RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR
AVENUES AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1331, the subdivider of Woodland Park Addition, Tracts
"B" thru "F", and Lots 270 thru 290 made artangements with W.D. Turner
Construction Company for theconstruction of paving improvements on
certain streets dedicated in said subdivision under the provisions of
said ordinance prior to the recording of the subdivision plat of the
above mentioned addition including the following streets:
80th Street from its intersection with the east lip line of
Slide Road to its intersection with the south end of radius
of York Avenue known and designated as New Subdivision Sub -Unit
Number 08 of Unit Number 2030.
79th Drive from its intersection with the north end of cul-de-sac
to its intersection with a line 7.00 feet west of west property
line of alley west of Zoar Avenue known and designated as New
Subdivision Sub -Unit Number 09 of Unit Number 2030.
AND WHEREAS, the construction of the above improvements on the
above mentioned streets was performed under the supervision of the City
Engineer, and said improvements have been completed and have been in-
spected and found to have been constructed in accordance with City spec-
ifications and in accordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements_ on said portions of the above mentioned
streets be and the same are hereby accepted and the City Engineer be
and is hereby authorized -to notify Developer of acceptance by City
Council and amount of construction cost.
II.
This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 12th DAY OF APRIL, 198'.
AT EST:
Evelyn Gaf ga, City ec y
APPROVED S TO CONTENT:
O�
Don J nings, ity Engineer
APPROVED AS TO FORM:
hn Ross Jr., City At
Alan Henry, Mayo
V- •
CONSOLIDATED FINAL ESTIMATE
Woodland Park Addition
Tracts B & F, and Lots 270 thru 290
Accepted April 12, 1984
QUANTITIES
$52,189.96
-
$19,071.38
Total
Unit &
S.Y.
S. Y.
S.Y.
L. F.
Sub -Unit
Paving L. F.
Alley
Valley
C & G
Location
6" Base C & G
Return
Gutter
Removal &
Pavement Rei
2030-08 80th St. from ELL of
Slide Rd. to S. end of
radius at York Ave.
3795.36 1854.68
498.92
64.32
92.00
2030-09 79th St. from N end of
Cul-de-sac to 7' W of
WPL of Alley W of Zoar
Ave. 1851.53 900.25 24.54
Total 5,646.89 2,754.93 523.46 64.32 92.00
COST ESTIMATE
5,646.89 S.Y. Paving 6" Base
2,754.93 L.F. Curb & Gutter
523.46 S.Y. Alley Return &
Drng.Channels
64.32 S.Y. Valley Gutter
92 L.F. C & G removal
and Pavement Repair
CONTRACT COST
COST DISTRIBUTION
Unit & Sub -Unit
@ $6.95 $39,245.88
@ $6.25 $173,218.31
@ $23.50 $12,301.31
@ $24.50 $ 1,575.84
@ $10.00 $ 920.00
$71,261.34
Construction Developer
Cost Cost
2030-08
$52,189.96
2030-09
$19,071.38
Total
$71,261.34
$52,189.96
$19,071.38
$71,261.34