTRACT COST
$1,075.84