Loading...
HomeMy WebLinkAboutResolution - 2709 - Accept Paving Improvements - Kerr Construction - Lake #6 & Atzlan Park Road - 01/14/1988Resolution #2709 January 14, 1988 Item 9 Lmwlq AVENUES]REZ=ION ACCEPTIM DWFDVO92M ON PORTIONS OF STREETS AND/OR E1 :E • WHEREAS, the City of Lubbock heretofore entered into Contract with Kerr Construction!uny� for the making of street improvements on portions of streetss�anc/or avenues in said City including among other the following: Lake 6 road extension on south side of lake and connection to Cul- de-sac on north side of dam known as Sub -Unit Number 72 of Unit Number 2240. Atzlan Park road from intersection of 1st Street and Avenue J to east property line of Atzlan Park known as Sub -Unit Number 73 of Unit Number 2240. Park Road from east right -of -Tway line of IE -27 to Park Road 18 in Mackenzie Park known as Sub -Unit Number 74 of Unit Number 2240. Colgate Street from its intersection with a line 13 feet east of east property line of Niter Avenue to its intersection with the west raw edge of Olive Avenue known as Sub -Unit Number 70 of Unit Number 2240. Baylor Street from its intersection with a line 13 feet west of west property line of Mulberry Avenue to its intersection with a line 13 feet west of the west property line of Niter Avenue known as Sub - Unit Number 71 of Unit Number 2240. WHEREAS, the construction of the above improvements on the above- mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with terms of said Contract, Project No. 5105; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements on said portions of the above- mentioned streets BE and the same are hereby accepted and the City Engineer BE and he is hereby authorized to direct the final payment to the contractor in the amount of $17,463.31. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this 14th day of January , 1988. 1�/ . l.� • ./.%/• a /"Ot'g?G9r B. C. MCMWr MAYOR ATTEST: Boyd, City .5715' 67(OW15 0q FA ?J!W 1V Ph DI V J. Fullingim, Assistant Ci ttorney 1. Paving at Lake 6 with 1-1/2" S.Y. 8.600 8 510.74 6.30 53.617.66 T.H.D. Type "C" A.C. including subgrade preparation, 1800 C.Y. of cut, and 6" of caliche base. Paving at Atzlan Park with I S.Y. 1 4.800 1 J,uo.a.yo 1 X6.25 I Z? Jia040.1:2 1-1/2" T.A.D. Type "C" A.C. including subgrade preparation, 177 C.Y. of cut, and 6" of caliche ase. 3. 6" curb and Rutter or 30" L.F. 7,9008,011.33 - 44 863.45 separate gutter or saw tooth curb and gutter including subgrade. _ 4. 6" curb and gutter including I T. -'F- I R4n __ 1 830 1 $ 6.60 1 $ 5,478.00 No. 6 deformed dowel b. 16" in length spaced o. centers alone concrete 5. 5" thick Class A 3,000 si S.Y. 1 1.4001.512.14 22.21J__��,645,12 28 day concrete flatwork with 5% air entrainment and 6X6- 10/10 wire mesh 6. Construction over sewer lines S.Y. 215 214 S 39.00 S 8,346.00 with 8' reinforced concrete -paving with 5% air entrained Class C 3,600 psi concrete constructed on six inches of APPROVED: Fm Fnr,•ti a Tot.il Amount of Work Done ....... e" Less •5 % Retained ............. S Engineer Date Difference ............... . . . S Less Special Deduction ........... S checkea thy• Dept Head Date Less Liquidated Damage ......... 5 Less PrpOous Payments . ......... S Director Date Amount Due this Estimate......... $ Page 1 of 3 MONTHLY ESTIMATE CITY OF* LUBBOCK _.. Project: Paving Improvements for Lake 6 and Atzlan Park Project No. 5105 Contractor: Kerr Construction Co. Estimate No. 11 & FINAL Address: P.O. Box 888 Contract$ 286,858.50 47,556.60 C.O. # 1 Lubbock. Texas 79408 ,22,259.25• C.O. # 2 Estimate Period From December 1, 19 87 to December 4, 1987 $ 356,674.35 On First estimate and final estimate use actual work dates ITEM UNIT OF PROJECT WORK DONE CONTRACT MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT 1. Paving at Lake 6 with 1-1/2" S.Y. 8.600 8 510.74 6.30 53.617.66 T.H.D. Type "C" A.C. including subgrade preparation, 1800 C.Y. of cut, and 6" of caliche base. Paving at Atzlan Park with I S.Y. 1 4.800 1 J,uo.a.yo 1 X6.25 I Z? Jia040.1:2 1-1/2" T.A.D. Type "C" A.C. including subgrade preparation, 177 C.Y. of cut, and 6" of caliche ase. 3. 