Loading...
HomeMy WebLinkAboutResolution - 2021-R0014 - Amendment No. 6 to Contract 13109 with Lee Lewis Construction 1.12.21Resolution No. 2021-R0014 Item No. 7.18 January 12, 2021 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Amendment No. 6 to Construction Manager at Risk Contract No. 13109 for construction services related to Citizens Tower, by and between the City of Lubbock and Lee Lewis Construction, Inc., of Lubbock, Texas, and related documents. Said Contract is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on January 12 , 2021. DANIEL M. POPE, MAYOR ATTEST: Z' U4, X- __ - ___ - - ____ - __ - Re a ca Garza, City Secre ®ry APPROVED AS TO CONTENT: MarkVearwoocr, Assistant City Manager APPROVED AS TO FORM: r&X-c K li Leisure, Assistant City Attorney RES.Amend 6 Lee LewisCitizensTower 01.05.21 Resolution No. 2021-R0014 Amendment 6 To Agreement Between The City of Lubbock, TX And Lee Lewis Construction, Inc. THIS IS THE SIXTH AMENDMENT TO THE AGREEMENT (Contract #13109) dated and entered into the 260' day of January 2017 by and between the City of Lubbock ("City") and Lee Lewis Construction, Inc. ("LLCI") of Lubbock, Texas, for providing construction manager at risk services for city -owned property known as Citizens Tower. WITNESSETH WHEREAS, in accordance with Article 2, Sections 2.2.1 and 2.2.8 of said agreement LLCI proposed the Guaranteed Maximum Price (GMP) of forty-six million two hundred thirty-five thousand seven hundred fifty-one and 00/100 ($46,23 5,75 1). WHEREAS, on August 13, 2019 the GMP was increased by four hundred twenty-nine thousand three hundred eighty-one dollars and 24/100 ($429,381.24) for the construction of facilities for the City's public information office. WHEREAS, on November 5, 2019 the GMP was increased by one million one hundred fifty-six thousand nine hundred eighty-five dollars and 94/100 ($1,156,985.94), of which seven hundred eighty-five thousand and 00/100 ($785,000.00) were for allowances for which estimates were pending. WHEREAS, on December 3, 2019 the GMP was approved a not -to -exceed allowance of two hundred eighty thousand and NO/100 ($280,000.00), for additional services for the exterior waterproofing of certain sidewalks and pavers, street -side planters, and screening for generators. WHEREAS, now the City desires to engage LLCI for the performance of an additional scope of services, details for which are provided in Exhibits "A" through "G", attached hereto and incorporated herein, at Citizens Tower for additional work requested by the City, including, but not limited to: exterior lighting, concrete crack injection, landscape planters, and mechanical, electrical, and plumbing infrastructure. WHEREAS, all other portions of the original Agreement and previous Amendments shall remain in place and are not altered by this amendment. NOW, THEREFORE, the City and LLCI agree to the following terms in this SIXTH AMENDMENT: THAT the GMP shall be increased by one hundred ten thousand seven hundred ninety one dollars and 92/100 ($110,791.92). This amendment includes an extension of thirty-six (36) calendar days to the contract. The original Contract Amount_________________________________----------------------------------------------- $ 46,235,751.00 The sum of all previous authorized Amendments (unchanged) ............................$ 1,866,367.18 Net Percentage of previous Amendments +4.04% The Contract Amount prior to this Amendment____________________________________________________ $ 48,102,118.18 The Contract Amount will be (increased) by this Amendment .............................