HomeMy WebLinkAboutResolution - 1754 - CO#20 To Contract - Page & Wirtz Construction - Renovation, Municipal Building - 07/12/1984RESOLUTION 17,94 - 7/12/84
JCR:cl
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Change Order
Number 20 between the City of Lubbock and Page and Wirtz Construction
Company, attached herewith, which shall be spread upon the minutes of the
Council and as spread upon the minutes of this Council shall constitute and
be a part of this Resolution as if fully copied herein in detail.
Passed by the City Council this 12th day of July 91984.
ALPK IIENRY, KATOR
ATTEST:
0`t auutav�n� /J ..�Ga.c2, o�
y ity Secretary
APPROVED AS TO CONTENT:
Rita Harmon, Assistant City Manager
APPROVED AS TO FORM:
ohn C. Ross, Jr., City Atto ney,
CHANGE ORDER NUMBER ('20) TWENTY RESOLUTION 1754
PROJECT: A NEW MUNICIPAL BUILDING
FOR THE CITY OF LUBBOCK
LUBBOCK, TEXAS
ARCHITECT: BILL COX, ARCHITECT
1710 - 15TH STREET
LUBBOCK, TEXAS 79401
CONTRACTOR: PAGE AND WIRTZ CONSTRUCTION COMPANY
4405 CLOVIS ROAD
P.O. BOX 10402
LUBBOCK, TEXAS 79401
DATE ISSUED: JUNE 28, 1984
I I 1
OWNER
[l CONTACTOR
[l ARCHITECT
The General Contractor is directed to make the following change(s) to the
above project, upon acceptance by all parties.
Furnish and install new chilled water coils and repair the existing air
ducts.
$ 35,357.00
Associated activities removal and replacement of walls.
Overhead Profit at 15%
$ 985.00)
$ 5,451.00
Amount of the Contingency/Contract will be increased/decreased by the sum of:
Forty -One Thousand Seven -Hundred Ninety -Three dollars and No/100(41,793 00)
with a change of 30 day in the Contract time.
Bill Cox Page and Wirtz City of Lubbock
Archit t Construction Company Owner
B By
--. /
By4AC
Date 2�,,�j,�,�� Date Date 7/12/84
APPROVED AS TO CONTENT:
Director of Administrative Services
I
RESOLUTION 1754
Page 1 of 2 Pages
4 ,
O. W. GHISUM & CO.
MECHANICAL CONTRACTORS
P. O. BOX 2053 . PHONE 606/765.9314
LUBBOCK. TEXAS 78408 I
I
June 26, 1984 i
Page and Wirtz! Construction Co.
P.O. Box 10402
Lubbock, Texas 79408 j
RE: Lubbock Municipal Building
Gentlemen:
We submit our price to furnish and install new chilled water coils
five existing airrs for the suai of _ and repair the ;
- S 35,357.00—_–
This bid includes the following. i
AIR UNIT N0.1
Testing—a—ting coils. j
Four new chilled water coils ;(
One new condensate drain
New sheet metal housing lined with insulation from filter bank to coi
New stainless steel drain pan. s, i
New end panels at coils .
New eliminator blades. !
AIR UNIT NO. 2
New stainless steel drain pan.
New end panels at coils.
New eliminator blades.
New condensate drain.
Testing and repairing existing coils.
Patch existing housing panels.
AIR UNIT NO. 3
Testing Existing coils.
Two new chilled water coils.
New end panels at coils.
Rework structural members for new coils..'
AIR UNIT NO.4 I
One new chilled water coil.
New end i
panels at coils.
Testing existing coils. f
AIR UNIT NO. 5
One new chilled•water coil.
New end panels at coil.
New condensate drain.
Testing existing coils.
PENTHOUSE; t
One new floor drain for chilled water
One new floor drain for air unit No.2 condensate.