6" curb and Rutter or 30" L.F. 7,9008,011.33 - 44 863.45 separate gutter or saw tooth curb and gutter including subgrade. _ 4. 6" curb and gutter including I T. -'F- I R4n __ 1 830 1 $ 6.60 1 $ 5,478.00 No. 6 deformed dowel b. 16" in length spaced o. centers alone concrete 5. 5" thick Class A 3,000 si S.Y. 1 1.4001.512.14 22.21J__��,645,12 28 day concrete flatwork with 5% air entrainment and 6X6- 10/10 wire mesh 6. Construction over sewer lines S.Y. 215 214 S 39.00 S 8,346.00 with 8' reinforced concrete -paving with 5% air entrained Class C 3,600 psi concrete constructed on six inches of APPROVED: Fm Fnr,•ti a Tot.il Amount of Work Done ....... e" Less •5 % Retained ............. S Engineer Date Difference ............... . . . S Less Special Deduction ........... S checkea thy• Dept Head Date Less Liquidated Damage ......... 5 Less PrpOous Payments . ......... S Director Date Amount Due this Estimate......... $ Page 2 of 3 MONTHLY ESTIMATE CITY OF LUBBOCK Project: Paving Improvements for Lake 6 and Atzlan Park Project No. 5105 Contractor: Kerr Construction Co. Estimate No. 11 & FINAL Address: P.O. Box 888 Contract $ 286,858.50 Lubbock, Texas 79408 47A556.60 C.O. 1 22,259,25 C.O. # 2 $.356;,674.35 Estimate Period From December 1 , 19 87 to December 4, On First estimate and final estimate use actual work dates '1901 ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE CONTRACT ON CONTRACT PRICE AMOUNT 8. 8" reinforced concrete S.Y. 1,775 29072.38 78.750.44 at Lake 6 below the dam with 5% air entrained Class "C" 3,600 psi concrete on 1" of sand cushion. 10. 12" high and 8" wide L.F. 400 398.30 4,361.38 curb and gutter incl. No deformed dowel bars alonjz east side of concrete paving below the dam.' 11. Const. of 30" I.D., 46 46 culvert pipe with smooth interior walls encased in Class A, 3,000 psi, 5% air entrained concrete. 12. Comnaccted embankment -w C 965.50 17,379. 00 b 13. Curb and Gutter removal and I L.F. _1 150 1 lou 1 $ 3.50 __j %) JcJ.vv disposal at Cul -de -Sac on north side of dam and at 1st. street and Ave. J 14. Com acted :earth embankment at C.Y. 150 150 1.75 262.50 Lake 6 through out the paving project as required for grade. Fill material to be available on job site. APPROVED: Pn, Fn ,•N (,#,,, r IS Tot.;l Amount of Work Dore ....... ('.Vr uidtinns Uy: Less 5 "„ Retained ............. S Engineer Date Difference .... Less Special Deduction ........... S Checked hy: Dept. Head Date Less Lirluidated Dimage ......... 5 Less Previous Payments . . . . . . ..S Director Date Amount Due this Estimate.. ..... $ i Page 3 of 3 MONTHLY ESTIMATE CITY OF-* LUBBOCK Project: Paving Improvements for Lake 6 & Atzlan Park Project No. sins Contractor: Kerr Construction Co. Estimate No. 11 & FINAL Address: P.O. Box 888 Contract $ 286,858.50 47., 556.60 r,.0. # 1 Lubbock, Texas 79408 - `22,259:;25 C.O. # 2 Estimate Period From December 1, 1987 to December 4, . 1987 $ 356,674.35 on First estimate and final estimate use actual work dates ITEM UNIT OF PROJECT WORK DONE CONTRACT MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT 15. Compacted earth embankment in C.y. 271 271 S 4,0n $ 1.084.00 Atzlan Park. 16. Concrete slab removal and S.Y. 75 71 4.00 $ 284.00 2' x 2' w wall of t i 1. Paving Col ate and Baylor S.Y. 5,3705370 33 831.00 Curb and Gutter L.F. 2.451 _1 2.451 13.72 .60 1. Paving w1t. 1-1/2" Type "C" S.Y. 1 2,133 Z Z63.T/ b.z� 4 44 a A.C. including sub rade 3. 6" Curb and Gutter L.F. 1,200 1,177.22 5.60 $ 6,592.43 11. Const. of 30" I.D. Class II L.F. 46 52 48.00 2 496.00 culvert Dive 1 APPROVED: Fn+ Fn .'ti Off-, e C:UCuldfi nnS hY� ya& 2�� �a 1 97 Engineer n Date Cf Total Amount of Work Done ....... e; 353,841.14 Less 5 % Retained ............. $ 0 Difference ............... ... S 353,841.14 Less Special Deduction ........... S Less Liquidated D:Image ......... $ 300.00 Less Previous Payments. ......... S 336,077.83 Amount Due this Estimate......... $ 17,463.31