$ 110,791.92 Net Percentage of this Amendment +0.24% The new Contract Amount ----------------------------------------------------------------------- -............... $ 48,212,910.10 Total Percentage of all Amendments +4.28% IN WITNESS HEREOF, the parties have executed this Agreement as of this 12th day of January , 2021. CITY OF L B OCK LEE L Daniel M. Pope, 211 MAYOR Pr ATTEST: 'i� 'L� X Reb c Garza, City Sec tary APPROVED AS TO CONTENT: akLS& -h. txk Wesley D. Oerett, Director of Facilities Management AP ROVED S TO FORM: K Ili Leisure, Assistant City Attorney STRUCTION, INC. EXHIBIT A Perkins&Will PROPOSAL REQUEST 30 To: Lee Lewis Construction From: Jessica Zuniga Subject: PR#30 - Wall Packs Date: 4.10.2020 Project Name: Citizens Tower Project Number:146064 Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein. Within 7 days, the Contractor must submit this proposal or notify the Architect, in writing, of the date on which proposal submission is anticipated. This is not o change order, a construction change directive, or a direction to proceed with the work described in the proposed modifications. Description of Change: Add 8 Wall packs to the alleyway. Owner to confirm locations shown are approved. Revised Drawings Attached: PR#30 Jessica Zuniga Arch III t 214.283.8858 Perkins&Will 2218 Bryan Street, Suite 200 Dallas, Texas 75201 www.perkinswill.com Lee Lewis Construction, Inc. REQUEST FOR PROPOSAL Phone: 853.8169 No. No.ON30 Fax: 853-8183 TITLE: PR 30 Alley Wall Packs DATE: 04/16/2020 PROJECT: City of Lubbock Citizens Tower JOB: 1702 TO: Attn: Wes Everett CONTRACT NO: 1702-1 City of Lubbock Phone: Fax: RE:, To: From: Number: DESCRI�P<TIONiOFjPROPOSAL Furnish and install 8 wall packs in the alleyway per PR#30 issued by P+W. Nate: Revised 6/16 at request of COL to provide 5 wall packs in lieu of 8 and utilize a shared pathway with trash compactor power. Item Description Stack# Quantity Units Unit Price Tax Rate Tau Amount Net Amount 00001 Tempk ek We labor & 1 $8.126.10 0.00% $0.00 $9.126.10 mataw 00002 Misc. wall & ailing 1 $2,M.00 0.00% $0.00 52.M.00 repairs APPROVAL: By • Wes Everett Date: Fh=V ,. m Unit Cost: Unit Tax: Unit Total: By: $10,626.10 $0.00 $10,626.10 r "LJosh Weems Date: Page No. 1 of 1 Pages Proposal Attn: Josh Weems ' PR 30 Revised jA6-16-2020 P.O. BOX 3367 (806) 745.7070 LUBBOC TEXAS 79452 TECL # 17764 Proposal Submitted to Lee Lewis Construction Inc Fax 797-8492 Proposal No. 04142020 Street 7810 Orlando Avenue Phone 797-8400 Date April 14, 2020 City, State and Zip Code Lubbock, TX 79423 Job name Citizen Tower Email Address ,jweems@leelewis.com Date of Plans job Location Lubbock, TX ob Phone e hereby submit specifications and estimates for: PR 30 Wall Pack Fixtures Labor and Materials To: install 5 wall pack fixtures on west wall of the Citizens Tower Building facing the alley. New fixtures to be connected to panel 1 HA and routed through lighting relay panel for control. Note: exact fixture locations and heights may be adjusted for obstructions, structure, ceiling heights inside building etc per existing conditions. Exclusions: cut, patch of sheetrock, painting, temperature control conduit, wiring, Any work not specifically stated in this proposal e propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of: dollars ( $ 8,126.10 ) . II material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or Authorized deviation from above specifications involving extra costs will be executed Signature Mike Temple only upon written orders, and will become an extra charge over and above p he estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary Note: This proposal may be insurance. Our workers are fully covered by Workmen's Compensation withdrawn by us if not accepted within days Insurance. Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized o do the work as specified. Payment will be and as outlines above. Signature Date of Acceptance: Signature EXHIBIT B Perkins&Will To: Lee Lewis Construction Date: 9.23.2020 From: Jessica Zuniga Project Name: Citizens Tower Subject: PR#37- Add Hose-Bibbs on Level11 Balcony Project Number:146064 PROPOSAL REQUEST 37 Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein. Within 7 days, the Contractor must submit this proposal or notify the Architect, in writing, of the date on which proposal submission is anticipated. This is not a change order, a construction change directive, ora direction to proceed with the work described in the proposed modifications. Description of Change: • Provide freeze proof hose bibb at each side of the balconies at level 11. Ensure wall hydrant valve bodies are ordered at a length that keeps the water portion on the conditioned side of wall. Revised Drawings Attached: PR#37 Jessica Zuniga Arch III t 214.283.8858 Perkins&Will 2218 Bryan Street, Suite 200 Dallas, Texas 76201 www.porkinswill.com Lee Lewis Construction, Inc. REQUEST FOR PROPOSAL Phone: 853-8169 No. No.00037 Fax: 853-8183 TITLE: PR 37 lvl I 1 balcony hose bibs DATE: 10/29/2020 PROJECT: City of Lubbock Citizens Tower JOB: 1702 TO: Attn: Wes Everett CONTRACT NO: 1702-1 City of Lubbock Phone: Fax: RE: To: From: Number: DESCRIp,TION OF PROPOSALs�;,�; z Furnish and install additional hose bib on each level I 1 balcony per PR 37 issued by P+W. Item Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 Plumbing 1 $10,861.00 0.00% S0.00 $10,861.00 00002 walerproormg & 1 $31500.00 0.00% $0.00 $3.500.00 concMIC [!Pair 00003 Clean up 1 $1.000.00 0.00% $0.00 $1.000.00 APPROVAL: By: Wes Everett Date: 11gimVery 0 Unit Cost: Unit Tax: Unit Total: By: i Weems Date: Q - 2--' $15,361.00 $0.00 $15,361.00 Anthony Mechanical, Inc. Mechanical Contractors 525 E. 40"' Street Lubbock, TX 79452 (806) 747-4151 Citizens Tower IIth Floor Balcony Frost Proof Roof hydrants We propose as a Base Bid to provide the following: • Install two new roof hydrants, one on north balcony and one on south balcony. • Tie in on the 10'h floor mop sink room with valve. • Core two holes in ceiling of 101' floor and extend pipe to corner of balconies. • Insulate new domestic water line. BASE BID: Deduct for Wall hydrants OUR BASE PRICE EXCLUDES THE FOLLOWING: • ALLOWANCES • PAYMENT AND PERFORMANCE BOND • SALES TAX • PAINTING or COLOR CODING • FIRE PROTECTION & ALARMS • CONCRETE PATCHING OR REPLACEMENT • WATER SEAL PENETRATIONS IN BALCONY Jason Richards 10/27/20 Price good for 30 days $109861.00 $ 750.00 EXHIBIT C Lee Lewis Construction, Inc. Phone: 853.8169 Fax: 953-8183 TITLE: N isc. leak repair PROJECT: City of Lubbock Citizens Tower TO: Attn: Wes Everett City of Lubbock + Phone: Fax: RE: To: From: DESCRIPIT0N OF PROPOSAL Fumish and install misc. leak repair at problematic areas. Item Description Stock# Quantity Units OOODI Della Smcturai t APPROVAL: By: Wes Everett Date: PAW-. 0 CONST CHANGE REQUEST No. 0071 DATE: 09/15/2020 JOB: 1702 CONTRACT NO: 1702-1 Number: Unit Price Tax Rate Tax Amount Net Amount $5.500.00 0.00% $0.00 55.500.00 Unit Cost: $5,500.00 Unit Tax: $0.00 Unit Total: $5,500.00 By: w Date:— i �� INVOICE Delta Structural Technology, LLC 4500 Mercantile Plaza Dr, Suite 300 Invoice No.: 18134-1725 Fort Worth, TX 76137 Date: 9/15/2020 817-900-9152 To Attn: Josh Weems Lee Lewis Construction 7810 Orlando Ave. Lubbock, TX 79423 Clltasns Tower Renovadon NET 30 10N612020 FIRM�• ■ ■ - ■ 1. ORIGINAL CONTRACT SUM #6,600.00 2. NET CHANGE BY CHANGE ORDERS $0.00 3. CONTRACT SUM TO DATE (Lino 1 * 2) $5"0.00 4. TOTAL COMPLETED & STORED TO $5,800,00 5. RETAINAGE. $0.00 8. TOTAL EARNED LESS RETAINAGE $6,600A0 7. LESS PREvious cER1 mexrES FOR $0.00 8. CURRENT PAYMENT DUE Sfi,500,00 0. BALANCE TO FINISH, INCLUDING RETAINAGE SM116 Subtotal # amll l: TOTAL Make all checks payable to Delta Structural Technology, LLC THANK YOU FOR YOUR BUSINESSI 11/16/20 Josh Weems Lee Lewis Construction. Re: Citizens Tower Crack Injection Dear Mr. Weems Per your request, Delta Structural Technology, LLC (DSTL) is pleased to submit the following pricing proposal for the above- mentioned project. This proposal will include all equipment, tools, material and labor to crack inject 100 LF with Scopes of Work Scope #1: Crack Inject 100 LF —1 day Lump Sum $5,500.00 Section #1— Includes the following general scope of work: 1. 1 Mobilization of all personnel, materials and equipment required. 