Loading...
HomeMy WebLinkAboutResolution - 2021-R0007 - Amendment No. 1 to Contract 15208 with Freese and Nichols, Inc. 1.12.21Resolution No. 2021-R0007 Item No. 7.11 January 12, 2021 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute f and on behalf of the City of Lubbock, Amendment No. 1 to that certain Agreement Contract N 15208 dated June 23, 2020, for services related to Southeast Water Reclamation Plant Efflue. Pump Station #2, by and between the City of Lubbock and Freese and Nichols, Inc., and relatf documents. Said Amendment is attached hereto and incorporated in this resolution as if fully s forth herein and shall be included in the minutes of the City Council. Passed by the City Council on January 12, 2021 DANIEL M. POPE, MAYOR ATTEST: ebe ca Garza, City Secret APPROVED AS TO CON Jesica McEachern, Assistant City Manager APPROVED AS TO FORM: K.11i Leisure, Assistant City Attorney ccdocs./RES.Amend #1 Agrmt 15208 SEWRP #2 12.28.20 Resolution No. 2021-R0007 Amendment 1 To Agreement Between The City of Lubbock, TX And Freese and Nichols, Inc. THIS IS THE FIRST AMENDMENT TO THE AGREEMENT, Contract No. 15208, dated and entered into the 23rd day of June 2020 by and between the City of Lubbock ("City") and Freese and Nichols, Inc. ("Engineer"), a Texas Professional Corporation, for providing engineering services related to the Southeast Water Reclamation Plant Effluent Pump Station #2 Improvements ("Project"). WITNESSETH: WHEREAS, the City desires to increase the scope of the work to be performed by Engineer on the Project for additional engineering design services. The details of work to be performed and associated additional fees are described in Exhibits A, and B, Parts 1-2, attached to and incorporated herein. The additional services shall be provided for an amount not exceed three hundred fifty thousand two hundred ninety- seven dollars and 001,100 ($350,297.00). The term of the Agreement shall be extended an additional 360 calendar days for the performance of the additional services. WHEREAS, all other portions of the original Agreement shall remain in place and are not altered by this amendment. NOW, THEREFORE, the City and Engineer agree to the terms of this FIRST AMENDMENT: IN WITNESS HEREOF, the parties have executed this Agreement as of this 12th day of January 01041 CITY OF L BOCK Daniel M. Pope, Mayor ATTEST: (odg2gg, C Reb ca Garza, City Secreta APPROVED AS TO CONTENT: Michael G. Keenum, P.E., Division Director of Engineering/City Engineer --L =Lj-�' -.,- Josh tinek, P. ., Assistant City Engineer/Capital Projects and Design APPROVED AS TO FORM: r K lli Leisure, Assistant City Attorney FREESE AND NICHOLS, INC. By: Nicholas Lester, P.E., Vice President/Principal EXHIBIT A AMENDMENT No. 1 SCOPE OF SERVICES FOR: SOUTHEAST WATER RECLAMATION PLANT (SEWRP) EFFLUENT PUMP STATION #2 IMPROVEMENTS FINAL DESIGN ENGINEERING SERVICES General: Due to upgrades to the wastewater treatment process and changes in pumping operations at the Effluent Pump Station #2 (The "Project"), the City of Lubbock would like to upgrade the Pump Station to be equipped with new pumps, valves, piping and variable frequency drives to increase the pump station efficiency and reduce energy costs. In addition to adding VFDs, other mechanical, structural, electrical and HVAC improvements identified in the Condition Assessment required to bring the Pump Station up to current codes and meet the pumping capacity requirements will be included in the final design. A. The Project's primary objectives will consist of the following: 1. Final Design (Production of Construction Documents) - Develop construction plans and specifications for the advertisement and procurement of construction services for improvements (Electrical, Mechanical, Structural, Site, and Hydraulic) for the SEWRP Effluent Pump Station No 2 as recommended in the Condition Assessment Memo. The Construction Documents will be structured based on the Competitive Sealed Proposal (CSP) method of Contractor selection. 2. Construction Bid and Award Services. B. The following are not part of the Project: 1. Assessment of or modifications to existing facilities at the SEWRP other than the Effluent Pump Station No.2. 