JS:ck July 25, 1985
Agenda Item #15
RESOLUTION
RESOLUTION ACCEPTING PAVING IMPROVEMENTS ON A PORTION OF A CITY STREET
AS DESCRIBED BELOW:
WHEREAS, the City of Lubbock awarded a contract May 24th, 1984 author-
izing the construction of street maintenance improvements by Vowell Con-
struction Company, Inc., on a portion of the following:
2nd Maintenance Program 1984 (Contract "A")
AND WHEREAS, the improvements upon the said portion of City street has
been inspected and found to have been constructed according to the approved
plans and specifications.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
That the improvements on said portion of the City street be, and the
same are hereby accepted and the City Engineer be and he is hereby authorized
to direct the final payment to the Contractor in the amount of $36,933.65,
II.
This resolution shall take effect and be in force after is passage.
PASSED AND APPROVED THIS 25TH DAY OF JULY,,,1198
nette-boya, ulty Secretary
APPROV AS TO'/NTNT:
,1-10-1
Larry Hoffq)0, Direc or
APPROVED AS TO FORM:
,Q,,L C_ '-/� -".'
74Z
gTarfin Ross Jr., City Attorney
an
nsportation
ry,
MONTHLY ESTIMATE
CITY O LUBBOCK
Project: 2nd Maintenance Program 1984 Project No.
Contractor: Vowell Construction Company, Inc. Estimate No.
Address: P.O. Box 253 Contract $
EI Paso, Texas 79743
Estimate Period From June 28 , 1985 to July 12 19 85
on First estimate and final estimate use actual work dates
Resolution #2085
Contract "A" -
6 & Final
765,160.00
ITEM UNIT OF PROJECT WORK DONE CONTRACT
MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT
1. Asphalt
(AC -5 polymerized
asphalt
+3% rubber) application
of 0.25
allon r course
it to the existing surface in-
cludin
furnishing, cleaning a d
applying
per gallon. als. 85,000 86.590
1.35
2 -Asphalt
AC -5 pol=erized
alt 4-3%
rubber application
of 0.35
gallons per square vara
for course #2 a'. lied to exist"n
surface
including furnishing
cleaning and applying, per
gallon;
gals. 119,000 111,630
1.35
3. Asnhalt
(AC -5 nolz=me-ri..z-ed__�sDh
alt +3% rubber) application of I
0.28 gallons per square vard
(pre -coated grade No. 4 crushe
stone or gravel seal coat)
applied to existing surface
including cleaning, furnishing
and anplvin5z. per ;Tallon; izals. 1 1.000 1.35
MONTHLY ESTIMATE
CITY OF LUBBOCK
Project: 2nd Maintenance Program 1984 _ ._ ._. Project No. Contract "A"
Contractor: Vowell Construction Company, Inc. Estimate No. 6 & Final
Address: P. 0. Box 253 Contract $ 765 160.00
F1 Paco, Texas 79743
Estimate Period From June 28 '1985 to July 12 1985
on First estimate and final estimate use actual work dates
ITEM UNIT OF
MEASURE
PROJECT WORK DONE CONTRACT
EST. QUANTITIES ON CONTRACT PRICE AMOUNT
4. Seal Coat (THD Grade No. 4
washed gravel) including spread-
ing, brooming, blading and
rolling(One hour per 1000
square yards) per cubic yard.
.
5. Surface aggregate (THD P.B.
Grade No. 4 precoated crushed
gravel, witha minimum of 85%
crushed faces, pre -coated
higginbotham, Eastland -Brown -
wood, Wescott, or Thrasher;
.crushed stone meeting sliver
count and soundness test)
including ioading, freight,
unloading, sprea ing, rooming
ttad.lng and ro ing one hour
per 1000 squareyards) per
1767.0
22,49----
cubic yard. C.Y.
3,870474
1.,81450_
_
3,870 3886.12
19.46 75,623-90
-2119.12 1
19.46 -(41,238.08)
6 Surface
Grade N
r h ,e
of 85% crushed faces -
coated Higginbotham. Eastland
Brownwood or Westcott crushed
stone meeting sliver count and
soundness test) including load-
ing, freight unloading, spread ng,
tV6®NTHLY ESTIMATE
CITY OF LUBBOCK
Project:
2nd Maintenance Program 1984
Project No.