2. Up to one hour of site -specific safety training for our crew. 3. All necessary access equipment. 4. Continuous air monitoring. 5. Necessary ventilation. Section #2 — Lee Lewis shall provide the following: 1. Minimum of a 20' X 20' storage area for equipment staging. 2. 1 Parking spot and dumpster for waste. DELTA STRUCTURAL TECHNOLOGY, LLC. Texas I California I Washington I Tennessee I Louisiana I Florida Corporate Office: 204 S Front Street, Aledo, Texas 76008 P. 281-541-9693 F. 682-235-9118 E. drew(cDfiberwrao.com 3. On -site toilet facilities Section #3 — The following are assumptions and declarations regarding the above -listed pricing: 1. Delta Structural Technology, LLC is not a union contractor and no provisions have been made to participate in any union of PLA. 2. No lead -based, asbestos -based or harmful materials to be removed by DSTL. 3. 1 pre -construction meeting or mock up. Mock ups will be performed as the V repairs. 4. One (1) mobilization to the project site is included in the pricing listed above. Each additional mobilization will be invoiced at a rate of $5,500.00. 5. Stand-by rates - $400.00 per man, per day. This cost will only apply if DSTL is required to stand by due to delays and/or conditions that are beyond the control of DSTL. 6. All work to take place Monday through Friday, between 7:00 AM and 4:00 PM. Although DSTL is available to work alternate hours, no provisions have been made in this proposal for night or weekend shift premiums. 7. Above -listed pricing is based on non -union, prevailing wages. 8. Release of Delta Structural Technology's retention shall be tied to the completion of Delta Structural Technology's scope of work, and not the completion of the overall project work. 9. Proposal valid for 60 days. 10. Deposit of 30% 11. Payment — Net 15 days. If you have any questions or need additional information, please contact me at 281-541-9693 drew@fiberwrap.com. Thank you for the opportunity to work with your firm on this project. Sincerely, Drew Park Director of Operations Delta Structural Technology Proposal Terms & Conditions DELTA STRUCTURAL TECHNOLOGY, LLC. Texas I California I Washington I Tennessee I Louisiana I Florida Corporate Office: 204 S Front Street, Aledo, Texas 76008 P. 281-541-9693 F. 682-235-9118 E. drew(cDfiberwrap.com • Delta's scope of work excludes power, water and all other utilities, which shall be fumished by Customer, and the price for the work excludes any applicable permit fees, sales taxes and bond premiums. Unless specifically noted as included in the proposal, Delta does not include scaffolding or the removal of any worksite obstructions such as piping, ductwork, electrical, floor coverings or ceiling tiles. • Customer warrants that the Plans and Specifications for the Project, and any surveys, reports, test data, or other documents or information furnished by Customer to Delta in connection with the Project are accurate and sufficient for the purpose in view, and Delta is entitled to rely on such documents and information (hereafter "Project Documents"). All work shall be performed in accordance with such Project Documents, subject to the terms and conditions set out in Delta's Proposal. • If Delta encounters conditions at the site which are subsurface or otherwise concealed physical conditions which differ from those indicated in the Project Documents, or which are unknown physical conditions, or differ from those ordinarily found to exist and generally recognized as Inherent in construction activities of the type provided for herein, then Delta shall promptly notify Customer of same, and if such conditions will cause an increase in Delta's cost of or time required for performance of the work, Customer shall execute a Change Order increasing the contract price and/or extending the contract time. • Delta's Proposal does not contemplate and its scope of work does not include the containment, disposal, removal, abatement, transportation or any