Loading...
HomeMy WebLinkAboutResolution - 2475 - Accept Drainage Improvements- Lee Lewis General Contractor- Tract G KG Addition - 12/11/1986JWF:dw j-,4*WcM1iW • Resolution #2475 December 11, 1986 Item #16 RESOLUTION ACCEPTING DRAINAGE IMPROVEMENTS AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance No. 1331, the subdivider of King's Gate Addition, Tract "G" made arrangements with Lee Lewis General Contractor, Inc., for the construction of drainage improvements and Kerr Construction Company for the construction of paving improvements in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the above-mentioned addition including the following construction: 84th Street from its intersection with a line 13.00 feet east of the east property line of Quaker Avenue to its intersection with a line 16.00 feet west of the west property line of Orlando Avenue including drainage slab on north side of Tract "G" known and designated as New Subdivision Sub -Unit Number 73 of Unit Number 2031; and WHEREAS, the construction of the above improvements was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance No. 1331; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements be and the same are hereby accepted and the City Engineer be and he is hereby authorized to notify the developer of acceptance by the Lubbock City Council. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this 11th day of December , 1986. B. C. McMINN, MAYOR Boyd, City APP AS C AS FO i t Larry V. f , C' Engineer Fullingim, Assi t QUANTITIES Unit & Sub -Unit 2031-73 CONSOLIDATED FINAL ESTIMATE King's Gate Addition Tract "G" Accepted 12-11-86 S.Y. Paving S.Y. Drainage Location 6" Base L.F. C&G Channel 84th St, from 13' East of EPL of 3,966.14 1,880.16 922.45 Quaker Ave. to 16 ft. W of WPL of Orlando Avenue including drain- age slab on N. side of Tract "G" This work was constructed under two contracts: Kerr Construction - Paving & C&G Lee Lewis Construction - Drainage Channel COST ESTIMATE 3966.14 S.Y. Paving 6" Base @$6.65 $26,374.83 1880.16 L.F. Curb & Gutter @$5.90 $11,092.94 922.45 S.Y. Drainage Channel @Lump Sum $14,000.00 CONTRACT COST $51,467.77 COST DISTRIBUTION Unit & Contract Developer Sub -Unit Cost Cost 2031-73 $51,467.77 $51,467.77