Loading...
HomeMy WebLinkAboutResolution - 2767 - Cover Sheet - TDHPT - Construction Plans, I27 From 19Th St To 4Th St - 03/10/1988JWF:dw RESOLUTION Resolution #2767 March 10, 1988 Item #13 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock the mylar title sheet for the plans and specifications for Interstate Highway 27 construc- tion from 19th Street to 4th Street in the City of Lubbock as prepared by the Texas State Department of Highways and Public Transportation, said execution by the Mayor of the City of Lubbock being requested by said state department by letter dated February 24, 1988. Passed by the City Council this 10th day of , city Secretary AP ROVED,AS TO CONTENT: Larry fm ector of Transobrtation APPROVEB,AS TOAFORM: III " J. Wgett Fullirigim, Assistant Cit A torney March , 1988. ff C - 1A F err, B. C. McMINN, MAYOR 0 COMMISSION STATE DEPARTMENT OF HIGHWAYS ENGINEER -DIRECTOR ROBERT H. DEDMAN, CHAIRMAN AND PUBLIC TRANSPORTATION R. E. STOTZER, JR. ROBERT C. LANIER P.O. Box 771 ' RAY STOKER, JR. Lubbock, Texas 79408-0771 February 24, 1988 IN REPLY REFER TO Subject: Transmittal of Construction Plans County : Lubbock Highway: I.H. 27 Control: 67-11-22 Project: 127-7(53)305 Limits : From 19th St. to 4th St. in Lubbock Mr. Larry Cunningham City Manager City of Lubbock Box 2000 Lubbock, Texas 79408 Dear Sir: We are delivering one set of blue line prints of the captioned project for your examination and file, together with the mylar title sheet for the signature of the Mayor. Please contact Mr. Edward P. Hensley, District Design Engineer, at telephone number 745-4411 extention 424, when the signature is obtained. Sincerely, William M. Pope District Engineer District Five By: Edward P. Hensley District Design Engineer EAS/cw cc: City Engineering Department