Resolution #2910
September 8, 1988
Item #11
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES
AS LISTED BELOW:
WHEREAS, the City of Lubbock heretofore entered into Contract with Kerr
Construction Company for the making of street improvements on portions of
streets and/or avenues in said City including among other the following:
Frankford Avenue strip paving from 82nd Street to 660 feet South
of 98th Street; and 98th. St. from Frankford Ave. to Elmwood Ave. and
WHEREAS, the construction of the above improvements on the above-
mentioned street was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to
have been constructed in accordance with terms of said Contract; NOW
THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the improvements on said portion of Frankford Avenue be
and the same are hereby accepted and the City Engineer BE and he is hereby
authorized to direct the final payment to the contractor in the amount of
$5,102.54.
SECTION 2. THAT this Resolution shall take effect and be in force from
and after its passage.
Passed by the City Council this 8th
qRantetez
Boyd, City Secre ry
APPROVED AS 1T�O CONTENT:
[J .
"'Carry D.'Hertel, City Engineer
day of September , 1988.
B. C. McMINN, MAYOR
APPRO JD`QA�%S TO FORM:
l�1 b'a L,
orth Fullingim, AssistanllCity
orney
MONTHLY ESTIMATE
CITY OF LUBBOCK
Project: FRANKFORD AVE. STRIP PAVING Project No. 9157
Contractor: KERR CONSTRUCTION CO. Estimate No. 4 & -FINAL
Address: P. 0. Box 888 Contract$ 109-603.20
Lubbock Texas 79408
Estimate Period From August 23, , 19 88 to September 8, 19 88
On First estimate and final estimate use actual work dates
ITEM UNIT OF PROJECT WORK DONE I CONTRACT
MEASURE I EST. QUANTITIES ON CONTRACT PRICE AMOUNT
grade No. 2 spec
coated crushed stone
sliver count and
test
Grade No. 4
crushed sto
count and s
5. Extra Grade No. 2 special re- C
coated crushed stone left over
in stockpile after all two -
course asphalt surface is
completed, including loading,
hauling to the City of Lubbock
storage lot at Municipal Hill
6. Asphalt(AC-5 polymerized Gals. 1 7,620 1 6,900
asphalt + 3%rubber for
course No. 1 1
APPROVED: F o, Fn ,'s O#t-, a Total Amount of Work Done ....... W
cairwahnns hvn
Less 5 % Retained ............. $
Engineer Date Difference ...................5
Less Special Deduction ........... 5
checked t)y:
Dept. tread Date Less Liquidated Ddmage ......... $
Less Previous Payments . ........ $1
Director Date Amount Due this Estimate....... $
MONTHLY ESTIMATE
CITY OF* LUBBOCK
Project: FRANKFORD AVE. STRIP PAVING Project No. 9357
Contractor: KERR CONSTRUCTION CO. Estimate No. 4 & FINAL
Address: P. 0. Box 888 Contract $ 109.603.20
Lubbock, Texas 79408
Estimate Period From August 23, 19 88 to September 8, r 19 88
on First estimate and final estimate use actual work dates
ITEM UNIT OF PROJECT WORK DONE CONTRACT
MEASURE I EST. QUANTITIES ON CONTRACT PRICE AMOUNT
0
asphalt + 3% rubber) for
course No. 2
8. Caliche base 6" thick in- S.Y. 24,905 22.939 $ 2.70 8 61,935.30
cluding sub rade preparation,
cut or -fill as required,
complete in place per square
yard compacted, with prime
coat; including dirt work
necessary to construct
drainage channels 15 feet
wide and 1 Foot -deep along
both sides ot the strip paving
extending the entire engt
e project
APPROVED: Pm Fn p's 0 t -,e TotJ Amount of Work Done ........ 102,050.80
69 PIP ('Air utatinns hY:
a to
Less 5 °a Retained . $
Engineer Date of d(`V•� Difference ...................5 102,050.80
A Z1216
_ Less Special Deduction ........... $
Checked t. :
Dep Head Date Less Liquidated Damage ......... 5 ..-
D Less Previous Payments . .. S 96.948.26
Director G Date Amount Due this Estimate..... . $ 5,102.54