Loading...
HomeMy WebLinkAboutResolution - 2239 - Accept Paving Improvements - Kerr Constuction - 1984 Warehouse & Parking Lot - 02/13/1986Resolution #2239 February 13, 1986 Agenda Item #20 RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS, AND/OR AVENUES AS LISTED BELOW: WHEREAS, the City of Lubbock heretofore entered into contract with Kerr Construction Company for the making of paving improvements in said City includ- ing among others the following: South Service Center City Warehouse New City Hall Parking Lots Traffic Signal & Maintenance Shop Area Paving Adjacent to old Sanitation Office Strip Paving from Traffic Signal Shop to Ash Ave. Coliseum Parking Lot East Half of Elmwood Avenue from 19th St. to 512 feet south Entrance to City Cemetary at 31st and Teak Avenue AND WHEREAS, the construction of the above improvements were performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accord- ance with terms of said contract, GWO 921501. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements above mentionedbe, and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the final pay- ment to the contractor in the amount of $935.89. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 13th DAY OF FEBRUARY, Alan He ry, Mayor T: e Boyd, City Secretary APPROVED AS TOrN N f - arry ffman, City ngineer APPROVED AS TO FORM: Jdj:I1 C Ross, City Attorney Resolution #2239 MONTHLY ESTIMATE CITY OF LUBBOCK Project: 1984 Warehouse & Parking Lot Paving Project No. GWO 921501 Contractor: Kerr Construction Co. Estimate No. 16 & FINAL Address: P. 0. Box 888 Contract $ 483, 282.75 Lubbock, Texas 79408 Estimate Period From February 1 , 19 86 to February 13 , 19 86 on First estimate and final estimate use actual work dates ITEM UNIT OF PROJECT WORK MEASURE EST. QUANTITIES ON CONTRACT ACT ONE CONTRACT AMOUNT CEMETERY ENTRANCE 1. Paving with 1-1/2" T e licit S.Y. 1,354 1,453.97 1 8 6.70 A.C. on 6" caliche base 4. Curb and Gutter L.F. 906 906 6,75 $6,115.50 6. C&G removal L.F. 86 6.50 7. Alley & driveway returns S.Y. 40.40 40.40 $22.00 888.80 9. Valley gutters S.Y. 52.54 61.43 $23.00 $1,412.89 APPROVED: /jam\ Q g For Fn res nrfiee Total Amount of Work Done ........ _18,717.79 Less 5 °'o Retained $ ---- Difference .... . .............. S 18,717.79 Less Special Deduction ........... $ Less Liquidated Damage ... $ Less Previous Pay m...... ents. $ 17,781.90 Amount Due this Estimate......... $ - ------ 935.89 Calculations bY �� �/ 7 �nyineer Date Checked h pepp He Dace 2 ,� nirocter ('Date GWO 921501 CONSOLIDATED FINAL COST LOCATION South Service Center City Warehouse City Hall Parking Lots Traffic Maintenance Shop Strip Paving from Traffic Shop to Ash Ave. Coliseum Parking Lot East 12 Elmwood Ave from 19th St. to 512' South New Cemetery Entrance at 31 st. and Teak Ave. TOTAL Resolution #2239 COST $ 95,252.67 $ 246,225.00 $ 68,656.22 $ 63,813.25 $ 22,080.93 $ 25,243.69 $ 12,816.29 $ 18,717.79 $ 552,805.84