Loading...
HomeMy WebLinkAboutResolution - 2977 - Accept Sidewalk Improvements-Ford Construction-Avenues T & X, S Overton Addition - 12/15/1988HW:dw Tiq A"aI MGTIi Resolution #2977 December 15, 1988 Item #16 RESOLUTION ACCEPTING 1987 SOUTH OVERTON SIDEWALK IMPROVEMENTS AS LISTED BELOW: WHEREAS, the City of Lubbock heretofore entered into Contract with Ford Construction Corporation for the making of sidewalk improvements on portions of streets and/or avenues in said City including among other the following: Sidewalk improvements in South Overton Addition between Avenues "T" and "X" and 14th and 19th Streets. WHEREAS, the construction of the above improvements in the above- mentioned addition was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with terms of said Contract, Project No. 597610; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY.QF_LUBBOCK.: SECTION 1. THAT the sidewalk improvements in said portion of South Overton Addition BE and the same are hereby accepted and the City Engineer BE and he is hereby authorized to direct the final payment to the contractor in the amount of $20,912.08. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this 15th /ATTEST: Ranet a Boyd, City Secreta y APPROV D AS TO CONTENT: �y Tarry D. Hertel, City Engineer day of December , 1988. c t B. C. MCM N , MAYOR APPROVED AS TO FORM: §i 'HArold Willard, Assistant City Attorney Page 1 of 2 MONTHLY ESTIMATE CITY OF LUBBOCK Project: 1987 SOUTH OVERTON SIDEWALK IMPROVEMENTS Project No. 597610 Contractor: FORD CONSTRUCTION CORPORATION Estimate No. 3 & FINAL Address: # 32 Briercroft Office Park Contract$ 45,972.56 - 5,774.55 C.O. # 1* Lubbock, Texas 79412 $ 40,198.01 Estimate Period From 11 - 1 - , 1988 to 11 - 22- .1988 On First estimate and final estimate use actual work dates ITEM UNIT OF PROJECT WORK DONE CONTRACT MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT 1. Type l Class A Concrete side L.F. 3,-63,9 3,211.15 S 8.22 9 26 399 -AS walk 4 feet wide and 4" thick L1,086* -- including site clearance and 2,544 subgrade preparation, comnlete in place _ 2. Type 1 Class A Concrete S.Y. 122.1 124.69 S 16.n6 $ 2,002.52 Driveway Approachs, 4" thick including site clearance and subgrade reparation; complete in place 3. Curb and Gutter removal L.F. 510 340.50 A 2.21 $ 759.32 S disposal, and paving -repair ralci latinns by: 4. Curb and Gutter construction, L.F. 471 377.38 $ 3,083.19 Engineer 30 inch with 6" cur Difference ............... ... $ complete in place Less Special Deduction ........... $ 5. Type 1, Class E Concrete S.Y. 303 253.28 26.28 6.-656.20 Dept Head Alley Returns, including site Less Liquidated Damage ......... $ clearance and subgrade preparation, complete in place, $ Director Date Amount Due this Estimate......... $ 6. Remove sprinkler system from Lump Sun Completed 1 224.82 1,224.82 parkway and cap off at prop- erty line at three locations; two on Avenue X and one at 2205 16th St. APPROVED: For Fn(i''s 04f" e Total Amount of Work Done ....... S ralci latinns by: Less 5 % Retained ............. $ Engineer Date Difference ............... ... $ Less Special Deduction ........... $ Checked t)y: Dept Head Date Less Liquidated Damage ......... $ Less Previ0U5 Payments . ......... $ Director Date Amount Due this Estimate......... $ Page 2 of 2 MONTHLY ESTIMATE CITY OF LUBBOCK Project: 1987 SOUTH OVERTON SIDEWALK IMPROVEMENTS Project No. 597610 P Otte Contractor.• FORD CONSTRUCTION CORPORATION Estimate No. 3 & FINAL Address: �� 32 Briercrof t Office Park Contract $ 45, 972.56 - 5,774.55 C.O. # 1* Lubbock, Texas 79412- $ 40,198.01 11 - 1 - 11 - 22 - 88 19 Estimate Period From 11%=88 to On First estimate and final estimate use actual work dates UNIT OF PROJECT WORK DONE CONTRACT ITEM MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT thick, including si and subgrade prepar complete in place APPROVED t. Director M —99�� — J Checwed Date K Total Amount of Work Done ....... W 44,096.89 Less 5 % Retained ............. $ 0 Difference ..5 44,096.89 Less Special Deduction ........... S 0 Less Liquidated Damage ......... $ 0 Less Previous Payments. .........$ 23,184.81 Amount Due this Estimate......... $ 20, 912.08 F nt Fn is nlh[B CalCulatinns hY:W P Otte —99�� — J Checwed Date K Total Amount of Work Done ....... W 44,096.89 Less 5 % Retained ............. $ 0 Difference ..5 44,096.89 Less Special Deduction ........... S 0 Less Liquidated Damage ......... $ 0 Less Previous Payments. .........$ 23,184.81 Amount Due this Estimate......... $ 20, 912.08