In order to complete project on schedule,we are in urgent need
the above change. of a prompt decision for
I(Continued on next page )
No Text
EASEMENT ON STATE LAND
MISCELLANEOUS EASEMENT NO. 84-151
STATE OF TEXAS
COUNTY OF LUBBOCK
R -
(1) By virtue of the authority granted in Senate Bill.No. 354, Chapter
325, Acts of the 52nd Legislature, 1951, as amended by Senate Bill No. 321,
Chapter 239, Acts of the 54th Legislature, 1955, (codified as Natural
Resources Code § 35.051) the State of Texas, Grantor herein, acting by and
through its Board for Lease of the Texas Parks -and Wildlife Department, hereby
grants to the CITY OF LUBBOCK, P. 0. Box 2000, Lubbock, Texas 79457,
hereinafter called Grantee, its successors or assigns, an easement and right-
of-way for the following purpose: constucting, laying, inspecting,
operating, repairing, replacing, reconstructing, and maintaining a a 24" O.D.
wastewater pipeline together with all connections thereto on and across the
following described land, owned by the State of. Texas,. in Lubbock County,
Texas, to -wit:
See Exhibit A attached hereto and made a part hereof for centerline
description. The right-of-way shall be 407.45 rods in length with a
construction easement width of 50 feet and a permanent easement
width of 20 feet.
(2) As consideration for the granting of this easement, Grantee hereby
agrees to make all necessary wastewater connections to the park facilities
needed to adequately serve visitors to the park and agrees to provide
wastewater service to the park at no charge in the event that operation and
management of the park reverts to the Parks and Wildlife Department and as
long as it is used as a state park. Additionally, the mitigation measures in
Exhibit B hereby incorporated in this easement contract for all purposes.
(3) The term of the easement is to be 25 years with an option to renew
for. an additional 7 years to coincide with expiration of the easement on
December 31, 2015.
(4) It is agreed that when said line is placed on said land, the
location of the right-of-way shall become fixed at said location of said line,
and the course and location of said right-of-way shall not be changed, except
by agreement with the proper official of the State of Texas as authorized by
law.
(5) The Grantee is hereby granted the right of ingress and egress to
and from said right-of-way for the purpose of constructing, erecting,
maintaining, repairing, replacing and rebuilding said line; and such right is
not granted for any other purpose. The Grantee agrees to occupy the land only
to the extent and for the length of time necessary when constructing,
erecting, maintaining, repairing, replacing and rebuilding said line.
,(6) The Grantee shall have tbe.right to remove any of its own property
from said right-of-way, provided all payments under this agreement due at the
time of such removal are paid up in full. If the Grantee removes any pipes,
poles, or other equipment or structures, it will fix and level the land from
where the same are taken so that said land will be as nearly as possible in
the same condition it was before the Grantee entered thereon.
(7) Grantee shall make all reasonable efforts to construct and maintain
this pipeline in such a manner as will lessen the risk to the property and
Grantee further agrees to make every reasonable effort to prevent pollution,
and if such pollution occurs, will commence clean-up operations as soon as
possible after such pollution occurs.
(8) It is the duty of the Commissioner of the Texas General Land Office
to carry out and enforce the terms of this agreement on behalf of the State.
In the event suit is necessary on behalf of the State, the Attorney General
shall bring the same.
(9) All of Grantee's property removed from the right-of-way under
Paragraph six (6) is subject to a lien in favor of the State of'Texas for all
payments due at the time of removal.
(10) Grantee shall indemnify and hold harmless Grantor against any
liability for damages to any person or property arising from Grantee's
occupation and use of the right-of-way.
Entered into this day of , 1984.
THE STATE OF TEXAS
BY
GARRY MAURO
Commissioner of the Texas General
Land Office and Chairman of the
Board for Lease of Texas Parks and
Wildlife Department, pursuant to a
resolution duly adopted by said
Board on June 14, 1984
CITY OF LUBBOCK
BY
GRANTEE
THE STATE OF TEXAS
COUNTY OF TRAVIS 9
This instrument was acknowledged before me on , 1984
by GARRY MAURO, Chairman of the Board for Lease of the Texas Parks and
Wildlife Department of the State of Texas.
s
STATE OF TEXAS
COUNTY OF
This instrument was acknowledged before me on , 1984
by
of the CITY OF LUBBOCK.
(PRINT .NAME)
MY COMMISSION EXPIRES