HomeMy WebLinkAboutResolution - 1987 - CO#1 To Contract - Heavy Highway Constructors Inc - Quirt Ave Overpass - 04/11/1985LH:ck
Resolution #1987
April 11, 1985
Agenda Item #20
RFCni 11TTnm
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City;,of Lubbock a Change Order
No. 1 adding paving quantities to the existing contract for the Quirt Avenue
Overpass, C.D.W.O. 8111, C.D.W.O. 38409 and G.W.O. 11684, for;)paving improve-
ments between said City and Heavy -Highway Conttructors, Inc., attached here-
with, which shall be spread upon the minutes of the Council and as spread
upon the minutes of this Council shall constitute and be a part of this
Resolution as if fully copied herein in detail.
Passed by the City Council on this 1.1th day of April, 19,5.
art -henry,
ATTEST:
CRane]tteVyvd, City Secretar
APPROVED AS TO CONTENT:
Don Je ings City Engineer
APPROVED AS TO FORM:
C_
n C. Ross, Jr. CitYYYy,%Attorney
Resolution #1987
CHANGE ORDER N0, 1
Quirt Avenue Overpass
CDWO 38409
GWO 11684
Lubbock, Texas
March 27, 1985
To: HEAVY HIGHWAY CONSTRUCTORS, INC.
P.O. Box 1488
Amarillo, Texas 79105
General description of work included in original contract:
Improvements to Quirt Avenue from 31st Street to 37th Street including
the construction of a nine -span, 972'-6" prestressed concrete overpass
structure, retaining walls, concrete approach pavement, flexible at grade
approach pavement and frontage roads, water and sanitary sewer utility
modification and construction, storm drainage adjustments, and related
items of work.
Original Amount of Contract. . . . e . . . . $2,886,434.50
Change Order No. 1 . . . . . . . . 0 . . . . 12,018.45
Adjusted Contract Amount. . . . . . . . . . $2,898,452.95
Adjustment in Construction Time . . . None
WHEREAS, it is desirable to make changes in the work to be constructed
under this project.
THIS AGREEMENT WITNESSETH: In consideration of the mutual advantage
gained, the Owner and the Contractor agree to the changes indicated below
and further agree that the amount of the contract shall be adjusted by the
amounts shown above.
1. Modify the west drilled shaft at Bent No. 4
to allow the existing 10" and 27" water lines
to be straddled by two 42" diameter shafts
capped with a beam to support the column above
as detailed on the drawing prepared by Henningson,
Durham & Richardson, Inc. attached to the
March 26, 1985 letter from Parkhill, Smith &
Cooper, Inc. to Heavy Highway Constructors, Inc.
Add . . . . . . . . . . $ 12,018.45
CHANGE ORDER NO. 1
Page 1 of 2
The aforementioned changes and work affected thereby, are subject to
all contract stipulations and convenants.
The Owner and the Contractor agree that there will not be an adjust-
ment to the time allowed for completion of the project for the above listed
changes.
IN WITNESS THEREOF, the Owner and the Contractor have hereto set their
hand this the 11th day of April , 1985.
---------------------------------------------------------------------------
RECOMMENDED: PARKHILL, SMITH & COOPER, INC., Consulting Engineers
By Proj. Engineer, ,1985
APPROVED: HEAVY HIGHWAY CONSTRUCTORS, INC., Contractor
B 9 , ,1985
APPROVED: CITY OF LUBBOCK, TEXAS, Owner
ATTEST:
, Mayor
ty Secretary
IN
CHANGE ORDER NO. 1
Page 2 of 2
Resolution #1987
CHANGE ORDER NO. 1
Quirt Avenue Overpass
CDWO 38409
GWO 11684
Lubbock, Texas
March 27, 1985
To: HEAVY HIGHWAY CONSTRUCTORS, INC.
P.O. Box 1488
Amarillo, Texas 79105
General description of work included in original contract:
Improvements to Quirt Avenue from 31st Street to 37th Street including
the construction of a nine -span, 972'-6" prestressed concrete overpass
structure, retaining walls, concrete approach pavement, flexible at grade
approach pavement and frontage roads, water and sanitary sewer utility
modification and construction, storm drainage adjustments, and related
items of work.
Original Amount of Contract. $2,886,434.50
Change Order No. 1 . . . . 0 12,018.45
Adjusted Contract Amount. $2,898,452.95
Adjustment in Construction Time None
WHEREAS, it is desirable to make changes in the work to be constructed
under this project.
THIS AGREEMENT WITNESSETH: In consideration of the mutual advantage
gained, the Owner and the Contractor agree to the changes indicated below
and further agree that the amount of the contract shall be adjusted by the
amounts shown above.
1. Modify the west drilled shaft at Bent No. 4
to allow the existing 10" and 27" water lines
to be straddled by two 42" diameter shafts
capped with a beam to support the column above
as detailed on the drawing prepared by Henningson,
Durham & Richardson, Inc. attached to the
March 26, 1985 letter from Parkhill, Smith &
Cooper, Inc. to Heavy Highway Constructors, Inc.
Add . . . . . . . . . . $ 12,018.45
CHANGE ORDER NO. 1
Page 1 of 2
The aforementioned changes and work affected thereby, are subject to
all contract stipulations and convenants.
The Owner and the Contractor agree that there will not be an adjust-
ment to the time allowed for completion of the project for the above listed
changes.
IN WITNESS THEREOF, the Owner and the Contractor have hereto set their
hand this the 11th day of April , 1985.
----------.----------------------------------------------------------------
RECOMMENDED: PARKHILL, SMITH & COOPER, INC., Consulting Engineers
B �G&Arz,-Prof . Engineer, // ,1985
APPROVED: HEAVY HIGHWAY CON RUCTORS, INC., Contractor
B �` wZfJ' d -// 1985
Y I� >
APPROVED:
ATTEST:
CITY OF LUBBOW, TEXAS, Owner.
CHANGE ORDER NO. 1
Page 2 of 2
, ,1985