December 15, 1988
Item #16
RESOLUTION ACCEPTING 1987 SOUTH OVERTON SIDEWALK IMPROVEMENTS AS
LISTED BELOW:
WHEREAS, the City of Lubbock heretofore entered into Contract with
Ford Construction Corporation for the making of sidewalk improvements on
portions of streets and/or avenues in said City including among other the
following:
Sidewalk improvements in South Overton Addition between Avenues
"T" and "X" and 14th and 19th Streets.
WHEREAS, the construction of the above improvements in the above-
mentioned addition was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with terms of said Contract, Project
No. 597610; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY.QF_LUBBOCK.:
SECTION 1. THAT the sidewalk improvements in said portion of South
Overton Addition BE and the same are hereby accepted and the City Engineer
BE and he is hereby authorized to direct the final payment to the contractor
in the amount of $20,912.08.
SECTION 2. THAT this Resolution shall take effect and be in force
from and after its passage.
Passed by the City Council this 15th
/ATTEST:
Ranet a Boyd, City Secreta y
APPROV D AS TO CONTENT:
�y
Tarry D. Hertel, City Engineer
day of December , 1988.
c
t
B. C. MCM N , MAYOR
APPROVED AS TO FORM:
§i
'HArold Willard, Assistant
City Attorney
Page 1 of 2
MONTHLY ESTIMATE
CITY OF LUBBOCK
Project: 1987 SOUTH OVERTON SIDEWALK IMPROVEMENTS Project No. 597610
Contractor: FORD CONSTRUCTION CORPORATION Estimate No. 3 & FINAL
Address: # 32 Briercroft Office Park Contract$ 45,972.56
- 5,774.55 C.O. # 1*
Lubbock, Texas 79412
$ 40,198.01
Estimate Period From 11 - 1 - , 1988 to 11 - 22- .1988
On First estimate and final estimate use actual work dates
ITEM UNIT OF PROJECT WORK DONE CONTRACT
MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT
1. Type l Class A Concrete side L.F. 3,-63,9 3,211.15 S 8.22 9 26 399 -AS
walk 4 feet wide and 4" thick L1,086*
--
including site clearance and 2,544
subgrade preparation,
comnlete in place _
2. Type 1 Class A Concrete S.Y. 122.1 124.69 S 16.n6 $ 2,002.52
Driveway Approachs, 4" thick
including site clearance and
subgrade reparation;
complete in place
3.
Curb and Gutter removal L.F. 510
340.50
A 2.21 $ 759.32
S
disposal, and paving -repair
ralci latinns by:
4.
Curb and Gutter construction, L.F. 471
377.38
$ 3,083.19
Engineer
30 inch with 6" cur
Difference ............... ...
$
complete in place
Less Special Deduction ...........
$
5.
Type 1, Class E Concrete S.Y. 303
253.28
26.28 6.-656.20
Dept Head
Alley Returns, including site
Less Liquidated Damage .........
$
clearance and subgrade
preparation, complete in place,
$
Director
Date Amount Due this Estimate.........
$
6.
Remove sprinkler system from Lump Sun
Completed
1 224.82 1,224.82
parkway and cap off at prop-
erty line at three locations;
two on Avenue X and one at
2205 16th St.
APPROVED:
For Fn(i''s 04f" e
Total Amount of Work Done .......
S
ralci latinns by:
Less 5 % Retained .............
$
Engineer
Date
Difference ............... ...
$
Less Special Deduction ...........
$
Checked t)y:
Dept Head
Date
Less Liquidated Damage .........
$
Less Previ0U5 Payments . .........
$
Director
Date Amount Due this Estimate.........
$
Page 2 of 2
MONTHLY ESTIMATE
CITY OF LUBBOCK
Project: 1987 SOUTH OVERTON
SIDEWALK IMPROVEMENTS
Project No.
597610
P Otte
Contractor.• FORD CONSTRUCTION CORPORATION
Estimate No.
3 & FINAL
Address: �� 32 Briercrof t
Office Park
Contract $
45, 972.56 -
5,774.55 C.O. # 1*
Lubbock, Texas
79412-
$
40,198.01
11 - 1
- 11 - 22 -
88
19
Estimate Period From
11%=88 to
On First estimate and final estimate use actual work dates
UNIT OF PROJECT
WORK DONE CONTRACT
ITEM
MEASURE EST. QUANTITIES
ON CONTRACT
PRICE AMOUNT
thick, including si
and subgrade prepar
complete in place
APPROVED
t.
Director
M
—99��
— J Checwed
Date
K
Total Amount of Work Done ....... W 44,096.89
Less 5 % Retained ............. $ 0
Difference ..5 44,096.89
Less Special Deduction ........... S 0
Less Liquidated Damage ......... $ 0
Less Previous Payments. .........$ 23,184.81
Amount Due this Estimate......... $ 20, 912.08
F nt Fn is nlh[B
CalCulatinns hY:W
P Otte
—99��
— J Checwed
Date
K
Total Amount of Work Done ....... W 44,096.89
Less 5 % Retained ............. $ 0
Difference ..5 44,096.89
Less Special Deduction ........... S 0
Less Liquidated Damage ......... $ 0
Less Previous Payments. .........$ 23,184.81
Amount Due this Estimate......... $ 20, 912.08