Loading...
HomeMy WebLinkAboutResolution - 1754 - CO#20 To Contract - Page & Wirtz Construction - Renovation, Municipal Building - 07/12/1984RESOLUTION 17,94 - 7/12/84 JCR:cl RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order Number 20 between the City of Lubbock and Page and Wirtz Construction Company, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 12th day of July 91984. ALPK IIENRY, KATOR ATTEST: 0`t auutav�n� /J ..�Ga.c2, o� y ity Secretary APPROVED AS TO CONTENT: Rita Harmon, Assistant City Manager APPROVED AS TO FORM: ohn C. Ross, Jr., City Atto ney, CHANGE ORDER NUMBER ('20) TWENTY RESOLUTION 1754 PROJECT: A NEW MUNICIPAL BUILDING FOR THE CITY OF LUBBOCK LUBBOCK, TEXAS ARCHITECT: BILL COX, ARCHITECT 1710 - 15TH STREET LUBBOCK, TEXAS 79401 CONTRACTOR: PAGE AND WIRTZ CONSTRUCTION COMPANY 4405 CLOVIS ROAD P.O. BOX 10402 LUBBOCK, TEXAS 79401 DATE ISSUED: JUNE 28, 1984 I I 1 OWNER [l CONTACTOR [l ARCHITECT The General Contractor is directed to make the following change(s) to the above project, upon acceptance by all parties. Furnish and install new chilled water coils and repair the existing air ducts. $ 35,357.00 Associated activities removal and replacement of walls. Overhead Profit at 15% $ 985.00) $ 5,451.00 Amount of the Contingency/Contract will be increased/decreased by the sum of: Forty -One Thousand Seven -Hundred Ninety -Three dollars and No/100(41,793 00) with a change of 30 day in the Contract time. Bill Cox Page and Wirtz City of Lubbock Archit t Construction Company Owner B By --. / By4AC Date 2�,,�j,�,�� Date Date 7/12/84 APPROVED AS TO CONTENT: Director of Administrative Services I RESOLUTION 1754 Page 1 of 2 Pages 4 , O. W. GHISUM & CO. MECHANICAL CONTRACTORS P. O. BOX 2053 . PHONE 606/765.9314 LUBBOCK. TEXAS 78408 I I June 26, 1984 i Page and Wirtz! Construction Co. P.O. Box 10402 Lubbock, Texas 79408 j RE: Lubbock Municipal Building Gentlemen: We submit our price to furnish and install new chilled water coils five existing airrs for the suai of _ and repair the ; - S 35,357.00—_– This bid includes the following. i AIR UNIT N0.1 Testing—a—ting coils. j Four new chilled water coils ;( One new condensate drain New sheet metal housing lined with insulation from filter bank to coi New stainless steel drain pan. s, i New end panels at coils . New eliminator blades. ! AIR UNIT NO. 2 New stainless steel drain pan. New end panels at coils. New eliminator blades. New condensate drain. Testing and repairing existing coils. Patch existing housing panels. AIR UNIT NO. 3 Testing Existing coils. Two new chilled water coils. New end panels at coils. Rework structural members for new coils..' AIR UNIT NO.4 I One new chilled water coil. New end i panels at coils. Testing existing coils. f AIR UNIT NO. 5 One new chilled•water coil. New end panels at coil. New condensate drain. Testing existing coils. PENTHOUSE; t One new floor drain for chilled water One new floor drain for air unit No.2 condensate. In order to complete project on schedule,we are in urgent need the above change. of a prompt decision for I(Continued on next page ) No Text EASEMENT ON STATE LAND MISCELLANEOUS EASEMENT NO. 84-151 STATE OF TEXAS COUNTY OF LUBBOCK R - (1) By virtue of the authority granted in Senate Bill.No. 354, Chapter 325, Acts of the 52nd Legislature, 1951, as amended by Senate Bill No. 321, Chapter 239, Acts of the 54th Legislature, 1955, (codified as Natural Resources Code § 35.051) the State of Texas, Grantor herein, acting by and through its Board for Lease of the Texas Parks -and Wildlife Department, hereby grants to the CITY OF LUBBOCK, P. 0. Box 2000, Lubbock, Texas 79457, hereinafter called Grantee, its successors or assigns, an easement and right- of-way for the following purpose: constucting, laying, inspecting, operating, repairing, replacing, reconstructing, and maintaining a a 24" O.D. wastewater pipeline together with all connections thereto on and across the following described land, owned by the State of. Texas,. in Lubbock County, Texas, to -wit: See Exhibit A attached hereto and made a part hereof for centerline description. The right-of-way shall be 407.45 rods in length with a construction easement width of 50 feet and a permanent easement width of 20 feet. (2) As consideration for the granting of this easement, Grantee hereby agrees to make all necessary wastewater connections to the park facilities needed to adequately serve visitors to the park and agrees to provide wastewater service to the park at no charge in the event that operation and management of the park reverts to the Parks and Wildlife Department and as long as it is used as a state park. Additionally, the mitigation measures in Exhibit B hereby incorporated in this easement contract for all purposes. (3) The term of the easement is to be 25 years with an option to renew for. an additional 7 years to coincide with expiration of the easement on December 31, 2015. (4) It is agreed that when said line is placed on said land, the location of the right-of-way shall become fixed at said location of said line, and the course and location of said right-of-way shall not be changed, except by agreement with the proper official of the State of Texas as authorized by law. (5) The Grantee is hereby granted the right of ingress and egress to and from said right-of-way for the purpose of constructing, erecting, maintaining, repairing, replacing and rebuilding said line; and such right is not granted for any other purpose. The Grantee agrees to occupy the land only to the extent and for the length of time necessary when constructing, erecting, maintaining, repairing, replacing and rebuilding said line. ,(6) The Grantee shall have tbe.right to remove any of its own property from said right-of-way, provided all payments under this agreement due at the time of such removal are paid up in full. If the Grantee removes any pipes, poles, or other equipment or structures, it will fix and level the land from where the same are taken so that said land will be as nearly as possible in the same condition it was before the Grantee entered thereon. (7) Grantee shall make all reasonable efforts to construct and maintain this pipeline in such a manner as will lessen the risk to the property and Grantee further agrees to make every reasonable effort to prevent pollution, and if such pollution occurs, will commence clean-up operations as soon as possible after such pollution occurs. (8) It is the duty of the Commissioner of the Texas General Land Office to carry out and enforce the terms of this agreement on behalf of the State. In the event suit is necessary on behalf of the State, the Attorney General shall bring the same. (9) All of Grantee's property removed from the right-of-way under Paragraph six (6) is subject to a lien in favor of the State of'Texas for all payments due at the time of removal. (10) Grantee shall indemnify and hold harmless Grantor against any liability for damages to any person or property arising from Grantee's occupation and use of the right-of-way. Entered into this day of , 1984. THE STATE OF TEXAS BY GARRY MAURO Commissioner of the Texas General Land Office and Chairman of the Board for Lease of Texas Parks and Wildlife Department, pursuant to a resolution duly adopted by said Board on June 14, 1984 CITY OF LUBBOCK BY GRANTEE THE STATE OF TEXAS COUNTY OF TRAVIS 9 This instrument was acknowledged before me on , 1984 by GARRY MAURO, Chairman of the Board for Lease of the Texas Parks and Wildlife Department of the State of Texas. s STATE OF TEXAS COUNTY OF This instrument was acknowledged before me on , 1984 by of the CITY OF LUBBOCK. (PRINT .NAME) MY COMMISSION EXPIRES