2. General Representation is not included in the scope. 3. Resident Project Representation (RPR) is not included in the scope. FNI Professional Agreement Page 1 of 12 Basic Services: The Basic Services include the project administration, preparation of final design as set forth herein, construction documents, and construction bid and award services. ENGINEER shall render the following professional services in connection with the development of the Project: A. GENERAL SCOPE OF SERVICE TASKS: ENGINEER will provide the following as part of the preliminary and final design phase of The Project: I. Provide administration and management of The Project Final Design. Review ongoing activities. Monitor schedule and budget. Review progress with OWNER on a regular basis. Discuss issues with the OWNER as they are noted. Attend nine (9) monthly coordination meetings with the OWNER. Prepare and distribute minutes of the meetings. Three (3) meetings provided for in this Agreement shall occur at the offices of the OWNER, or other location determined by the OWNER, and six (6) meetings shall be video conference. 2. Assist the OWNER with a public information program, including the preparation of exhibits and associated descriptive material. A total of one meeting in Lubbock are included. 3. Provide monthly update reports which include the following: •Status of the work *Major tasks to be completed in the next month •Discussion of major issues *Scope changes to project scope or Engineer's scope eProject budget update (if major changes since the last update) *Project schedule update (if major changes since the last update) •Status of deliverables B. FINAL DESIGN (PRODUCTION OF CONSTRUCTION DOCUMENTS): FNI shall provide professional services in this phase as follows: 1. Obtain and review OWNER -furnished front-end documents, general conditions, and special conditions for the construction contracts. Meet with OWNER to review comments, and revise OWNER's standard documents accordingly. 2. Prepare plans, specifications, contract documents, designs, and layouts of improvements (Site, Mechanical/Hydraulic, Structural, and Electrical and Instrumentation) to be constructed for the SEWRP Effluent Pump Station No 2 Improvements as recommended in the Condition Assessment Memo. FNI Professional Agreement Page 2 of 12 (1) Recommended improvements from the Condition Assessment Memo to be included in the final design include the following: (a) Sitework • Install new asphalt pavement to the south and east of the existing EPS No.2 for increases accessibility for maintenance, as requested by City staff. • Miscellaneous structural demolition and repair including demolition of the southernmost bridge crane columns and repair to the spalling at the pipe supports and pump base. (b) Mechanical and Hydraulic - Pump Station Piping, Valves, and Equipment • Replace existing EP-4001 and EP-4002 with new 250 HP pumps with 480V motors. • Install new EP-4003 with 400 HP 480V motor. • Replace existing EP-4004 with new 400 HP pump with 480V motor. • Existing EP-4006 pump and motor to remain. • Replace all piping and valves from the five pump discharge flanges to the discharge headers 90-degree bend before it goes below grade (includes air valves, coupling adapters, check valves, butterfly valves, and pipe supports) • Replace existing HVAC equipment with two 25-ton packaged DX units and install new pads for exterior equipment. (c) Structural • Miscellaneous cosmetic concrete repair at pump bases and columns • Demolition of bridge crane guide rails • Design of roof support for HVAC system if needed • Demolition of wall in the electrical building (d) Electrical and Instrumentation Equipment • Replace existing pump starters (Reduced Voltage Autotransformers) for EP-4001, • EP-4002, EP-4003, and EP-4004 with 480V VFDs • Replace existing pump starters (VFDs) for EP-4006 and NP-4001 with new 480V VFDs • Replace existing switchboard with 480V 4000A switchboard • Replace 480-208Y/120V Transformer • Replace Primary Unit Substations • Replace Cable and Conduit • Replace existing SCADA PLC (RTU) cabinet • Install Electric Motor Operators on three existing butterfly valves in the yard piping, as requested by City staff FNI Professional Agreement Page 3 of 12 3. Advise OWNER of need for and recommend scope of additional subsurface investigations, special analysis, and the retention of special consultants. The cost of any additional special services shall be paid by OWNER and are not included in the services performed by ENGINEER unless they are included pursuant to Exhibit A —Special Services. 