Contract "A"
Contractor:
Vowell
Construction Company Inc.
Estimate No.
6 & Final
5,675
2149.50
Address:
P, 0. Box
253
Contract $
765,160.00
390.53
El Paso,
Texas 79743
Extra Grade #2 sperial
Estimate Period
From
June 28 19-L�- to _ July 12
19 s
On First estimate and final estimate use actual work dates
ITEM
UNIT OF PROJECT
I
WORK DONE CONTRACT
pleted, including loading.
MEASURE EST. QUANTITIES
ON CONTRACT
PRICE AMOUNT
brooming, blading and rolling
(one hour per 1000 square yard3)
2748
23-04 Al 313 Q2
per cubic yard; C.Y.
5,675
2149.50
43.50 93,Snl 95
5,675
3138.53
20.46 64. 14-12
390.53
20.46 - 7,990,24)
Extra Grade #2 sperial
pre—
in stockpile aft - two -
course asphalt com—
pleted, including loading.
hauling to the City of Lubbock
storage lot at Municipal Hill
complete per cubic yard delive ed
at city's stockpile; C.Y.
500
.581.00
33,00 19,17-1 00
. Patching with Black Base at
Engineer's option) including
removal and disposal of asphalt
surface, caliche base, and subr
grade if soft or unstable to a
depth of 7-1/2" and replacing
with 6 inches of black base
and' 1-1/2" of Type C Hot
Mix complete in place per
square yard; S.Y.
2,000
3734.82
13.5050,420-07
L
.MONTHLY ESTIMATE
CITY OF* LUBBOCK
Proiect: 2nd Maintenance Program 1984
Contractor: VnwP1 l Con ctrur t i nn ComDanv, Tnc
Address: P. 0. Box 253
El Paso. Texas 79743
Project No. Contract "A"
Estimate No. 6 & Final
Contract $ 765,160.00
Estimate Period From June 28 , 193 -5 --to July 12 19$5
On First estimate and final estimate use actual work dates
ITEM
UNIT OF PROJECT WORK DONE CONTRACT
MEASURE EST. QUANTITIES ON CONTRACT PRICE
AMOUNT
9. Patchin5z with 3 sack
stabilized caliche base a
Engineer's option) includin
removal and disposal of as hal
surface, caliche base and sub—
grade if soft or unstable to a
depth of 7-1/2" and replacing
with inches of 3 sack cemen
stabilized caliche and 1-1/2"
of Type "Cit hot—mix complete
in place per cubic yard of sta
ilized base.
S.Y. 2,000
109.34 15.50
$ 1,694.77
10. Three (3) sack cement stabilized
caliche base to be used in
backfill of subgrade that cannot
be stabilized with base material
at locations designated and
approved by the Engineer
ce7p!ete in place, per cubic
yard,'-
C.Y. 100
35.00
I
i
APPROVED:
For En—'s Ofnre
Total Amount of Work Done .......
Less 5 °ib Retained .............
Difference ...................
Less Special Deduction ...........
Less Liquidated Damage .........
Less Previous Payments.. _ ........
Amount Due this Estimate.........
6873,886.04
S
S 687,886.04
S
S 11 , 5(1(1_(1(1
S 639.452.39
$ 36,933.65
Calculations by:
Engine r cote
Checked h
Dept. He Date
iff
66
Director Date
Resolution #2086
2nd Maintenance Program 1984 -
Contract "A"
Streets Seal Coated
Street
From
To
50th St. Access Rd.
W. of Knowville Avenue
W. of Orlando Avenue
Elm Avenue
50th Street
66th Street
Globe Avenue
40th Street
50th Street
E. 40th St.
Avenue "A"
Locust Avenue
E. 42nd St.
Avenue "A"
Locust Avenue
E. 44th St.
Avenue "A"
Locust Avenue
E. 46th St.
Globe Avenue
Locust Avenue
Elgin Avenue
50th St.
66th St.
58th St.
Quaker Avenue
Peoria Avenue
58th St.
