Loading...
HomeMy WebLinkAboutResolution - 2910 - Accept Paving Improvements - Kerr Construction - Strip Paving, Frankford Ave - 09/08/1988JWF:dw 1:U61II`arel N Resolution #2910 September 8, 1988 Item #11 RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS LISTED BELOW: WHEREAS, the City of Lubbock heretofore entered into Contract with Kerr Construction Company for the making of street improvements on portions of streets and/or avenues in said City including among other the following: Frankford Avenue strip paving from 82nd Street to 660 feet South of 98th Street; and 98th. St. from Frankford Ave. to Elmwood Ave. and WHEREAS, the construction of the above improvements on the above- mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with terms of said Contract; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements on said portion of Frankford Avenue be and the same are hereby accepted and the City Engineer BE and he is hereby authorized to direct the final payment to the contractor in the amount of $5,102.54. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this 8th qRantetez Boyd, City Secre ry APPROVED AS 1T�O CONTENT: [J . "'Carry D.'Hertel, City Engineer day of September , 1988. B. C. McMINN, MAYOR APPRO JD`QA�%S TO FORM: l�1 b'a L, orth Fullingim, AssistanllCity orney MONTHLY ESTIMATE CITY OF LUBBOCK Project: FRANKFORD AVE. STRIP PAVING Project No. 9157 Contractor: KERR CONSTRUCTION CO. Estimate No. 4 & -FINAL Address: P. 0. Box 888 Contract$ 109-603.20 Lubbock Texas 79408 Estimate Period From August 23, , 19 88 to September 8, 19 88 On First estimate and final estimate use actual work dates ITEM UNIT OF PROJECT WORK DONE I CONTRACT MEASURE I EST. QUANTITIES ON CONTRACT PRICE AMOUNT grade No. 2 spec coated crushed stone sliver count and test Grade No. 4 crushed sto count and s 5. Extra Grade No. 2 special re- C coated crushed stone left over in stockpile after all two - course asphalt surface is completed, including loading, hauling to the City of Lubbock storage lot at Municipal Hill 6. Asphalt(AC-5 polymerized Gals. 1 7,620 1 6,900 asphalt + 3%rubber for course No. 1 1 APPROVED: F o, Fn ,'s O#t-, a Total Amount of Work Done ....... W cairwahnns hvn Less 5 % Retained ............. $ Engineer Date Difference ...................5 Less Special Deduction ........... 5 checked t)y: Dept. tread Date Less Liquidated Ddmage ......... $ Less Previous Payments . ........ $1 Director Date Amount Due this Estimate....... $ MONTHLY ESTIMATE CITY OF* LUBBOCK Project: FRANKFORD AVE. STRIP PAVING Project No. 9357 Contractor: KERR CONSTRUCTION CO. Estimate No. 4 & FINAL Address: P. 0. Box 888 Contract $ 109.603.20 Lubbock, Texas 79408 Estimate Period From August 23, 19 88 to September 8, r 19 88 on First estimate and final estimate use actual work dates ITEM UNIT OF PROJECT WORK DONE CONTRACT MEASURE I EST. QUANTITIES ON CONTRACT PRICE AMOUNT 0 asphalt + 3% rubber) for course No. 2 8. Caliche base 6" thick in- S.Y. 24,905 22.939 $ 2.70 8 61,935.30 cluding sub rade preparation, cut or -fill as required, complete in place per square yard compacted, with prime coat; including dirt work necessary to construct drainage channels 15 feet wide and 1 Foot -deep along both sides ot the strip paving extending the entire engt e project APPROVED: Pm Fn p's 0 t -,e TotJ Amount of Work Done ........ 102,050.80 69 PIP ('Air utatinns hY: a to Less 5 °a Retained . $ Engineer Date of d(`V•� Difference ...................5 102,050.80 A Z1216 _ Less Special Deduction ........... $ Checked t. : Dep Head Date Less Liquidated Damage ......... 5 ..- D Less Previous Payments . .. S 96.948.26 Director G Date Amount Due this Estimate..... . $ 5,102.54