HomeMy WebLinkAboutResolution - 1760 - CO#1 To Contract - Marecon Inc - Apron Expansion Project, LIA - 07/26/1984s.. Resolution #1766 Agenda Item #31 07/26/84 1 MG:js RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 1 on Airport Apron Expansion Project between the City of Lubbock and Marecon, Inc., attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 26th day of July , 1984. ATTEST: I I Cit ecretary APPROVED AS TO CONTENT: ."V . Marvin Coffee, ector—of actor-ofAviation APPROVED AS TO FORM: Mich G isar, ssis an City Attorney ALANWENRY, MAYOOC CHANGE ORDER NO. 1 Lubbock International Airport Terminal Apron Expansion AIP Project Nos. 3-48-0138-01&02 ADAP Project No. 6-48-0138-16 June, 1983 To: Marecon, Inc. P. 0. Box 771029 Houston, Texas 77215 General description of work included in contract: The construction of approximately 43,000 square yards of rigid pave- ment on the terminal apron, removal of existing pavement, construction of drainage structures, excavation work, taxiway edge lighting, utilities and other related items of work. Original Amount of Contract. . . . . . . $2,366,215.80 Change Order No. 1 . . . . . . . . . . . (Add) 6,168.70 Adjusted Contract Price . . . . . . . . . $2,372,384.50 Original Construction Time . . . . . .300 Calendar Days Change Order No. 1 . . . . . . . . . . (Add) 19 Calendar Days Adjusted Construction Time . . . . . . . . 319 Calendar Days WHEREAS, it is desirable to make certain changes in the work included under this project: AND WHEREAS, during the construction time provided by the contract for the project, work was delayed due to weather conditions, such as snow and subfreezing temperatures, during critical periods of construction, the Owner and Contractor agree that the time allowed for the completion of the project shall be extended 19 calendar days, from 300 calendar days to 319 calendar days. AND WHEREAS, during excavation for the south apron expansion, an area of cement -treated base, extending well beyond the limits shown on the pro- ject drawings, had to be removed to allow completion of the excavation, the PROPOSAL shall be modified by the addition of the following: A-49 1 Removal of Existing Cement -Treated L.S. Base, complete, for the lump sum price of: One thousand seven hundred sixty- eight --------------------- Dollars and Seventy Cents ($1,768.70) CHANGE ORDER NO. 1 Page 1 of 2 $ 1,768.70 AND 'WHEREAS, during construction of electrical improvements, it was agreed that manholes would be more advantageous than the pull boxes spe- cified, due to increased depth and increase in number and size of ducts, Item A-40 of the Proposal is hereby deleted and the Proposal shall be modified by the addition of the following: A-50 2 Precast Concrete Manholes, complete Each in place: ----- ---------------�� Three thousand two hundred Dollars and No Cents ($3,200.00) $ 6,400.00 The- deletion of Item A-40 ($2,000.00) and the addition of Item A-50 ($6,400.00) shall result in a net addition of $4,400.00 to the contract price. THIS AGREEMENT WITNESSETH: In consideration of the mutual advantage gained, the Owner and the Contractor agree to the changes indicated above and further agree that the amount of the contract shall be adjusted by the amount shown above. The aforementioned changes, and work affected thereby, are subject to all contract stipulations and covenants. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this day of , 1984. -------------------------------------------------------- RECOMMENDED: PARKHILL, SMITH & COOPER, INC.,. Consulting Engineers Project �a By , Engineer ,-1 U 1984 APPROVED: MECO , INC., Contractor Bvt��� ✓ 1��� .-_' ' 1984 APPROVED: ATTEST: ..Tiny ^T1 T ttnonnv gMYA Q nwn r APPROVED AS TO CONTENT: Maf in Coffee Director of Av ation CHANGE ORDER NO. 1 Page 2 of 2 1984