University Avenue
Indiana Avenue
58th St.
Memphis Avenue
Nashville Avenue
52nd St.
Boston Avenue
University Avenue
Utica Avenue
52nd Street
54th Street
66th Street
Canton Avenue
620' W. of Elgin
66th Street
Avenue "U"
Avenue "W"
E. 66th Street
Slaton Road
Quirt Avenue
Boston Avenue
50th Street
64th Street
Avenue "G"
19th Street
22nd Street
23rd Street
Avenue "A"
Avenue "F"
Quirt Avenue
36th Street
50th Street
E. 44th Street
Quirt Avenue
W. to RR Track
E. 38th Street
Quirt Avenue
165' W. of Quirt Avenue
N. Gary Avenue
Clovis Road
Oberlin Street
Magnolia Avenue
E. 66th Street
N. to RR Track
Ivory Avenue
E. 66th Street
N. to RR Track
Globe Avenue
E. 66th Street
Slaton Road
E. 56th Street
Elm Avenue
W. to end of street
Page 2
2nd Maintenance Program 1984 - Streets Seal Coated
Contract "A"
Street
E. 64th Street
E. 50th Street
Avenue "L"
Utica Avenue
From
Elm Avenue
100' W. of Avenue "H"
29th Street
36th Street
To
E. to end of street
Avenue "N"
320' S. of 29th Street
36th Street
MONTHLY ESTIMATE
CITY OF LUBBOCK
Project: Paving Improvements on Quaker Ave. from 82nd St. to 98th St.Project No. GWO 831002
Contractor: Vowell Construction Company, Inc. Estimate No.Final Payment
Address: P.O.Box 253 Contract$ 1,116,006.80
El Paso, Texas 79943 Chg.Ord. #1 267,330.00
TOTAL $ 1,383,336.80
Estimate Period From April 23 , 1984 to April 30 '1985
On First estimate and final estimate use actual work dates
ITEM UNIT OF PROJECT WORK DONE CONTRACT
MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT
1.1 1/2"compacted THD Type "C"
For Fn is Office
Total Amount of Work Done ....... $
Less 5 % Retained ........ $
Difference .... $
Less Special Deduction ........... $
Less Liquidated Damage ......... $
Less Previous Payments ............ $
Amount Due this Estimate......... $
1,336,939.62
1,315,357.29
71, 582.33
Calculati ns by:
asphaltic concrete paving
Ch 'ked h :
pt. ead Date
L
lirect r Date
9 Black Base
S.Y.
50,145
50,691.45
$18.50
937,791.83
2.6 thick reinforced concrete
paving
S.Y.
4,216
4,215.79
38.50
162
307.92
3.Curb & Gutter
L.F.
8,353
.Alley returns & drainage slab
S.Y.
468
254.19
19.75
5,020.25
5.Valley Gutters
S.Y.
214
134.90
22.00
2,967.80
6.42"I.D. Class II Conc. Pipe
L.F.
400
400
90.00
36
,000.00
7-T.H.D. CH -11 Type B Concrete
Headwalls
Lump Sum
2
2.800
2,800.00
8 -Compacted Earth Embankment
C.Y.
96,574
93,374
1.95
182,079.30
9.Stabilized caliche base in
backfill
C.Y.
50
185
35.00
6.475.00
10.Re-surfacing,removal &
disposal of existing asphalt
surface S.Y. 100 100 4.00 400.00
ll.Rip Rap S.Y. 180 2_976.20
APPR ED:
For Fn is Office
Total Amount of Work Done ....... $
Less 5 % Retained ........ $
Difference .... $
Less Special Deduction ........... $
Less Liquidated Damage ......... $
Less Previous Payments ............ $
Amount Due this Estimate......... $
1,336,939.62
1,315,357.29
71, 582.33
Calculati ns by:
.n r Date
,!
