Loading...
HomeMy WebLinkAboutResolution - 2466 - CO#17 To Contract - Lee Lewis General Contractor - Terminal Expansion, LIA - 11/13/1986MH: js RESOLUTION Resolution #2466 November 13, 1986 Agenda Item #17 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order #17 by and between the City of Lubbock and Lee Lewis General Contractor, Inc., on Terminal Expansion Contract, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Pas§ed-by the City Council this 13th day of November 1986. B. C. McMINN, MAYOR ATTEST: Ranettle—Boyd, City Secret APPROVED AS TO CONTENT: Marvin Coffee, Di A&tor of Aviation APPROVED AS TO FORM: d" Michele art, Asst. City Attorney W CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Lubbock International Airport (name, address) Terminal Building - Phase II Lubbock, Texas TO (Contractor): F Lee Lewis General Contractor 2521 - 74th Street Lubbock, Texas 79423 CHANGE ORDER NUMBER: Seventeen (17) INITIATION DATE: October 13, 1986 ARCHITECT'S PROJECT NO: 82-07-01 CONTRACT FOR: General Construction CONTRACT DATE: June 14, 1986 You are directed to make the following changes in this Contract: Incorporate into the work Items No. One (1) thru Fifteen (15) as indicated on the attached list for the additional sum of ... $ 36,489.00 APPROVED AS TO CONTENT: Maevin Coffee, orector of Aviation APPROVED AS TO FORM Michele fart; -Asst r Ci ty Attorney Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) ((XXa`TXXtXX(XX"H")V&X was ........................... $ 6,976,775.00 Net change by previously authorized Change Orders ................................... $ 38,370.00 The (Contract Sum) (UMWINX)MXiHMA) prior to this Change Order was .......... $ 7,015 ,145.00 The (Contract Sum) IX X*X(XeVX)0AXiXM)1PkX1X will be (increased) (VXXXXsX0X4p XNM0) by this Change Order......................................................... $ 36,489.00 The new (Contract Sum) XMX*X*AVX)XftXrXt&#�() including this Change Order will be ... $ 7,051 ,634.00 The Contract Time will be (jMj( NX0*XrXXs(AX(unchanged) by ( -0- ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is unchanged Authorized: Whitaker McQueen Jones & As -,or. Lee Lewis Genral fontractnr City of Itihhock ARCHITECT CONTRACTOR OWNER 5 11 Brownfield Rd 4 Suite 1f11 2521 - 74th Street Address Address BY E ! 14: ' AMAYOCUMENT`G70t--"'CHANGE ORDER APRIL 1978 EDITION AIA° © 1978 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 Address MIMSIB'FGlrM.� 0- - I -------- - DATE I!%7 G701 — 1978 Lubbock International Airport Terminal Building - Phase II Lubbock, Texas Items to be incorporated into the Work as Change Order No. Seventeen (17). 1. Revise General Aviation Entrance Area (Stair No. 5) as directed for the additional sum of ................................... ......$3,526.00 2. Add additional individual floor regi.sters in the Concession Area as directed for the additional sum of ............................ 648.00 3. Furnish and install Fire Alarm System in the Apron Level Maintenance Shop as required to incorporate with the Building Fire Alarm System ..................................................... 1,687.00 4. Revise gates and chain link fencing as directed at the Apron Level Security Fencing ................................................ 2,788.00 5. Furnish and install additional Ceramic Wall Tile and Patterned Floor Tile in Men's and Women's toilets as directed for the additional sum of ...................................................... 4,965.00 6. Provide electrical power to apron level overhead doors (two) asdirected........................................................... 718.00 7. Furnish and install additional power and _lighting in upper level meeting rooms ................................................... 