HomeMy WebLinkAboutResolution - 2594 - Accept Paving Improvements- Kerr Construction- Tract 6, Planters Industrial Park - 06/11/1987JWF:dw
Resolution #2594
June 11, 1987
Agenda Item #17
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1331, the subdivider of Planters Industrial Park Addition,
Tract 6, made arrangements with Kerr Construction Company for the
construction of paving improvements on certain streets dedicated in said
subdivision under the provisions of said Ordinance prior to the recording
of the subdivision plat of the above-mentioned addition including the
following streets:
East 16th street from its intersection with the east lip line
of Loop 289 access road to its intersection with a line
1003.85 feet east of the east lip line of Loop 289 access
road known and designated as New Subdivision Sub -Unit Number
00 of Unit Number 20331
North 1/2 of East 19th street from its intersection with the
east lip line of Loop 289 access road to its intersection
with a line 730 feet east of the east lip line of Loop 289
access road know and designated as New Subdivision Sub -Unit
Number 01 of Unit Number 20331 and
WHEREAS, the construction of the above improvements on the above-
mentioned streets was performed under the supervision of the City
Engineer, and said improvements have been completed and have been
inspected and found to have been constructed in accordance with City
specifications and in accordance with the provisions of City Ordinance
13311 NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the improvements on said portions of the above-
mentioned streets BE and the same are hereby accepted and the City
Engineer BE and he is hereby authorized to notify the Developer of
acceptance by the Lubbock City Council.
SECTION 2. THAT this resolution shall take effect and be in force
from and after its passage.
Passed by the City Council this 11th clay of June . 1987.
ATTEST:
, City Secretary
c
B. C. T4cMMj, MAYOR
TO FORM:
-I-
J. W&pEh Fullingim, Assistant Ci
Att y VI
-2-
41
Cd
V
41
W
O
O
N
O
H
M
M,
00
co
va
0.
c�
Ln
En C)
� o
0
to
w
r-4�
•
L
Ln
w o
m
o�
o,
s
0
0
07 0!
D4
b
0 0 •
� u
a W
as
V
Hm
0O
H
rl
00
p M
Fc7 N
z w �
• w C7
%0
0
�1
M
M
a 1+ Q
O
O
N
N
W
o
L
a U
d
bo19
O
O
44 CO
N
N
0 '°
P4 d
z
rl
E.4
A
Cd
v] $ C1
6R
co
C+
H
' i
00 0)
W
> w 44 0
P4
`H4-
•o
a = W
w
�
�+ 4 r
a
CA EH..
N
y 3 v
H
A
41
A z
a
oo
H H
4
v
44 d
o v
VA
C0 �
w
ac a
E-4z�
°�
x
4
N
4-J Cd
P4
v� 3.0
41
Cd
V
41
W
O
O
N
O
H
M
M,
00
co
va
0.
u . (1)a
Ln
En C)
0
0
to
Ln
r-4�
•
L
Ln
w o
m
o�
o,
0
0
� -:r
P. Pi
•
va
0.
u . (1)a
Ln
En C)
C
0
N
•
H O
w o
m
41
N
07 0!
D4
CY
0 0 •
� u
a W
as
N
Hm
0O
rl
00
p M
Fc7 N
z w �
%0
0
0
M
M
O
O
N
N
4)
co
Cd
.0
x cn
U
PQ U
W b
a a
Cd Cd
.L1 �
L
bo Irl
� b
P4 -4
W $4
Ln Ln
t0 �0
.moo .moo
•
va
+�
w
t!1
H
H
•
E -H
CY
n
as
a
0
0
41E
%0
N
W
z
o
O
O
N
N
PLANTERS INDUSTRIAL PARK ADDITION
Tract 6
CONSTRUCTION COST
4,079.51
S.Y.
Paving
9" ASB
at
$ 18.40
$ 75,062.98
507.78
S.Y.
Paving
9" caliche base
at
$ 7,50
$ 3,808.35
5,607..57
S.Y.
Paving
6" caliche base
at
$ 6.45 _
$__36,168.83
2,637.74
L. F.
C & G
at
$ 6.18
$ 16.301.23
146.00
L. F.
reinforced C & G
at
$ 7.00
$ 1,022.00
61.43
S.Y.
Valley
Gutter
at
$ 23.75
$ 1,458.96
102,00
L. F.
C &,G
removal & disposal
at
$ 5.00
$ 510.00
2,769.00
S.Y.
Paving
& base removal & disposal
at
$ 1.50
$ 4.153.50
646.50
L. F.
ASB under C & G
at
$ 2,75
$ 18,777.88
1,297.00
C. Y.
Ditch
excavation
at
$ 1.75
$ 2.269.75
COST DISTRIBUTION
Unit & Construction Developer
2033-00
2033-01
$ 51,345.93
$ 91,187.55
TOTAL CONSTRUCTION COST $ 142.533.48
$ 51,345.93
$ 91,187.55
TOTAL i $ 142,533.48 $ 142,533.48