Resolution - 2009 - CO#3 To Contract - Lee Lewis - Terminal Expansion, LIA - 04/25/1985
HW:cl Resolution #2009 April 25, 1985 - Agenda Item #30 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 3 to a contract previously entered into by and between said City and Lee Lewis Contractor for expansion of the Lubbock International Airport Terminal, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 25th day of April , 1985. ATTEST: , clty APPROVED AS TO CONTENT: Mar in Coffee, Dirgtt6r of A-vviation APPROVED AS TO FORM: arold Willard, Assistant City Attorney I^ CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ FIELD ❑ OTHER ❑ Resolution #2009 PROJECT: Lubbock International Airport CHANGE ORDER NUMBER: Three (3) (name, address) Terminal Building -Phase II Lubbock, Texas INITIATION DATE: April 15, 1985 TO (Contractor) : r— ARCHITECT'S PROJECT NO: 82-07-01 Lee Lewis General Contractor CONTRACT FOR: General Construction 2521 -74th Street Lubbock, Texas 79423 L CONTRACT DATE: June 14, 1984 You are directed to make the following changes in this Contract: Increase the contract sum to compensate for additional pier drilling and concrete work resulting from subsurface soil conditions. $39,297.00* *Note: This amount shall be deducted from the contract contingency allowance. The balance of the contingency allowance following this change order is: Original Contingency Allowance $410,000.00 Less Previous Change Orders - 25,783.00 10^1 Less this Change Order 39,297.00 Contingency Allowance Balance $344,920.00 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (G0dxatXK0tkMXirxXX)00x1*was ........................... $ 6,976,775.00 Net change by previously authorized Change Orders ................................... $ 25,783.00 The (Contract Sum) prior to this Change Order was .......... $ 6,976,775.00 The (Contract Sum) will be (ilg)7C9P (unchanged) by this Change Order......................................................... $ The new (Contract Sum) including this Change Order will be ... $ 6,976,775.00 The Contract Time will be (increased) (*)CXMq�*x R0)WZr,* by Twenty-one ( 21 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is May 31, 1986 Authorized: Whitaker McQueen Jones & Assoc. Lee Lewis General Contractor City of Lubbock, Texas LuOck, Texas T n R OCUT ock, Texas Address Address Address BY TE ri111M,_�EdDATE April 16,DATE 1985 lan Hen y, M A OCUMEN 1.701 CHANGE ORDER APRIL 1978 EDITION I AIA® • © 1978 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 G701 —1978 43 P.O. BOX 65197 • 2521 74TH STREET • LUBBOCK, TEXAS 79464 • SM/745-9705 WHITAKER McQUEEN JONES & ASSOCIATES March 27, 1985 ARCHITECTS Mr. Lee Lewis Lee Lewis General Contractor 2521 -74th Street Lubbock, Texds 79423 Re: Lubbock International Airport Dear Lee: I have concluded my review of your change order request dated February 12, 1985, (drilled pier overages). A random check of quantity take -offs which you submitted revealed a shortage in your estimate of approximately 20 cubic yards. In addition, five (5) of the concrete tickets submitted were for deliveries on days when there were no piers poured. This was determined by cross checking the testing laboratory reports. The quantity totaled twenty-nine (29) yards. I am therefore adjusting your request as follows: Concrete 370.25 cy @ 58.00/cy $21,474.50 Labor 370.25 cy 0 8.60/cy 3,184.15 28% Labor tax 891.56 Excess drilling 10 175.00 5,725.21 10% O.H. and profit 3,572.52 $39,297.73 Please contact me if you have questions. Sincerely, I WHITAKER MCQUEEN JONES & ASSOCIATES 2517 - 74TH STREET LUBBOCK, TEXAS 79423 906 745-5485 •J WHITAKER McQUEEN JONES & ASSOCIATES March 27, 1985 ARCHITECTS Mr. Lee Lewis Lee Lewis General Contractor 2521 -74th Street Lubbock, Texds 79423 Re: Lubbock International Airport Dear Lee: I have concluded my review of your change order request dated February 12, 1985, (drilled pier overages). A random check of quantity take -offs which you submitted revealed a shortage in your estimate of approximately 20 cubic yards. In addition, five (5) of the concrete tickets submitted were for deliveries on days when there were no piers poured. This was determined by cross checking the testing laboratory reports. The quantity totaled twenty-nine (29) yards. I am therefore adjusting your request as follows: Concrete 370.25 cy @ 58.00/cy $21,474.50 Labor 370.25 cy 0 8.60/cy 3,184.15 28% Labor tax 891.56 Excess drilling 10 175.00 5,725.21 10% O.H. and profit 3,572.52 $39,297.73 Please contact me if you have questions. Sincerely, I WHITAKER MCQUEEN JONES & ASSOCIATES 2517 - 74TH STREET LUBBOCK, TEXAS 79423 906 745-5485