treatment or handling of asbestos, radon, polychlorinated biphenyl, lead paint, or any hazardous material or toxic substance. • Delta shall not be obligated to proceed with any change, addition or deletion to the work absent a written Change Order signed by Delta and Customer, establishing any adjustment to the contract price and/or the contract time as a result of such change, addition or deletion. • Terms of payment: Net thirty (30) days. Customer shall pay Delta interest at the rate of one percent (1 %) per month on any unpaid invoice amount over thirty (30) days past due. Invoices shall be paid in full and no retainage withheld unless expressly provided for in Delta's Proposal. Invoices are due and owing whether or not Customer has been paid for Delta's invoice or Delta's work, and Delta will not agree to any "pay -if -paid", "pay -when -paid" or conditional payment terms. Customer shall authorize and direct its insurance carrier to list Delta as a joint payee on any check for payment of insurance claim proceeds related to the work. • Delta shall provide its standard policies of insurance for the duration of the Project, with the following limits: workers' compensation and employer's liability — statutory; commercial general liability - $1,000,000 (occurrence basis); auto liability - $1,000,000 (occurrence basis); and excess liability - $5,000,000 (occurrence basis). Customer shall purchase and maintain the Customer's usual liability insurance. Unless otherwise provided, Customer shall also purchase and maintain property insurance written on a builder's risk "all-risk" or equivalent policy form in the amount of the initial contract price, plus value of subsequent contract modifications, on a replacement cost basis, without optional deductibles. • Delta shall not be responsible for and assumes no liability for any engineering or design services performed, or plans, drawings, specifications or calculations prepared, other than those performed or prepared by Delta in connection with the design and installation of its Fiberwrap products. • Delta warrants its Fiberwrap products for one (1) year from date of installation. Delta warrants that all other work shall be free from defects in materials or workmanship for a period of one (1) year from the date of substantial completion. EXCEPT AS PROVIDED HEREIN, DELTA MAKES NO OTHER WARRANTY AS TO THE WORK, EXPRESS OR IMPLIED, AND DELTA EXPRESSLY DISCLAIMS ANY WARRANTY OF FITNESS FOR INTENDED USE, MERCHANTABILITY, HABITABILITY, AND ANY OTHER WARRANTY, IMPLIED OR STATUTORY. • Delta shall indemnify, defend and save Customer harmless from any and all claims, damages, losses and expenses, including but not limited to attorneys' fees, attributable to bodily injury, sickness, disease or death, to any person, or damage to or destruction of tangible property (other than the work itself), but only to the extent caused by any negligent act or omission of Delta, a subcontractor of Delta, or anyone for whose acts Delta may be liable, arising out of or related to the work, whether or not such claim, demand, suit, damages, costs or expense is caused in part by a party indemnified hereunder. Customer agrees to indemnify, defend and save Delta harmless from any and all claims, damages, losses and expenses, including but not limited to attomeys' fees, attributable to bodily injury, sickness, disease or death, to any person, or damage to or destruction of tangible property (other than the work itself), to the extent caused by any negligent act or omission of Customer, an agent or employee of Customer, or anyone for whose acts Customer may be liable, arising out of or related to the work, whether or not such claim, demand, suit, damages, costs or expense is caused in part by a party indemnified hereunder. • Waiver of Consequential Damages. Customer expressly waives any and all claims against Delta for consequential damages arising out of or related to the work, including, but not limited