Loading...
HomeMy WebLinkAboutResolution - 2291 - CO#1 To Contract - Caprock Highway Construction - Park Drainage - 04/09/1986Resolution #2291 April 9, 1986 Agenda Item #12 T2'P QOT TT T T OOT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 1 adding quantities to G.W.O. 011675 Park Drainage Channel Improvements to existing contract for drainage improvements between said City and Caprock Highway Construction Co., attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this ATTEST: 9th day of April 1986. Ranettt Boyd, City Secretary APPROVED AS TO CO TENT: \ c Larry V. fman, D' ctor of Transportation AS TO FORM: — d" V64 ��+Vwl J.;'+T rth Fullingim, Ass'stant City Attorney TO: Gentlemen: CHANGE ORDER NO. 1 TO G.W.O. 011675 PARK DRAINAGE CHANNEL IMPROVEMENTS Caprock Highway Construction Co. 5185 - 69th Street Lubbock, Texas 79424 WHEREAS, it is desirable to make changes in the plans this project, being namely the addition of the quantities the Special Conditions of the Contract documents, and; Resolution #2291 & specifications for as is specified in WHEREAS, the Contractor herein agrees to the following change: Original Contract Amount = $142,842.90 Increased By Change Order No. 1 = $27,170.50 Total Amount of Contract = $170,013.40 Completion date of this Change Order is December 5, 1986 THIS AGREEMENT WITNESSETH: In consideration of the mutual advantages gained, the Owner and the Contractor agree to the change shown herein and in the revised plans, the Owner agrees to pay the Contractor the amount of increase in cash. The Contractor agrees to proceed with construction and to adhere to applicable specifications, under the direction of the Engineer. Furthermore, the parties agree that the original contract between the Owner and the Contractor shall be modified to the extent herein indicated, including one (1) attachment. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this 9th day of April 1986. C hway Construction Co. eside t OF LUBBOCK (OWNER) ATT Ranette oyd, City Secretary RECOMMENDED Larry V offman,//rector of Transpo ation APP 0VED AS TO FORM: J �nC. Ross,Jr., City ttorney FOR APPROV LarrCtidiingham, CitM nager CHANGE ORDER NO. 1 G.W.O. 011675 Park Drainage Channel Improvements Location - Lake #19, #26, #31, #88 & #25 Original Contract Amount Estimated Quantities & Prices Added by this Change Order: (In Lake #25) Bid Item Number Description Resolution #2291 $142,842.90 1. 7660 S.F. Drainage Slab 4" R.C. (3000 #/7 Day) @ $1.89 = $14,477.40 2. 900 L.F. Drainage Channel 40' wide graded @ $3.60 = $3,240.00 3. 1000 C.Y. Unclassified Excavation C.Y. @ $2.50 = $2,500.00 4. 2010 S.F. Errosion Structure 4" R.C. (3000 #/7 Day) @ $1.79 = $3,597.90 5. 312 L.F. Curb and Gutter (12") @ $5.85 = $1,825.20 6. 600 S.F. Spillway Slab 6" R.C. @ $2.55 = $1,530.00 Sub -Total C.O. #1 - $27,170.50 NEW CONTRACT AMOUNT $170,013.40 TE /Fl AVE. 0 OD Q \� 4 r g v ZI 0