HomeMy WebLinkAboutResolution - 2680 - Accept Paving Improvements - Kerr Construction - Lot A, Lubbock Stake Addition - 11/12/1987JWF:dw
Z�--;j IkIA0
Resolution #2680
November 12, 1987
Agenda Item #9
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1331, the subdivider of Lubbock Stake Addition, Lot "A"
made arrangements with Kerr Construction Co. for the construction of
paving improvements on certain streets dedicated in said subdivision
under the provisions of said Ordinance prior to the recording of the
subdivision plat of the above-mentioned addition including the following
streets:
East 1/2 of Genoa Avenue from its intersection with a line 7
feet north of north property line of alley north of 72nd
Street to 156 feet north of north property line of alley
north of 72nd Street known and designated as New Subdivision
Sub --Unit Number 36 of Unit Number 2033.
West 1/2 of Frankford Avenue from its intersection with a line
7 feet north of north property line of alley north of 72nd
Street to 402 feet north of north property line of alley
north of 72nd Street (Curb & Gutter Only) known and
designated as New Subdivision Sub -Unit Number 37 of Unit
Number 2033; and
WHEREAS, the construction of the above improvements on the above-
mentioned streets was performed under the supervision of the City
Engineer, and said improvements have been completed and have been
inspected and found to have been constructed in accordance with City
specifications and in accordance with the provisions of City Ordinance
1331; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the improvements on said portions of the above-
mentioned streets BE and the same are hereby accepted and the City
Engineer BE and he is hereby authorized to notify the Developer of
acceptance by the Lubbock City Council.
SECTION 2. THAT this resolution shall take effect and be in force
from and after its passage.
Passed by the City Council this 12th day of Nnvpmhpr , 1987.
Y �!
'• •City Secretary
• • •Ri'M AS TO CONTENT:
E
f � ♦� C f
B. C. MCMW, MAYOR
•• 22 • •
-2-
J. Woiq Fullingim,
Assistant
AttO
-2-
CONSOLIDATED FINAL ESTIMATE
LUBBOCK STAKE ADDITION
Lot "A"
Accepted 11 - 12, 1987
Unit & S.Y. Paving L.F. L.F. Reinforces
Sub Unit Location 6" Base C'& G C & G
2033-36 E 1/2 of Genoa from 7' N. of NPL of 264.19 111.93 39.00
alley N of 72nd. St. to 156' N of
NPL of alley N of 72nd. St.
2033-37 W 1/2 of Frankford from 7' N of NPL 221.00 174.00
of alley N of 72nd. St. to 402' N of
NPL of alley N of 72nd. St. (C & G only)
TOTAL QUANTITIES 2.64.1$ 332.93 213.00
COST ESTIMATE
264.19 S.Y. Paving, 6" Base
at $ 7.75
$
2,047.47
332.93 L.F. Curb and Gutter
at $ 5.50
$
1,831.11
213.00 L.F. Reinforced C & G
at $ 6.30
$
1,341.90
$
5,220.48
COST DISTRIBUTION
Unit & Sub Unit Contract Cost Developer Cost
2033-36 $ 2,908.78 $ 2,908.78
2033-37 $ 2,311.70 $ 2,311.70
$ 5,220.48 $ 5,220.48