HomeMy WebLinkAboutResolution - 2803 - Accept Paving Improvements - Kerr Construction - Lots 21-28, Fraternity Addition - 04/14/1988Resolution #2803
April 14, 1988
Item 15
JWF:dw
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Fraternity Addition, Lots 21 through 28
made arrangements with Kerr Construction Co., for the construction of paving
improvements on a certain street dedicated in said subdivision under the
provisions of said Ordinance prior to the recording of the subdivision plat
of the above subject addition including the following street:
Orlando Avenue from the North lip line of 15th Street to the North
property line of Lots 21 and 28, known as Unit 2032-19; and
WHEREAS, the construction of the above improvements on the above-
mentioned street was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in
accordance with the provisions of City Ordinance,1331.; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the improvements on said portions of the above-
mentioned street BE and the same are hereby accepted and the City Engineer
BE and he is hereby authorized to notify the Developer of Acceptance by the
Lubbock City Council.
SECTION 2. THAT this resolution shall take effect and be in force
from and after its passage.
Passed by the City Council this 14th day of April 1988.
"B. C. McMINN MAYOR
Secretary
APPIROVED AS TO C
Larry floffmairector of
Trans tation
APPROVED AS TO FORM:
J orth Fullingim, Assi tant
y Attorney
CONSOLIDATED FINAL ESTIMATE
FRATERNITY ADDITION
Lots 21 thru 28
Accepted April 14, 1988
Unit and S.Y. Pay. L.F. S.Y. L.F. C & G
Sub -Unit Location 6" Base C & G V. G. removal
2032-19 Orlando Ave. from the 4,551'..46 2,187.16 76.99 92.00
NLL of 15th. St. to
NPL of lots 21 & 28
COST DISTRIBUTION
Contract Developer
Cost Cost
$ 58,910.00 $ 58,910.00
Lump Sum Contract including additional paving to connect Greek Circle to
north end of Orlando Ave.