4. Prepare Project applications for permits including but not limited to building code permitting (if any). ENGINEER will provide supporting documents to the construction contractor(s) for their application of NPDES/TPDES Permitting. Any permitting effort required because of new regulations that become effective after the signing of this contract will be considered additional services. S. Submit plans, specifications, and contract documents for the Project to the TCEQ. 6. Furnish necessary information to utility companies whose facilities may be affected, or services may be required for the Project. Provide site civil design of the pump station site to support the electric utilities site requirements, including site grading, roads, and fencing improvements as necessary. 7. Level 2 (60%) Review: Furnish OWNER six (6) copies of preliminary (60%) plans and specifications marked "Preliminary" for approval by OWNER. ENGINEER will meet with the OWNER to present the preliminary plans and specifications. After OWNER'S review, ENGINEER will meet with OWNER to receive comments. Level 2 review documents will include dimensional layout drawings, plans, sections and elevations of the facilities for all the trades, typical details, and most special details. The drawings will be in sufficient development to show the overall layouts and design intent but will lack many notes and minor details. The specifications will include the front-end documents and draft specifications for major equipment items. 8. Level 3 (90%) Review: Furnish OWNER six (6) copies of preliminary (90%) plans, specifications, and bid proposals marked "Preliminary" for approval by OWNER. ENGINEER will meet with the OWNER to present the preliminary plans and specifications. After OWNER'S review, ENGINEER will meet with OWNER to receive comments. Upon final approval by OWNER, ENGINEER will complete the plans and specifications and provide OWNER ten (10) sets of copies of "Final" plans and specifications. Level 3 Review documents will include all drawing sheets and specifications with some minor corrections and notes remaining. 9. Prepare bidder's proposal forms (project quantities) of the improvements to be constructed for the Project. C. CONSTRUCTION BID & AWARD SERVICES: Upon completion of the design services and approval of "Final" drawings and specifications by Owner, FNI will proceed with the performance of services in this phase as follows: FNI Professional Agreement Page 4 of 12 1. Assist OWNER in securing bids, issuing notice to bidders and notifying selected plan rooms. The notice to bidders will be furnished to OWNER for publication in the local news media. The cost for publications shall be paid by OWNER. 2. Distribute plans to bidders using the web -based CivCast utilized by Freese and Nichols for bidding projects. Cost for any bidder's requests for hard copies of bid documents will be paid for by bidder. Keep a record of prospective bidders and plan rooms and other parties to whom the bidding documents have been distributed. Advertise for bids on FNI's website, and keep the website updated with addenda information, plan holder lists, and bidding information. 3. Attend one (1) pre -bid conference. 4. Issue Addenda as appropriate to clarify, correct, or change the bidding documents. 5. Assist OWNER in the opening, tabulation, and analysis of the bids received and furnish recommendations on the award of contract as appropriate. 