897.00 8. Furnish and install additional HVAC items in upper level meeting rooms and in existing toilets as directed ..................... 455.00 9. Furnish and install additional electrical service to air handling unit no. six (6) as directed ................................. 1,071.00 10. Revise electrical wiring and fusing to new baggage claim devices asdirected........................................................... 618.00 11. Provide additional electrical service to HVAC chillers as directed.............................................................. 3,018.00 12. Furnish and install additionalHVAC items in upper level meeting roomsas directed .................................................... 1,802.00 13. Furnish and install additional electrical circuits and lighting in Rent Car areas as directed ............. ................ ........ 3,028.00 14. Remove plaster finish from twelve (12) existing columns and finish with new exposed aggregate finish as directed for the additional sum of ..................................................... 8,754.00 15. Furnish and install three section, glass panel sliding door at curved stair, upper level, as directed for the additional sum of ...::: 21514.00 TOTAL ADDITIONAL SUM THIS CHANGE ORDER '$36;489.00 IU66 Jones IcQu11 e 11 en , ,Tones field Hwy „ Suite 101 Yancey �_x......_, .� er your request., we offer the follovving revised proposal for work at 7 Stair #5. ;... -r ..-..._. .._ ......vim. ..-..__. _.: 1: lvIasonry foundation wall wilt to landing only. CMU t`o restgon existin g conn crete slab : (Demolition of foo existin slab and ng work omitted) $ 350.00 w ' ra' zazing on sand fi �. Concreteinterior landll. $ 100.00 �'•�}tet„". zr'.f^et-y,� ✓' x. rt ,.4 4 'xs*$..y..2#Fr',.4. 3 Exterior concrete landin Only."(No ramp, step' or handrail )NC , 3 t 4; Cut opening :in existing precast, panes for installa- T tion of new entry door. _ - $ 750.00 PT 5 Hollow metal door, frame and rie ed haxdware as w rz schedulecl on original proposal request $1,326.00 6 Painting of door and frame only $ 150 00 7 Revise securiginal proposal $� 390.00 _ax x $306600 l 3 15 o Overhead and Profit al.46.0 D:.Q $3,526.00 above proposal includes only items as specifically noted on this proposal. rworh originally `sche^duled (electrical, drywall,' structural, masonry wall �i as` rioted, and foundaiior work) has been omitted as directed. some material required for this, proposal (hollow metal door, frame and ware) will require three (3)- to four (4) weeks to receive. Trim s-'ecified it Yancey Jones .z... _ :...... .pril 16, 196 aye Kit crevice on the existing door at this entry will require approximately weeks to receive. - t r. ve any questions or wish us to proceed, please call. F RNM WHITAKER McQUEEN JONES & ASSOCIATES April 14, 1986 Lee Lewis General Contractors P.O. Box 65197 Lubbock, Texas 79464 Attention: Tom Ferguson Re: LIAX - Revised Entry @ Stair #5 Dear Tom: ARCHITECTS I have visited with the Owner regarding the referenced entry area. In the interest of economy, they have asked that I request a Re- vised Proposal to include only the following: 1. Construct an interior landing of concrete block foundation wall resting on the existing concrete floor. Top with 4" thick con- crete over sand fill. 2. Complete the exterior landing to serve both doors (no steps, handrails, or ramp). 3. Install door and hardware in existing concrete panel. Revise Hardware per Original Proposal. Paint door and frame. 