to, claims for damages for loss of use, loss of revenue, loss of business, lost profit, and interest expense or other financing costs or expenses, or rental costs for temporary structures or facilities. • All claims, disputes, and other matters in question arising out of or relating to any agreement for the work, or the breach thereof, may be decided, solely at Delta's option, by arbitration, which shall be conducted in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association then in effect. Customer agrees that in the event Customer and any architect, engineer, or another contractor, or owner, or other third party are involved in an arbitration arising out of or related to the Project, which pertains in whole or in part to work performed by Delta, Customer shall, upon Delta's request, by consolidation, joinder or otherwise, consolidate the two arbitration proceedings, and any such claims, disputes or other matters shall then be determined in the consolidated arbitration proceeding. Venue for any arbitration, litigation or other legal proceeding shall be in Harris County, Texas. • Delta's Proposal is subject to Customer's acceptance of the foregoing terms and conditions, and negotiation of a mutually agreeable contract. Accepted by: Date: DELTA STRUCTURAL TECHNOLOGY, LLC. Texas I California I Washington I Tennessee I Louisiana I Florida Corporate Office: 204 S Front Street, Aledo, Texas 76008 P. 281-541-9693 F. 682-235-9118 E. drew(afterwraD.com Title: DELTA STRUCTURAL TECHNOLOGY, LLC. Texas I California I Washington I Tennessee I Louisiana I Florida Corporate Office: 204 S Front Street, Aledo, Texas 76008 P. 281-541-9693 F. 682-235-9118 E. drew(cDfiberwrap.com 1 :0:4:111.31 a Lee Lewis Construction, Inc. Phone: A53-8169 Fax:853.8183 TITLE: Level 11 balcony planters PROJECT: City of Lubbock Citizens Tower TO: Attn: Wes Everett City of Lubbock Phone: Fax: CONST CHANGE REQUEST No. 0073 DATE: 09/29/2020 JOB: 1702 CONTRACT NO: 1702-1 RE: To: From: Number: DESCRIPTION OF PROPOSAL Furnish and install 16 planters on level l 1 balconies to cover'de backs' as requested by COL. Item Description stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 16 planun t8" option 1 $9.6m.00 0.00% $O.00 $9.600.00 APPROVAL: By: Wes Everett Date: P'j"K,. 0 Unit Cost: $9,600.00 Unit Tax: $0.00 Unit Total: $9,600.00 Date: Clayton Brake From: Alex Scarborough <AlexS@tomstreeplace.com> Sent: Friday, September 18, 2020 12:15 PM To: Clayton Brake Subject: Old Town Fiberglass Quote 24146 - Citizens Tower Tie Back Planters.PDF Attachments: Old Town Fiberglass Quote 24146 - Citizens Tower Tie Back Planters.pdf This email originated from an external sender. Please exercise caution before clicking on any links or attachments. Clayton Attached is a quote from the manufacture for the 'Tie Back' Planters. This quote is based on an order of 10. If there are more the unit cost won't change but if there are less the unit cost will increase. The bottom line per pot cost to the City for the 24" Tall pots or the 18" tall pots is as follows: 24" Tall option: 18 x 18 x 24T Pot is $551 each plus 100 for soil and plant = $651/pot @ 10 pot or bigger order 18" Tall option: 18 x 18 x 18T Pot is $500 each plus $100 for soil and plant - $600/pot @ 10 pot or bigger order Description from Old Town: Per your request, attached please find attached Old Town Fiberglass quote 24146 for the Citizen's Tower "Tie Back" Planters. The quote was prepared based on (10) SL1824 (square planter: 18" W X 18" L X 24" H) with custom recessed bottom to clear existing "tie back" approximately 6-inch diameter by 1-inch high. If the quantity increases or decreases the custom part charge is subject to change. If you prefer the smaller Square planter SL1818 (square planter: 18" W X 18" L X 18" H) the price for the planter only is $243.00 each. This does not include the custom part charge or freight. These would be planters that match finish and style of the planters in the