6. Assist OWNER in the preparation of documents for execution of the construction contract. FNI will conform the contract documents, make four (4) original copies for execution. FNI will also make ten (10) conformed copies of the plans and specifications for use by the Contractor and OWNER and Engineer. The ten (10) copies will include five (5) full size copies, five (5) half size copies, and electronic PDF copy. 7. The Bid and Award phase will be considered complete upon execution of the construction contracts and distribution of the conformed copies of the plans and specifications. FNI Professional Agreement Page 5 of 12 Special Services: FNI shall render the following special services in connection with The Project: A. HYDRAULIC MODELING: FNI will provide hydraulic modeling services as follows: Develop System Curves for Existing and 20-year Average Day & Maximum Day Demand Conditions: FNI will utilize the existing system and 20-year scenarios for average day and maximum day demand conditions to prepare system curves for the SEWRP Effluent PS No 2. 2. Prepare Technical Memorandum on System Curve Development: FNI will prepare a brief technical memorandum summarizing the assumptions used in calculating the maximum flow rate and system curves. 3. Utilize the Hydraulic Model to generate HGL exhibits for the Project FNI Professional Agreement Page 6 of 12 EXHBIT A, PART 2, ADDITIONAL SERVICES AMENDMENT No. 1 SOUTHEAST WATER RECLAMATION PLANT (SEWRP) EFFLUENT PUMP STATION #2 IMPROVEMENTS ENGINEERING DESIGN SERVICES Various ADDITIONAL SERVICES incidental to the PROJECT, but not within the scope of the BASIC ENGINEERING SERVICES, which may be performed or arranged for separately by the Owner, or may be added to the Engineer's responsibilities by mutual agreement and written authorization include, but are not necessarily limited to, the following: (1) Survey and SUE of the pump station site. (2) Geotechnical Investigation of the pump station site. (3) Assessment of or modifications to existing facilities at the SEWRP other than the Effluent Pump Station No.2. (4) Topographic survey and sub -surface utility engineering (SUE) of areas outside of the Effluent Pump Station No 2 site. (5) Environmental evaluation and permitting; (6) Provide land acquisition services, including appraisals and attend condemnation hearings; (7) Furnish construction plans and specifications in excess of those specified; (8) Perform temporary flow monitoring required to evaluate flows; (9) Provide additional borings which may be occasioned by the depth to rock being deeper than anticipated or because of changes in geological conditions which necessitate additional evaluation to properly define the stratigraphic conditions; (10) Provide borings through rock strata; (11) Preparation of a Pre -Construction Notification or an Individual Section 404 permit application for submittal to the U.S. Army Corps of Engineers (USACE); (12) Preparation of a Jurisdictional Determination (JD) Report or a request for a USACE JD; (13) Presence/absence surveys for federally listed threatened/endangered species; (14) Conducting cultural resources studies or surveys; (15) Phase 1/II Environmental Site Assessments; (16) Preparation of a Storm Water Pollution Prevention Plan (SWPPP); (17) Assist the City in procurement of state or federal funding; (18) Provide any other services otherwise excluded in this AGREEMENT but customarily furnished in accordance with generally accepted engineering practices; (19) In -person monthly progress meetings; FNI Professional Agreement Page 7 of 12 (20) General and/or Resident Representation during construction; and (21) Design of new diesel back-up generator system for Effluent Pump Station No. 2. FNI Professional Agreement Page 8 of 12 EXHBIT A, PART 3, RESPONSIBILITIES OF THE OWNER AMENDMENT No. 1 SOUTHEAST WATER RECLAMATION PLANT (SEWRP) EFFLUENT PUMP STATION #2 IMPROVEMENTS ENGINEERING DESIGN SERVICES RESPONSIBILITIES OF OWNER: Owner shall perform the following in a timely manner so as not to delay the services of FNI: A. Owner recognizes and expects that certain Change Orders, herein so called, may be required. Any responsibility of Engineer for the costs of Covered Changed Orders will be determined on the basis of applicable contractual obligations and professional liability standards. For purposes of this paragraph, the responsibility of Engineer for the costs of Change Orders will not include: • any costs that Owner would have incurred if the Change Order work had been included