4. Revise Security Fencing per Original Proposal. Please contact me if you have any questions. Sincerely, Yanc J s A.I. . YLJ:hr 2517 - 7.4TH STREET Ll'BBOCK, TEXAS 79423 806 745-5485 �; Q -AIN .x^.,r...,�....,,, — ,.k _ ancey Jones .erg McQueen, Jones Architects 3rownfield Highway, .Suite 101 ck, Texas 79407 > r 4ubbock International Airport 40 .100 OUR eancey, _ , t�zU.d . ," .,_.,tea`= �.. _a'..+s. is, n .�......«.. ed please find a copy of letter from Tech-Elec Company. We offer dowing proposals RO -ctrical Service to overhead doors added klectricaX625 00 Total 718.00 sing of Baggage Handling Equipment as requested H za EYecirica $ 538 15 o OH4P ti 80.- Total 618.06 nduct, wiring and fire alarm equipment in the apron level intenance shop 4 Rg + .t '¥ $-, Electrical -,46.00 q.m. _ r note concerns in Tech Elec's letter ding baggage handling fent I you hf�ve any questions please call. ruly sWIS GENEHAI, (�Oi`�T I'RAO T VR"��..A 1 guson �r a .,.'x,,.,..�.:T._ .,., ' z*ll&"`^, `st i` �' 1 f z. .✓ tr ,�.,a. 'ict i rra.,.m_.w* are, _ cones Queen and Jones eld T�wy Suite 101r._..z Xas ­fi V c International Airp�ori ition of Noor grilles as you directed at the -job site are 48" 56 r S &In 4nd dories Hwy. , Sulte X01 :_ _LUDDOCK internatlonal mrport tional main link tencing as clrectecd at the jobsite is I $6, 4Gb. UU (� -363._00 $2,788 00 i a change order ® '� K (/ uson nnr Yancey j ones W itaker, McQileen, and Jones 211 Pr Brownfield I wy. , Suite ( .6 7..,. ...?.-e. h"i>e,M•� `.X'kP:' ?3ce^e ......... ., ..... �.. .... ........ ..:c _,........,...�.. .... ..... .:__ .._ . ..............6 ..n ......u_ Lubbock, Texas 7940T 5µ , Lu bock Mernationa? Airport -----------T erminal expansion ' , � .. � �„ _,..... �. _. ._: �,. , . x.L _ rz-r��...✓�"�*✓ks�-fit_, ub�:. �^ ........»�..;.. ��.*.y�. ..,..,.b... ,.."+"".`. _., " M _ Bear Yancey Please accept the following as requesi for ­_-charige order ,for spec1aIT design �.. , ..... ..... _ .._.: border in ceramic the floors and for ceramic ti e walls and_ floors in Toilet :ra�.,a..z.�c-�#.».., -^�'.h �,-x �.,,.. zA;a; , .X .,.. ..r._ Rooms 139 ander _14-0 not sc�ieduled in Finish Scfie�ule ^Y .r.^ M'�""s '�^'s t r '�` f..x� �2.a zi s 4;,', �y z s ,,. `a ? '�' °r s a '147... ani Profit Tota1� $4,965.00 smsr -�2� 5. ..."+ae:...,. If you Piave any questions, please call Fours t uly, '�.�"''" ":..-,."i `''"�� -.�S" "`^� �4'*=� g� .� '�=h*�'-� � � ...�i,�,��.�'� €� ,. ren^ ..� y J �,.. �-ze � "✓` r r .d } tom erguson -:`E�ImI I Yancey Jones itaker, �'1VIc ueen; Jones 1rowrifield Hwy. , quite 101 bbock, 'i'"exas � 7590T 5.: c x,� fir^ rz �. �..� "�.,, p` s` .,, ..,.f _' w <s3, � ws. m�..,, �mb,r _-ubbQc Tntern4- ona, ,Airport year xancey: .a n.. a .�..; .. �.w... a x,..� Attached please find proposal of -Tech-E ec Company or���the acc�ition of a OA/3P swifch in n1�It�� rr �'"ech Elec Proposal 92 00� NM �� `- 15 o Over head%Pro fit $ fl �&Total $1,07100 ,`.` E. �M �e.a.�.x"'.,..„ .rp t'&; n you have any xquestions regarding this request, please call wx°r�y"a�'�... .1 '"''✓'�a; 'u t.o-v„�Eo:v`"r.s..i'...:'`,w:'"�,.7`,.z.:.—,�i.5rt 2',S »,rr+s x- ,�,��ours truly, r C ® Mt m` g �I om E Fer on MI s�,.,.,....,...f �T$F/rw v zxMr E7lf �C1gIIrP. ii, Jones "IW- ernationa�irport ind the proposal of Tedi-Elec Company for the work related fusing 'and`mwiring of the Chillers as outlined by -Fanning; ;w: �roposal $ 2, 625 'b0 . ieac/Profit t ...... ........3 3n._:'�.t�, .u`3s". �,d+':•_,...-`.��;.s�,e.,�`-,..,,>g„»�<3-:E.•x�.�.�._. questions regar� g%�.s proposal;.. please call. zcey Jones MdQue-6h Vand Jones ownf &I'd Hwy, Sulf- 10T K, bock Tnternationa Airport �ncey: lowing costs are related to the �Nork required at t$e second ea not shown on the plans and corresponds to previous request t ie elecirira co . r w .. u . w y ntractor. These``cost are as "submitted by the .cal contractor _ ro.