Ch 'ked h :
pt. ead Date
L
lirect r Date
GWO 831002
ACCEPTED: July 25, 1985
COST DISTRIBUTION
Unit & Contract Assessed City Prepaid Paving
Sub -Unit Cost Property Cost For
Owner s Quaker Avenue
Cost
2240-47 $1,386,939.62 $129,807.53 $1,064,512.75 $192,619.34
TOTAL CONTRACT COSTS $ 1,386,939.62
LESS PREVIOUS PAYMENTS $ 1,315,357.29
FINAL AMOUNT DUE
CONTRACTOR $ 71,582.33
fdIONTHLY ESTIMATE
CITY OF' LUBBOCK
Project: 2nd Ma i nt nar, _'Program 1984 Project No. Contract "TO'
Contractor: Vowell Construction Company, Inc Estimate No. 9th and Final
Address: P. 0. Box 254 Contract $ 852, 734.00
El Paso Texas 79743
Estimate Period From May 31 t985 to June 30 19 85
on First estimate and finsi estimate use actual work dates
ITEM
UNIT OF PROJECT WORK DONE CONTRACT
MEASURE EST. QUANTITIES ON CONTRACT PRICE
AMOUNT
1. 1 1/2" cam acted THD type "C"
Asphaltic concrete paving with
crushed stone or crushed grav
l
- (gravel with a minimum of 85%
crushed faces), including
scarifying, pulverizing the
asphalt surface, removal and
hauling the existing surface
_
and ca icne base to the City
o; LuobocR storage iot at
Municipal ill, re wor !ng
6(six) inches of the existing
subgrade, 9(nine) inches of
asphalt stabilized graded
gravel base, prime, tack coat
and a :L diluted emulsion
at the rate of .10 gallon per
square and of surface com-
=plete in place per square yard
S.Y.1 25,277 25,471.38 22,00
$560,370.36
2. 1 1/2" compacted THD Tv "C",
as haltic concrete paving with
crushed stone or crushed gray.al
(with a minimum of 85% crushe
faces) including scarifying,
pulverizing the asphalt surfa
e
removal and reworking the sub
rade to a depth of 6", inclu-
ding re -processing the exist-
ing caliche base, correcting
soft of unstable sub -grade,
prime and tack coat an
APPROVED:
For Frrr's gff,ce
Total Amount of Work Done . .. . .. .
Less 5 % Retained .............
Difference . . . . . . . . . . . . . . . . . . .
Less Special Deduction ...........
Less Liquidated Dainage .........
Less Previous Payments ...........
Amount Due this Estimate.........
S
S
$
S
S
Calcuiations by:
Engineer Date
onecked tr ;
Dept. Head Date
____ _
Director Date
MONTHLY ESTIMATE
CITY OF LUBBOCK
Project: 2nd Maintenance Program 1984 Project No. Contract "B"
Contractor: Vowell Construction Company, Inc. Estimate No. 9th and Final
Address: P, n. Box 253 Contract $ 852, 734.00
El Paso, Texas 79743
Estimate Period From May 31 19 85 to June 30 '1985
On First estimate and final estimate use actual work dates
ITEM UNIT OF PROJECT WORK DONE I CONTRACT
MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT
dilute emulsion at the rate o
.10 gallon Der square yard
of surface complete in vlacel
per square yard of surface
complete in place per square
yard. S.Y. 33,600 25,630.21 7.40 55
3. 1 1/2" compacted THD type 1FC11
asphaltic concrete paving
re—surface with crushed stone
or crushed gravel, (with a
minimum of 85% crushed faces)
including prime and tack coat
and a 1:2 dilute emulsion at
the rate o gallon per
square yard. 135.29 974 92
4-Cil—'h Pnd Rutter„
and gutter or 30” wide se ara e
utter, including removal
haul and disposal of existing
curb and gutter, sub—grade
preparation, complete in plac
per linear foot; L.F. 1,000 150.6 8.00 $1204.80
APPROVED:
-
I For Engr's Office
Total Amount of Work Done ....... S
Less 5 % Retained ............. S
Difference ................... S
Less Special Deduction ........... S
Less Liquidated Damage ......... $
Less Previous Payrnents ........... $
Amount Due this Estimate......... $
Calculations by:
Engineer Date
Checked by:
Dept. Head Date
Director Date
MONTHLY ESTIMATE
CITY OF LUBBOCK
Project: ZPld—Y,,e'iJ_P. B- .2a.G2 prr}8r2= 1586 Project No. Contract "R"
Contractor: Vowell Construction Company, Inc. Estimate No. 9th and Final
Address: P. 0, RDx 253 Contract$ 852,734.00
>l Paso, Texas 79743
Estimate Period From May 31 10. 85 to June 30 19 85
on First estimate and final estimate use actual work dates
ITEM UNIT OF PROJECT WORK DONE CONTRACT
MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT
5. Valley Gutters: Reinforced
concrete (3000 #/7 day high:
early type cement valley
gutters including removal hau
and disposalof existing vallay
utters sub -grade preparatio
complete in place per square
vard. S.Y. 250 92.36 23.00 $2,124.28
day high early) median 6"
thickness including removal
haul and disposal of existin
median sub -grade preparation
complete in place per square
.yard. S.Y. 500 24.00
7. Three 3 sack cement stabilized
caliche base to be used in
backfill of sub rade that can-
not be stabilized with base
material at locations design ted
and approved by the Engineer
complete in place, per cubic
yard; C.Y. 100 52.5 35.00 1837.50
APPROVED: For Fng,'s Office Total Amount of Work Dore ....... W
Caicuiations by:
Less 5 % Retained ............. S
Engineer Date
Difference ...................