originally in the Contract Documents and its lack of inclusion was not due, in whole or in part, to any fault, error, or omission of Engineer related thereto, • Any costs that are due to unforeseen site conditions, or • Any costs that are due to changes made by the Owner. • Any costs that are incurred due to the negligence of the construction contractor Wherever used in this document, the term Engineer includes Engineer's officers, directors, partners, employees, agents, and Engineers Consultants. B. Designate in writing a person to act as Owner's representative with respect to the services to be rendered under this AGREEMENT. Such person shall have contract authority to transmit instructions, receive information, interpret and define Owner's policies and decisions with respect to FNI's services for the Project. C. Provide all criteria and full information as to Owner's requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; and furnish copies of all design and construction standards which Owner will require to be included in the drawings and specifications. D. Assist FNI by placing at FNI's disposal all available information pertinent to the Project including previous reports and any other data relative to design or construction of the Project as provided in this AGREEMENT. E. Arrange for access to and make all provisions for FNI to enter upon public and private property as required for FNI to perform services under this AGREEMENT. F. Examine all studies, reports, sketches, drawings, specifications, proposals and other documents presented by FNI, obtain advice of an attorney, insurance counselor and other consultants as Owner deems appropriate for such examination and render in writing decisions pertaining thereto within a reasonable time so as not to delay the services of FNI. FNI Professional Agreement Page 9 of 12 G. Furnish approvals and permits from all governmental authorities having jurisdiction over the Project and such approvals and consents from others as may be necessary for completion of the Project, except as otherwise the responsibility of FNI as provided in this AGREEEMENT. H. Give prompt written notice to FNI whenever Owner observes or otherwise becomes aware of any development that affects the scope or timing of FNI's services. I. Furnish, or direct FNI to provide, Additional Services as stipulated in Exhibit "A," Part 2, if deemed necessary by Owner. J. Bear all costs incident to compliance with the requirements of this Exhibit "A", Part 3. K. Provide the following services, unless provided specifically otherwise in this Agreement: a. Provide land acquisition services. b. Pay all permits fees and mitigation cost. c. Provide land title research and title policy. d. Provide advertisement for bids in local publications as required. FNI Professional Agreement Page 10 of 12 EXHIBIT B, PART 1— BUDGET AMENDMENT No.1 SOUTHEAST WATER RECLAMATION PLANT (SEWRP) EFFLUENT PUMP STATION #2 IMPROVEMENTS FINAL DESIGN ENGINEERING SERVICES CITY and ENGINEER have established a not -to -exceed budget of $350,297 to complete all services under this AGREEMENT. This amount will not be exceeded without a contract amendment. CITY will pay the ENGINEER hourly, for services identified in Exhibit A, based on ENGINEERS Fee Schedule presented as EXHIBIT C. Subconsultant services will be billed at cost to ENGINEER with a 10 percent handling fee. The Budget is presented for the services of ENGINEER under this AGREEMENT are provided in this Exhibit B. CITY and ENGINEER agree to allow redistribution of funds between Tasks as appropriate to allow flexibility in providing the needed services within the not -to -exceed budget. ENGINEER agrees to complete these services as delineated above. Should there be a Change in Scope of Work or Time of Performance, then this can result in an amendment to this contract which shall be negotiated at that time. The budget assumes that all work will be completed within 360 calendar days from the Notice to Proceed. FNI Professional Agreement Page 11 of 12 EXHIBIT B, PART 2, HOURLY RATE SCHEDULE COMPENSATION AMENDMENT No.1 SOUTHEAST WATER RECLAMATION PLANT (SEWRP) EFFLUENT PUMP STATION #2 IMPROVEMENTS FINAL DESIGN