plaza and sidewalks. have a budget of $100 per pot for soil and planting. Watering is NOT included beyond initial watering. Alex Scarborough Alex Scarborough IANDSCAPF. ARCHITECT t` 806-549-8,734 • 5104 34 "Street, Lubbock, TX?941D tom'streephoe ttiet G�trrotstr�epl<nrc.cc�m ttttTo.iunlstreej,l�arc.csm� EXHIBIT E Lee Lewis Construction, Inc. TITLE: Sewage Pump Replacement PROJECT: City of Lubbock Citizens Tower TO: Attn: Wes Everett City of Lubbock Phone: Fax: RE: To: DESCRIPTION OFPROPOSAL Phone: 853-8169 Fax: 953.9183 CONST CHANGE REQUEST No. 0074 DATE: 09/29/2020 JOB: 1702 CONTRACT NO: 1702-1 From: Number: Famish and install sewage pump replacements in Bldg C and Bldg A as requested by COL. Item Description Studs# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 pumps, pacts, labor 1 $35,800.00 0.00% $0.00 $35,800.00 AL: By: Wes Everett Unit Cost: $35,800.00 Unit Tax: $0.00 Unit Total: $351M.00 By: Date: Date: Anthony Mechanical, Inc. Mechanical Contractors 626 E. 40t' Street Lubbock, TX 79462 (806)747-4151 Citizens Tower Sewage Pumps Replacement We propose as a Base Bid to provide the following: • Replace two existing (1607 Weil) sanitary sewer pump with two new (2422 Weil) pump in the basement of LP&I Building. (Area C) • Replace two existing (1607 Weil) sanitary sewer pump with two new (2567 Weil) pump in the basement of citizens tower sub -basement. (Area A) • New components for control panel to handle 3 HP motor for the tower sump pumps. • Provide temporary pump to maintain control of sump pit until permanent pumps arrives. BASE BID: OUR BASE PRICE EXCLUDES THE FOLLOWING: • ALLOWANCES • PAYMENT AND PERFORMANCE BOND • SALES TAX • PAINTING or COLOR CODING • FIRE PROTECTION & ALARMS • CONCRETE PATCHING OR REPLACEMENT Jason Richards 9/25120 Price good for 30 days $ 35,800.00 EXHIBIT F Lee Lewis Construction, Inc. CONST CHANGE REQUEST No. 0078 0 TITLE: UCSC Dispatch HVAC PROJECT: City of Lubbock Citizens Tower TO: Attn: Wes Everett City of Lubbock Phone: Fax: Phone: 853-8169 Fax: 853-8183 DATE: 11/09/2020 JOB: 1702 CONTRACT NO: 1702-1 RE: To: From: Number: DESCRII'TION OFL_ POSAL Furnish and install 1.5 ton VRF Unit in dispatch room in USCS basement, at request of COL Item Description 00001 1.5 ton VRF & accessories 00002 Power for new unit 00003 patch & paint 00004 ceiling repair APPROVAL: By: Wes Everett Stock# Quantity Units 1 i 1 1 Unit Price Tax Rate Tax Amount Net Amount S14,962.00 0.00% S0.00 S14,962.00 $7,067.00 0.00% $0.00 S7,067.00 M.00 0.00% S0.00 M.00 $600.00 0.00% $0.00 $600.00 Unit Cost: $23,029.00 Unit Tax: $0.00 Unit Total: $239029.00 By: Date: Date: Prim vas 0 Z. 0 Anthony Mechanical, Inc. Mechanical Contractors 525 E. 40"' Street Lubbock, TX 79452 (806) 747-4151 Lubbock Power and Light Building Add 1.5 Ton VRF Unit in oom We propose as a Base Bid to provide the following: 1 • Install new 1.5-ton unit above mail room with thermostat. • Install new refrigerant piping from closest distribution box. • Install new condensate drain from new unit to condensate main. • Install fresh air duct from main to new unit. • Insulate refrigerant piping and fresh air duct. • Install controls BASE BID: OUR BASE PRICE EXCLUDES THE FOLLOWING: • ALLOWANCES • PAYMENT AND PERFORMANCE BOND • SALES TAX • PAINTING or COLOR CODING • FIRE PROTECTION & ALARMS • CONCRETE PATCHING OR REPLACEMENT • ELECTRICAL CONNECTIONS Jason Richards 10/29/20 Price good for 30 days $14,962.00 Paoe No. 1 of 1 panes Proposes Attn: Josh Weems P.O. SOX 3367 (606) 745-7070 LUBBOCK. TEXAS 79452 TECL # 17764 Proposal Submitted to Fax Proposal No. Lee Lewis Construction Inc 797-8492 1023201 Street Phone Date 7810 Orlando Avenue 797.8400 October 23, 2020 City, State and Zip Code job name Lubbock, TX 79423 Citizen Tower Email Address Date of Plans ob Location ob Phone 'wee leelewis.com Lubbock, TX e hereby submit spedfications and estimates for: Add power for new VRF in Radio -Dispatch Labor and material to provide power to a new VRF Material $1,064.00 that will be Installed in the Radio -Dispatch OH & P $107.00 Room. All work is to be performed during the weekend. We will need to be provided access during Labor $5,360.00 that time. New circuit and breaker will be installed OH & P $S36.00 utilizing existing panel. Exclusion Cut, patch, paint, repair of sheetrock Ceiling tile damage (if any) propose hereby to furnish material and labor - complete In accordance with above specifications, for the sum of - dollars ( $ 7,067.00 ) . material Is guaranteed to be as specified. All work to be completed in a wkmanlike manner according to standard practices. Any alteration or viation from above spedfications Involving extra costs will be executed IV upon written orders, and will become an extra charge over and above t estimate. All agreements contingent upon strikes, accidents or delays Vend our control. Owner to carry fire, tomado and other necessary wrance. Our workers are fully covered by Workmen's Compensation Authorized Signature Mike Temple Note: This proposal may be withdrawn by us if not accepted within 14 days ceeptanee of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized o do the work as specified. Payment will be and as outlines above. Signature Date of Acceptance: Signature EXHIBIT G Lee Lewis Construction, Inc. Phone: 853-8169 Fax:853-8183 TITLE: Electrical adds per meeting 11-3-20 PROJECT: City of Lubbock Citizens Tower TO: Attn: Wes Everett City of Lubbock Phone: Fax: RE: To: CONST CHANGE REQUEST No. 0079 DATE: 11/10/2020 JOB: 1702 CONTRACT NO: 1702-1 From: Number: DESCRIPTION OF PROPOSAL Furnish and install adds agreed upon at a site meeting on l 1-3-20 between Damn (COL), Robbie (COL). Travis (LLCI), and Jesse (temple Electric). See backup for further description. Item Desatptton Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 Sint am aN, Wgadon control, t $10.M.00 0.00% $0.00 $10.098.00 00002 Patch do paint l $400.00 0.00% $0.00 $400.00 00003 construction ek=ing l 5400.00 0.OD% $0.00 $400.00 AL: By: Wes Everett Unit Cost: $10,898.00 Unit Tax: $0.00 Unit Total: $109898.00 By: Date: Date: tiam&= 0 Page No. 1 of 1 Pages Proposes Attn: Josh Weems P.O 6 X 3367 (806) 745.7070 LUBBOCK TEXAS 79452 TECL # 17764 Proposal Submitted to Fax Proposal No. Lee Lewis Construction Inc 797-8492 1104201 Street Phone Date 7810 Orlando Avenue 797-8400 November 4, 2020 City, State and Zip Code Job name Lubbock, TX 79423 Citizen Tower Email Address Date of Plans Job Location ob Phone jweems@leelewis.com Lubbock, TX e hereby submit specifications and estimates for: Subbasement, Irrigation Controls, Inspection adds All work will be performed per site visit on 11-03-2020. Darren, Travis. Robbie, and Jesse were in attendance Labor and material to provide power for the following items. Add a dedicated circuit for a plug in the sub -basement for an air quality machine. Use the temporary service east of Citizen tower to power a small panel and plug Material $2,700.00 at a pedestal for the irrigation controller. Build a service on OH & P $270.00 an existing pole at the LP&L building for an irrigation controller. Use an existing circuit in the inspections department Labor $6,480.00 to power a plug to be installed for a copying machine. OH & P $648.00 Exclusion Cut, patch, paint, repair of sheetrock Ceiling tile damage (if any) Any work not listed above e propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of: dollars ( $ 10,098.00 ) . II material is guaranteed to be as specified. All work to be completed in a Authorized workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed Signature Mike Temple only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary Note: This proposal may be insurance. Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by us If not accepted within 14 days days Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized Signature to do the work as specified. Payment will be and as outlines above. Date of Acceptance: Signature