Loading...
HomeMy WebLinkAboutResolution - 2625 - CO #2 To Contract - Lee Lewis General Contractor - Maintenance Building, LIA - 08/13/1987HW:js RFSnI IITTnN Resolytion #2625 August 13, 1987 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock Change Order No. 2 to a Contract previously entered into by and between said City and Lee Lewis General Contractor, for the construction of a Maintenance Building for snow and ice removal equipment at Lubbock International Airport, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this l_lt.h day of Augimt , 1987. -B. C. MCMINN, MAYOR ATTEST: nette Boyd, City Secretary APPROVED AS TO CONTENT: Mar1vin Coffee, Di for of Aviation APPROVED AS TO FORM: arold Wil rd, Assistant City Attorney CHANGE ... Distribution to: ORDER OWNER ❑ ARCHITECT AIA DOCUMENT G701 CONTRACTOR FIELD ❑ OTHER ❑ PROJECT: Maintenance Building for Snow and CHANGE ORDER NUMBER: 2 (name, address)Ice Removal Equipment; Lubbock International Airport, Lubbock, TexasINITIATION DATE: April 15, 1987 TO (Contractor): ��---- ILee ARCHITECT'S PROJECT NO: 8750 Lewis 3eneral Contractor, Inc. 1 CONTRACT FOR:The construction of the Main - P.O. Box Lubbock, 65197 Texas 79464 tenance Building for Snow and Ice Removal Equipment, Lubbock International Ai ppor AIP Project No.3-�8-0138- CONTRACT DATE: .J June 3, 1987 You are directed to make the following changes in this Contract: See Attached List, Items.l through 8 TOTAL CHANGE IN CONTRACT SUM (ADD) ..................$ 259706.00 TOTAL CHANGE IN CONTRACT TIME DUE ITEMS 1 THROUGH 8 ............................. NONE TOTAL CHANGE IN CONTRACT TIME DUETO WEATHER DELAYS..... ....................... 109 DAYS Approved as to Content: Approved as to Form: JL Marvin Coff , Director of Aviation Harold Willard, Asst. City Attorney Not valid until signed by both the Owner and Architect. Signature of the• Contractor indicates his agreement herewith, including any adjustment in the Contract Surn or Contracl Time. The original (Contract Sum) (Gd0wcXXo&kkxkXxX:)fxatcQkwas ........................... $ 2,341,150.00 Net change by previously authorized Change Orders ...................... • ............ $ 4,387.00 The (Contract Sum) (0Cxaaxtlt=ot%Aa0mmxX3mX prior to this Change Order was ......... $ 2,345,537.00 The (Contract Sum) will be (increased) ( N* (XP1QdXX:KQ p by this Change Order......................................................... $ 25,706.00 The new (Contract Sum) including this Change Order will.be ... $ 2, 371, 243.00 The Contract Time will be (increased) (&xxa.xm* (Lmzx t=ab by ( 109 ) Days. The Date of Substantial Completion as of the dace of this Change Order therefore is September 20, 1987 Parkhill, Smith & Cooper, Inc. Lee Lewis General Contractor ARCHITECT) TRAi'TUR 4ai n Avenue R. .�. Sox 65197 Address Address , Texas 79412 13Y DATE DATE AIA DOCUMENT G701 ' • CHANGE ORDER • APRIL 19711 EDITION AIA110 1 n THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. Authorized: Citv of Lubbock OR P.O. Box 2000 Address Lubbock, Texas 79457 a- Rv�► -Mayor, b. C. McMinn" DATE rIR-1R-R7_ - Boyd, City Secretary f CHANGE ORDER NO. 2 Maintenance Buildine for Snow and Ice Removal Equipment LUBBOCK INTERNATIONAL AIRPORT AIP Proiect No. 3-48-0138-06 I. Additional earthwork at west apron approach due to conflict with existing water line (ADD) ....................................... ...,.$ CHANGE ORDER NO. 2 Maintenance Buildine for Snow and Ice Removal Equipment LUBBOCK INTERNATIONAL AIRPORT AIP Proiect No. 3-48-0138-06 I. Additional earthwork at west apron approach due to conflict with existing water line (ADD) ....................................... ...,.$ 3,777.00 2. Relocate underground fuel tanks to east edge of apron (ADD) ............ $ 101100.00 3. Add electrical for power change to fuel pumps (ADD) ....................$ 3,220.00 4. Extended 2-4" telephone conduits from building to west property dine (ADD) ... .........................................................$ 29875.00 5. Add -V thick roof insulation on north portion of roof to cover boltconnections (ADD) ..................................................$ 7,676.00 6. Add floor drain at air washer and extend water line to hot water washer (ADD)............................................................$ 1,262.00 7. Add twelve (12) overflow scuppers in west building fascia for roof drainage (ADD) .....................................................$ 4,301.00 8. Delete overhead secondary power service and provide underground primary and pad mounted transfdrmer service (by LP&L) (DELETE) ......... $ (79505.00) TOTAL (ADD) ................$ 25,706.00