HomeMy WebLinkAboutResolution - 2464 - Accept Paving Improvements - Hub City Pavers - University Ave Widening At 8Th St - 11/13/1986IJWF:js RESOLUTION Resolution #2464 November 13, 1986 Agenda Item #14 I RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS, AND/OR AVENUES AS LISTED BELOW: WHEREAS, the City of Lubbock heretofore entered into Contract with Hub City Pavers, Inc. for the making of street improvements on portions of streets and/or avenues in said City including among other the following: University Avenue widening at 8th Street; and WHEREAS, the construction of the above improvements on the above- mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with terms of said Contract, G.W.O. 9147; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements on said portion of University Avenue BE and the same are hereby accepted and the City Engineer BE and he is hereby authorized to direct the final payment to the contractor in the amount of $4,141.68. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this 11th day of NnvPmhPr 1986. cAf� B. C. McMINN, MAYOR "EST: Ranetite Boyd, City Secret i APPRokb AS TO CO.NTNNT,.,,a Larry V./,Aoffman,' y Engineer !APPROVED AS TO FORM: , J. orth Fullingim, Assis ant City Attorney and disposal Sum MONTHLY ESTIMATE CITY OF LUBBOCK Project: University Ave. Widening at 8th St. Project No. 9147 Contractor: Hub City Pavers Inc. Estimate No. 3 & Final Address: 4505 - 22nd Place Contract$ 72,378.00 sprinkler system Lubbock, Texas 79407 18,094.50 C.O. No. 1 $90,472.50 Estimate Period From October 1 19 86 to November 13 86 Concrete paving removal and S.Y. '19 On First estimate and final estimate use actuaWWrk dates $18.00 $2,520.00 ITEM disposal UNIT OF PROJECT WORK DONE CONTRACT MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT 1. C & G removal & disposal L.F. 555 555 $8,00 $4,440.00 5• Brick & concrete base median L.F. 2. Storm sewer inlet box removal Lump 1 Completed $1,000-00 $1,000.00 and disposal Sum 3. Relocation of Texas Tech Lump Completed $2,500.00 $2,500.00 sprinkler system Sum 4. Concrete paving removal and S.Y. 140 140 $18.00 $2,520.00 disposal 5• Brick & concrete base median L.F. 315 289.2 $7.50 82 removal .16-9....00 6. Sidewalk removal S.Y. 220 233.97 1 57 0 7. A. C. Paving and base removal S.Y. --- 6.75 --- and disposal 8. C&G Construction including L.F. 555 627.9 $8.00 $5.02 2 No. 6 dowel bars on 5 font - centers 9. 4" thick sidewalk construction S.Y. 734.53 $18.00 $13,221.54 10. 10 foot o enin storm se er Lump 1 Completed $5,750.00 inlet box including lead Sum line tie in. 11. Median construction; 4" X 8" S.F. 1,000 989.2 $6.00 $5,935.20 brick on 3500-12si concrete APPROVED: Por En res office Total Amount of Work Done ....... $ 82, 333.56 Less 5 % Retained ..... — — — — Difference ....... $ 82, 833.56 Less Special Deduction ........... $ ----- Less Liquidated Damage ......... $ ----- Less Previous Payments ........... $ 78, 691.88 Amount Due this Estimate......... $_4,141-6g caicuiations by: Engineer Date Checked b Dept. Head Date Director Date MONTHLY ESTIMATE CITY OF LUBBOCK Project: University Ave. Widening at 8th St. Project No. 9147 Checked b paving Contractor: Hub City Pavers, Inc. Estimate No. 3 & Final Address: 4505 — 22nd Place L.F. Contract $ 72p378.00 $2,538.90 construction Lubbock, Texas 79407 $18,094.50 C.O. No. 1 $90,472.50 Estimate Period From October 1 , 19 86 to November 13 , 19 86 $1,000.00 ln_ate constructed at side— walk level Sum on First estimate and final estimate use actual work dates ITEM UNIT OF PROJECT WORK DONE CONTRACT 15. 9th.Street closure as er MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT 12. 8" reinforced concrete S.Y. 670 498:23 $40.00 $19,929.20 Checked b paving Director Date 13. Sidewalks retaining wall L.F. 400 362.70 $2,538.90 construction 14. Drainage slab with steel Lump Completed $1,000.00 $1,000.00 ln_ate constructed at side— walk level Sum 15. 9th.Street closure as er Lump Completed $15,227.25] $15,227.22 change order No. 1 APPROVED: For Fnqis Office --- Total Amount of Work Done ....... $ 82, 833.56 Less 5 % Retained ............. $ --- Difference ................... $ 82.833.56 Less Special Deduction ..... $ --- Less Liquidated Damage ......... $ --- Less Previous Payments ........... $ 78, 691.88 AmOL:nt Due this Estimate,......... $ 4,141 .68 Calculations bY: Engi eer Date d� Checked b Dep d Date Director Date