Less Special Deduction ........... S
C'heCked by:
Dept. Head Date Less Liquidated Damage ......... S
Less Previous Payments . _ ......... S
Director Date Amount Due this Estimate......... $
1"W'11ONTHLY ESTIMATE
CITY OF� LUBBOCK
Project:
2nd Maintenance Program 1984
Project No.
Contract "B"
UNIT OF
MEASURE
PROJECT WORK DONE CONTRACT
EST. QUANTITIES ON CONTRACT PRICE AMOUNT
Contractor:
Vowel]—Construction Company Inc
Estimate No.
9th and Final
Address:
P. 0. Box 253
Contract $
852,734.00
F1 Paso,
Estimate Period From
Texas 79743
May 31 , 19 85 to June 30 '19 85
On First estimate and final estimate use actual work dates
ITEM
UNIT OF
MEASURE
PROJECT WORK DONE CONTRACT
EST. QUANTITIES ON CONTRACT PRICE AMOUNT
8 Additional caliche
used with Item
#2 at the Engi.,-
neerys option,
includin ro-1
cessing, complete
in place e
cubicyard;
C.Y.
1,0-0-0- 6.00
APPROVED: For Fn res Office
Total Amount of Work Done ....... $ 755,775.47
Calculations by:
7_ _ Less 5 % Retained ............. $
Lginer Date
Difference ................... y
ZJW
Less Special Deduction ........... S
Checked by:
Dept ead Ll Date Less Liquidated Damage ......... $
"-- Less Previous Payments ........... $ 729,984.05
Director _ Date Amount Due this Estimate......... $ 25,791 .42
2nd Maintenance Program 1934
List of Streets
Reconstruction with Hot Mix and 6" Caliche and Hot Mix Surface
Street
Width
From
To
Length
Width
Area
Utica Ave.
SLL
of 34th St.
NPL of 36th St.
620'
32'
2204
Peoria Ave.
SLL
of 18th St.
N Paving Line of 19th St.
410'
32'
1458
66th St.
328'
W of University
WPL of Canton Ave.
1078'
44'
5270
Utica Ave.
SLL
of 50th St.
NPL of 52nd St.
610'
38'
2576
N. Gary Ave.
NPL
of Oberlin St.
SLL of Loop 289
(Access Road)
1134'
48'
6048
Ave. W
NLL
27th St.
SLL of 26th St.
326'
26'
942
6th St.
WPL
of Boston
S. Paving Line of
9511
Tech Freeway
Reconstruction with 9" Black Base and Hot Mix Surface
Street From
Utica Ave. NPL of 56th St.
Quaker Ave. SLL of 50th St.
University New Paving Line
S. of 66th
66th St. WLL of University
To
NLL 58th St.
SPL of 51st St.
Loop 289 R.O.W.
S. of 70th
328' W. of WLL of
University
Length
Width
Area
680'
38'
2871
360'
68'
2720
1204'
86'
12,079
328' 44-70' 1538