HomeMy WebLinkAboutResolution - 2303 - Contract - Panhandle Construction - Water System Improvements, Ave P - 04/24/1986HW: da RESOLUTION Resolution #2303 April 24, 1986 Agenda Item #29 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Contract with Panhandle Construction Company for water system improvements to the distribution main between 32nd Street and 98th Street on Avenue P, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute acid be a part of this Resolution as fully copied herein in detail. Passed by the City Council this ATTEST: anette Boyd, ui.ty Secretary APPROV ASZOENT: IA 46-Y'a'ds".'Purchasing Manager APPROVED AS TO FORM: 24th day of Harold Willard, Assistant City Attorney April B. C. McMINN, MAYOR , 1986. CONTRACT STATE OF TEXAS COUNTY OF LUBBOCK THIS AGREEMENT, made and entered into this 24th day of A.D. 1986, by and between the City of Lubbock,y of Lubbock April Count Texas, acting by and through B. C. McMinn State of , Mayor, thereunto authorized to do so hereinafter referred to as OWNER, and Panhandle Construction Company P. 0. Box 1500 79408 of the City of Lubbock County of Lubbock and State of Texas , hereinafter termed CONTRACTOR. WITNESSETH: That for and in consideration of thePayments and hereinafter mentioned, to be made and performed by the OWNER and underatheements conditions expressed in the bond bearing even date herewith (if any) the CON- TRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements described as follows: Avenue "P" Distribution Main 82nd Street to 98th Street 22-9143-44532 and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own oper cost anexpense to all materials, supplies, machinery, equipment, tools, superintendence, labor,sh insurance and other accessories and services necessary to complete the said construction in accordance with the contract documents as Condition of Agreement. defined in the General The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been given to him and to substantially complete same within the time specified in the contract documents. The OWNER agrees to pay the CO:;TR.yCTOR in current funds for the mance of the contract in accordance with the proposal submitted therefor,or subject to additions and deductions, as provided in the contract documents and to make payment on account hereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement in the year and day first above written. ATTEST: City Secretary RANETTE BOYD ATTEST: _Z�r Secr- etary APPROVED AS TO FORM: .-APPROVED AS TO CONTENT: CITY OF LUBBOCK, TEXAS (OWNER) BY: A �_ B. C. McMinn Panhandle Construction Company 7CONM,kCTO ` ! / TITLE: eSider� COMPLETE ADDRESS: P. 0. Box 1500 Lubbock, Texas 79408 Change Order No. 1 Northwest Sanitary Sewer Relief Main 6th St. & Oak Ave. to lst St. & Ave. "K" 36-0001-14800-011595 To: Panhandle Construction Company P. 0. Box 1500 Lubbock, Texas 79408 Orginal Amount of Contract Less Net Amount this Change Order Amended Amount of Contract Original Completion Date Amended Completion Date $660,378.60 ( $11,101.55) $649,277.05 November 23, 1985 January 16, 1986 WHEREAS, it is desirable to make changes in the plans and specifications for this project; THIS AGREEMENT WITNESSETH: In consideration of the mutual advantages gained, the Owner and the Contractor agree to the change shown herein and in the attached exhibits and data and the Owner and the Contractor agree that the original contract between them shall be modified and amended to the extent herein indicated. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 30th day of April, 1986. PANHANDLE CONSTRUCTION COMPANY CITY OF LUBBOCK OWNER By By Bob Cass, De�uty:City Manager Attes Ranette Bo , City Secretary Recommended for Approval., P Wi or D.Watson, Chief Engineer Water Utilities Engineering Attachment to Change Order No. 1 Panhandle Construction Co. 36-0001-14800-011595 Explanation of Change Hauling sand from sanitary landfill to job site in Atzlan Park replacing undesir- able backfill for approximately 5 feet above top of pipe as needed, including hauling large pieces of concrete from job site to sanitary landfill. Breakdown of Change 663 yd3 of sand @ $4.00/yd3 = $2,652.00 663 yd3 of large concrete @ $12.00/yd = $7,956.00 Net amount due to extra hauling = $10,608.00 Cost of actual work included on proposal = $638,669.05 Actual cost of project = $649,277.05 Original amount of Contract = $660,378.60 Less actual cost of project = $649,277.05 Amount of Change = (-$11,101.55) Completion date this project November 23, 1985 Project was completed January 16, 1986 Amount of days past completion date = 54 days 10 days were recorded in fieldbook as work missed due to bad weather Construction in Atzlan Park was slowed considerably due to more large pieces of concrete than was anticipated. Progress in Atzlan Park slowed from an average of 75 feet per day to approximately 30 feet per day. Therefore, extra days con- sidered due to junk in park = 960 ft. = 21 days 75 ft. - 30 ft./day Work missed due to bad weather = 10 days Additional time due to junk in Atzlan = 21 days Holidays = 3 days Additional time requested due to the water table rising after rains = 20 days 54 days