HomeMy WebLinkAboutResolution - 1980 - Accept Paving Improvements - Kerr Construction - Lots 1-70, Brookmeade Addition - 03/21/1985LDS:clk
RF.gnT.TTTT0W
Resolution #1980
Agenda Item #24
March 21, 1985
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND AVENUES
AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement�provisions of
City Ordinance 1331, the subdivider of Brookmeade Addition, Lots 1-70 made
arrangements with Kerr Construction Company for the construction of paving
improvements on certain streets dedicated in said subdivision under the pro-
visions of said Ordinance prior to the recording of the subdivision plat of
the above mentioned addition including the following streets:
Hyden Avenue from its intersection with the south raw edge of
4th'.Street to its intersection with a line 15.00 feet northwest
of southeast property line of Lot 54 known and designated as New
Subdivision Sub -Unit Number 99 of Unit Number 2030.
Hyden Avenue from its intersection with a line 7.00 feet north-
east of northeast property line of alley northeast of 9th Drive
to its intersection with the southwest lip line of 8th Drive known
and designated as New Subdivision Sub -Unit Number 00 of Unit Number
2031.
Huron Avenue from its intersection with the northeast lip line of
8th Drive to the cul-de-sac south of 4th Street known and designated
as New Subdivision Sub -Unit Number 01 of Unit Number 2031.
8th Drive from its intersection with the northwest lip line of Iola
Drive to its intersection with a line 15.00 feet northwest of the
southeast property line of 'Lot 54 known and designated as New Sub-
division Sub -Unit Number 02 of Unit Number 2031.
Iola Drive from Its intersection with a line 10.00 feet northeast
of northeast property line of alley northeast of 9th Drive to its
intersection with a line 10.00 feet northeast of northeast property
line of alley northeast of 8th Drive known and designated as New
Subdivision Sub -Unit Number 03 of Unit Number 2031.
AND WHEREAS, the construction of the above :improvements on the above
mentioned streets was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in
accordance with the provisions of City Ordinance 1331.
THEREFORE,`RE'IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the above mentioned streets
be and the same are hereby accepted and the City Engineer be and he is here-
by authorized to notify the Developer of acceptance by the Lubbock City
Council.
II.
This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 21ST DAY OF MARCH. 1985.
ATTEST:
Ranette Boyd, City Secr
APPROVED AS TO CONTENT:
Don J nings City Engineer
APPROVED AS TO FORM:
A, �- C -71 &.-"
'
n Ross Jr., CityAttorney
CONSOLIDATED FINAL ESTIMATE
BROOKMEADE ADDITION
LOTS 1-70
Accepted March 21, 1985
UANTITIES
Resolution #1980
Unit &
Sub -Unit
Location
S.Y.
Paving
6" Base
S.Y.
L.F. Alley
C & G Return
S.Y.
Valley
Gutter
2030-99
Hyden Avenue from S. raw
52.54
2031-02 8th Dr. from NW LL of Iola
S.Y. Alley Return & Dr. Ch.
@$22.10
edge of 4th Street to 15'
Dr. to 15'NW of SE PL of
S.Y. WAllepy 'Gatter
@$22.20
$ 4,279.72
NW of SE PL of Lot 54
1919.98
934.91
52.54
2031-00
Hyden Ave. from 7'NE of
PL of alley NE of 9th Dr.
NE PL. of alley NE of 9th
to 10' NE of NE PL of
Dr. to SW LL of 8th Dr.
394.67
254.54
52.54
2031-01 Huron Ave. from NE LL of
8th Dr. to cul-de-sac S
S.Y. Paving 6" Base
@$6.64
$59,670.23
of 4th St..
2313.08
1229.54 55.18
52.54
2031-02 8th Dr. from NW LL of Iola
S.Y. Alley Return & Dr. Ch.
@$22.10
$ 1,665.90
Dr. to 15'NW of SE PL of
S.Y. WAllepy 'Gatter
@$22.20
$ 4,279.72
Lot 54
3210.70
1668.56
52.54
2031-03 Iola Dr. from 10'NE of NE
PL of alley NE of 9th Dr.
to 10' NE of NE PL of
alley NE of 8th Dr.
1148.05
492.96 20.20
35.16
TOTAL QUANTITIES
8986.48
4580.51 75.38
192.78
COST ESTIMATE
8986.48
S.Y. Paving 6" Base
@$6.64
$59,670.23
4580.51
L.F. Curb & Gutter
@$5.85
$26,795.98
75.38
S.Y. Alley Return & Dr. Ch.
@$22.10
$ 1,665.90
193.78
S.Y. WAllepy 'Gatter
@$22.20
$ 4,279.72
CONTRACT
COST
$92,411.83
COST DISTRIBUTION
Unit &
Contract
Developer
Sub -Unit
Cost
Cost
2030-99
$18,217.88
$18,217.88
2031-00
$ 5,276.06
$ 5,276.06
2031-01
$24,937.53
$24,937.53
2031-02
$32,246.52
$32,24.6.52
2031-03
$11,733.83
$11,733.83
TOTAL
$92,411.83