__. . 4� °.,zz`x"`. :x:... ' Y,. 3'y �'"x''' `''�,,�•"' �r"'-z.*u "'Ii•,. ,' r..';..•$ rSechanical (see attac ed� $x,567 00� / itat'� $1 802 00 Lncue these'costs in chane order with t%e electrical items. I n Ferguson .r ..' Asa= 3�0 �As F/m....a s w ''`3s�= „I . losure Tech-Elec Company 5632 BROWNFIELD HIGHWAY LUBBOCK, TEXAS 79407 (806) 765-9292 November 29,1985 Lee Lewis General Contractor P.O. Box 65197 Lubbock, TX. 79464 Subject: Lubbock International Airport Terminal Building Expansion Phase II Attention: Tom Ferguson Gentlemen: We are requesting you to process a change order in the amount of $2,633.00. This amount represents the additional expense incurred to provide various field modifications to the rental counters - room #'s 119-126 - as per the architect's instructions to our field personnnel. Materials - Additional $ 997.00 T? AA Deleted 445.00 c 1So4 - - Labor - 96 Hours @ $18.00E Sub -total overhead Subtotal Profit Total If you have any questions regardi free to contact us. -1-- GB/tc I-r2P, 1728.00 2280.00 _ 228.00 2508.00 125.00 $2633.00 this request please feel 17,6ry truly yours, Gary Bel.lair Tech-Elec Co. ELECTRICAL CONTRACTING & SERVICE 19 18 17 16 15 13 m 77 P o >� 9 m --.--------,r--�--Y----�.L 4 111 /. Q Q m m m Q �` X zi v O .4 i o > m r co m n — o m ; f p° O m m O •'fi.: r r r p A m y r" �o r z M "' Z 3 -moi ° c z > M ` m > ap N v O + a> V OD co ,.-- Oa a► a w + to m O N N O .� � -�P X12-��► c 3,�,1,►a,►►,i4 P AOr*f2� A -r eZL.UMS)I; n; AJ �✓'-DING C��i°'� PA1J�� e! AN �A?7M w MJ �, daub a3ffi' t„- -K.s.�3 -. q' ",�'` v` s�' -x "'vJ ,r cu „� S a �-«. ,�g �2 ^c ''' ti` mr ri uF''e7.'u'* �^, + + ?. .,a„``�•Y..k" a �'t�"�±:+ Tek.. *<. .:"'. r x� 'M ""h' ncey Jones `NTcQueen, and Jones rownield'Iw Suite 10w... w. `texas9T u o` cc n erna ional Airport CerminaExpansion lk�' (�.11""zy '*"'� xS �:1, .zi + .^?.' ��hv�.hP�£':C 'r-�+R 'tier i+ux: 5. #,eY' H•r:..� .+'°'.,s_.�»A>�r_cr .�,..hY�...r;.,cr';r '3."a"d ,..m-."s,..""y3i;<-i... �r...�._.x�.°':x ancey NNA accept the folaowing prices as requested, c � . t-�-:+' ^,c..��-«.eibPi'€ C xtend adcitiona existing uctwor at second floor as rpquire c � � $ S Mec�h,anical 9 6 34� �� s1 o O fi and Profit, 29 45 TotalMw $225 79 2 jj ExtencC existing ductwork as instructed at _remodee rest rooms. �:' +�. o,� H& �hanica $199.7 5 o O I and 'Tofu 29.9 .a.h .., `-$229. __ 74 Total ave any questions, please call. "_20 x • y� •. S ..... , e..�..i_.e.,...a.......,.e.. April 14 ,1986 Tech-Elec Company 5632 BROWNFIELD HIGHWAY LUBBOCK, TEXAS 79407 (806) 765-9292 Lee Lawis General Contractor Inc. P.O. Box 65197 Lubbock, TX. 79464 Attention: Tozn Ferguson Subject: Lubbock International Airport Terminal Buil:3ing Phase II Gentlemen: The plans for this project indicate the exitence of a share 30A/3P switch. This switch was to have provided the circuit protection for AHU #6, however, our field personel have determined there is no spare 30A/3P switch in "MA211. As this is a situation of which we v7ere not aware of _until our field nersonel removed the swichboard cover and determined that no spare switch existed, we believe we are entitled to a change order to provide and install a 30A/3P switch in "MA2". Therefore, we are requesting you to process a change order in the amount of $932.00 for the installation of a new 30A/3P switch in II.MA211, the breakdown of which is as follows: Material (switch,hardware & coverplate) $645.00 Freight 40.00 Labor 121.00 Subtotal 806.00 Overhead 81.00 Subtotal 887.00 Profit 45.00 Total $932.00 If you have any questions regarding this request, please feel free to contact us. Very truly yours, ,ar Be air Tech-Flec Co. ELECTRICAL CONTRACTING & SERVICE