Loading...
HomeMy WebLinkAboutResolution - 1830 - Accept Paving Improvements- Kerr Construcion- Lots 2-88 B7, Furrwolf Addition - 09/27/1984LDS:clk RESOLUTION Resolution_#1830 September 27, 1984 Agenda Item #23 RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Furr-Wolf Addition, Lots 2-88, Block 7 made arrangements with Kerr Construction Company for the construction of paving improvements on a certain street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the above mentioned addition including the following street: Street stub removal and C & G construction on west side of Salem Avenue between Lots 85 and 86 designated as new sub- division Unit Number 2031-48. AND WHEREAS, the construction of the above improvements on the above mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in ac- cordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF LUBBOCK, TEXAS. I. That the improvements on said portions of the above mentioned street be and the same are hereby accepted. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 27TH DAY OF SEPJWMBER, 194. an tmenry, AT MT: AV, a tte�Boy , it Se etary APPRQVED AS TO CONTENT: Don nnin City Engineer APPROVED AS TO FORM n Ross, Jr., City Atto Resolution #1830 CONSOLIDATED FINAL ESTIMATE FURR-WOLF ADDITION LOTS 2-88, BLOCK 7 Acnepted.'.9-27-T984 QUANTITIES L.F. C.Y. RemovalL.F. C & G Unit & Pavement C & G & Dispos'al of Removal & Sub -Unit Location Patching paving & base disposal 2031-48 Street stub removal and C & G construction on West side of Salem Avenue between Lots 85 & 86 20.44 92.00 31.00 78.54 COST DISTRIBUTION Unit & Contract Property Sub -Uri t Cost Owner Cost 2031-48 $1,100.00 * $1,100.00 * Lump Sum Contract