RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS
LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions
of City Ordinance 1331, the subdivider of Camelot Addition, Lots 3, 4,
& 5 made arrangements with Kerr Construction Company for the construction
of paving improvements on a street dedicated in said subdivision
under the provisions of said Ordinance prior to the recording of the
subdivision plat of the above mentioned addition including the following
street:
34th Street from west property line of Lot 3 to 265.81 feet
east of Lot 3, Unit number 2030-75
AND WHEREAS, the construction of the above improvements on the
above mentioned street was performed under the supervision of the City
Engineer, and said improvements have been completed and have been
inspected and found to have been constructed in accordance with City
specifications and in accordance with the provisions of City Ordinance
1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I
That the improvements.on said portions of the above mentioned
street be and the same are hereby accepted and the City Engineer be
and he is hereby authorized to notify the developer of acceptance by
the City Council and amount of construction cost.
II.
This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THTS 12th DAY nP APRTT. 1QRG
ATTEST:
E elyn Gaff 6d, Cit4Secre4
RESOLUTION
(PAGE 2)
APPROVED AS TO CONTENT:
Don ifnings, ity Engineer
APPROVED AS TO FORM:
L�
joKn Ross, Jr., City Attorn y
.. ,
CONSOLIDATED FINAL ESTIMATE
CAMELOT ADDITION
LOTS 3, 4 & 5
ACCEPTED April 12, 1984
QUANTITIES
Unit & L. F.
Sub -Unit Location C & G
2030-75 34th St. from WPL of
Lot 3 to 265.81' E of
Lot 3, Camelot Addition
C & G only. x284.50
COST ESTIMATE
3284.50 L.F. Curb & Gutter
CONTRACT COST
@6.15 $1,749.67
$1,749.67
COST DISTRIBUTION
Unit &
Sub -Unit CONSTRUCTION COST DEVELOPER COST
2030-75 $1,749.67 $1,749.67