ENGINEERING SERVICES LUBBOCK RATE SCHEDULE COMPENSATION Compensation to FNI for Services in Attachment SC shall be the lump sum of Three Hundred Fifty Thousand Two Hundred Ninety - Seven Dollars ($350,297). If FNI sees the Scope of Services changing so that Additional Services are needed, including but not limited to those services described as Additional Services in Attachment SC, FNI will notify OWNER for OWNER's approval before proceeding. Additional Services shall be computed based on the following Schedule of Charges. Position Rate Principal / Group Manager 305 Technical Professional - 6 293 Technical Professional - 5 234 Technical Professional - 4 200 Technical Professional - 3 173 Technical Professional - 2 152 Technical Professional -1 125 CAD Technician/Designer- 3 168 CAD Technician/Designer - 2 126 CAD Technician/Designer-1 100 Senior CAD Technician/Designer 207 Construction Manager-4 165 Construction Manager- 3 135 Construction Manager - 2 128 Construction Manager- 1 100 Corporate Project Support - 3 140 Corporate Project Support - 2 126 Corporate Project Support -1 96 Intern/ Coop 65 Rates for In -House Services Technology Charge Bulk Printing and Reproduction $8.50 per hour B&W Color Small Format (per copy) $0.10 $0.25 Travel Large Format (per sq. ft.) Standard IRS Rates Bond $0.25 $0.75 Glossy / Mylar $0.75 $1.25 Vinyl/Adhesive $1.50 $2.00 Mounting (per sq. ft.) $2.00 Binding (per binding) $0.25 OTHER DIRECT EXPENSES: Other direct expenses are reimbursed at actual cost times a multiplier of 1.10. They include outside printing and reproduction expense, communication expense, travel, transportation and subsistence away from the FNI office and other miscellaneous expenses directly related to the work, including costs of laboratory analysis, test, and other work required to be done by independent persons other than staff members. For Resident Representative services performed by non-FNI employees and CAD services performed In-house by non-FNI employees where FNI provides workspace and equipment to perform such services, these services will be billed at cost times a multiplier of 2.0. This markup approximates the cost to FNI if an FNI employee was performing the same or similar services. Rates to be adjusted no more than 5% annually LUB19 FNI Professional Agreement Page 12 of 12 �I �■ � •' OHMH 3 -- #- � | � � .e � � ...,� .�..,. . . ■. � .............�...,,..�,... � ■■ � .--..... . . , , ■" � �� --- ----------- • - . �2 | ! � ] . � ® !■ i | � |I � f ■ . , ||2||}| ]lfl�ilift] Oil N 002 No Text ONII�II I IIII II�IIINII!!lI�I IIIIIIIIIIIII�l�I IIIIINIY 0111 III I IlUlllll IIIINIInllllll�l NluiinllllNllll9. �oo�oo�000 000rno oos000�cop oo!�o. noom��m m��9�oon u 000nn�000weemee :eeee�eee:eeeieee: e:eeesee�enexeee CERTIFICATE OF INTERESTED PARTIES FORM 1295 lofl Complete Nos. 1- 4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING Certificate Number: 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. 2020-700641 Freese & Nichols, Inc. Fort Worth, TX United States Date Filed: 12/21/2020 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. Amendment 1 to Contract 15208 SE Water Reclamation Plant Effluent PS #2 Improvements 4 Nature of interest Name of Interested Party City, State, Country (place of business) (check applicable) Controlling Intermediary Reedy, Mike Houston, TX United States X Payne, Jeff Fort Worth, TX United States X Wolfhope, John Austin, TX United States X Greer, Alan Fort Worth, TX United States X Cole, Scott Fort Worth, TX United States X Archer, Charles Raleigh, NC United States X Johnson, Kevin Dallas, TX United States X Coltharp, Brian Fort Worth, TX United States X Pence, Bob Fort Worth, TX United States X 5 Check only if there is NO Interested Party. 6 UNSWORN DECLARATION My name is LaToya Goodwin and my date of birth is My address is 10497 Town & Country Way, Suite 600 Houston TX 77024 us (street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in Harris County, State of Texas —on the 21 st day of December , 20 20 (month) (year) Signature of a6(horizdd agent of contracting business entity (Declarant) I-orms proviaea Dy I exas ttnlcs c;ommisslon www.ethlcs.state.tx.us Version V1.1.cd34673b