Loading...
HomeMy WebLinkAboutResolution - 1810 - Accept Paving Improvements - Kerr Construction - Tract F, King's Gate Addition - 09/13/1984Resolution #1810 September 13, 1984 Agenda Item #17 RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND AVENUES AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of King's Gate Addition, Tract "F" made arrangements with Kerr Construction Company for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the above mentioned addition including the following streets: 84th Street from its intersection with the east lip line of Orlando Avenue to its intersection with a line 16 feet west of west property line of Nashville Avenue known and design- ated as New Subdivision Sub -Unit Number 40 of Unit Number 2030. Orlando Avenue from its intersection with aline 13 feet south of south property line of 82nd Street to its inter- section with a line 16 feet south of south property line of 84th Street and designated as New Subdivision Sub -Unit Number 41 of Unit Number 2030. AND WHEREAS, the construction of the above improvements on the above mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City Specifications and in accor- dance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the above mentioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to notify the Developer of acceptance by the Lubbock City Council. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 13TH DAY OF SEPTEMBER, 1.984. ATTEST._ , City secretary APPROVED AS TO FORM: ID� Don nning ity Engineer APPROVED AS TO FORM: n G. KOSS, Jr., CONSOLIDATED FINAL ESTIMATE KING'S GATE ADDITION TRACT "F" Accepted 9/13/1984 QUANTITIES Resolution 1810 2030-41 Orlando Ave. from 13' S of SPL of 82nd St. to 16'S of SPL of 84th Street. 246.58 2,900.53 1,387.54 190.64 TOTAL QUANTITIES 246.58 7,867.45 3,612.77 283.36 122.31 263.76 318.27 513.76 COST ESTIMATE 7,867.45 S.Y. Paving 6" Base @$ 6.65 $52,318.54 3,612.77 S.Y. S.Y. L.F. S.Y. Alley S.Y. L.F. Unit & 6" Rein. Paving 6" Ret. & Drg. Valley 12" Sub -Unit Location Concrete 6" Base C.&_G. Channel Gutter C & G @$ 8.90 Paving 246.58 S.Y. 6" Reinforced Concrete Paving @$23.50 $ 5,794.63 2030-40 84th St. from ELL of CONTRACT COST $96,996.02 Orlando Ave. to 16' W of WPL of Nashville Avenue. 4,966.92 2,225.23 92.72 195.96 250.00 2030-41 Orlando Ave. from 13' S of SPL of 82nd St. to 16'S of SPL of 84th Street. 246.58 2,900.53 1,387.54 190.64 TOTAL QUANTITIES 246.58 7,867.45 3,612.77 283.36 122.31 263.76 318.27 513.76 COST ESTIMATE 7,867.45 S.Y. Paving 6" Base @$ 6.65 $52,318.54 3,612.77 L.F. Curb & Gutter @$ 5.85 $21,134.70 283.36 S.Y. Alley Return & Drainage Channels @$21.90 $ 6,205.58 318.27 S.Y. Valley Gutter @$21.90 $ 6,970.11 513.76 L.F. 12" Curb & Gutter @$ 8.90 $ 4,572.46 246.58 S.Y. 6" Reinforced Concrete Paving @$23.50 $ 5,794.63 CONTRACT COST $96,996.02 COST DISTRIBUTION Unit & Construction Developer Sub -Unit Cost Cost 2030-40 $54,594.70 $54,594.70 3030-41 $42,401.32 $42,401.32 TOTAL $96,996.02 $96,996.02