Loading...
HomeMy WebLinkAboutResolution - 1639 - Accept Paving Improvements - Kerr - Lots 55A1-57B1 Whisperwood Addition - 04/12/1984RESOLUTION 1639 - 4/12/84 RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Whisperwood Addition, Lots 55-A-1 thru 57-B-1 made arrangements with Kerr Construction Company for the construction of paving improvements on a street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the above mentioned addition including the following street construction: Removal of alley return on Slide Road between Lots 56-A-1 and 55-B-1, Whisperwood Addition, Unit number 2029-91. AND WHEREAS, the construction of the above improvements on the above mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY. THE CITY OF LUBBOCK, TEXAS I. That the improvements on said portions of the above mentioned street be and the same are hereby accepted and the City Engineer be and he is hereby authorized to notify developer of acceptance by City Coundil and amount of construction cost. II. This resolution.shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 12th DAY OF P. ATTEST: Evelyn Gaf ga, City S r APPROVED AS TO CONTENT: AOyt0' Don J Ings, ity Engineer APPROVED AS TO FORM: "Zx" e- -12,-, 9dhn Ross, Jr., City Atto ey CONSOLIDATED FINAL ESTIMATE WHISPERWOOD ADDITION Lots 55-A-1 thru 57-B-1 Accepted April 12, 1984 QUANTITIES S. Y. L.F. lJnitc-& L. F. Alley C & G removal Sub -Unit Location C & G Return and paving 2029-91 Removal of alley return on Slide Rd. 43.2 21.64 43.2 COST ESTIMATE 43.2 L. F. Curb & Gutter @ $8.00 $345.60 21.64 S.Y. Alley Slab removal @ $6.00 $129.84 43.2 L. F. C & G removal and Paving Repair @ $9.50 $410.40 CONTRACT COST $885.84 COST DISTRIBUTION Unit & Sub Unit Construction Cost Developer Cost 2029-91 $885.84 $885.84