HomeMy WebLinkAboutResolution - 3088 - Amendment #5 To Contract - TWDB - #8-482-504, South Lubbock Drainage Study - 05/11/1989HW: js
Resolution #3088
May 11., 1989
Item #14
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an Amendment
No. 5 to a Contract entered into by and between the City of Lubbock and the
Texas Water Development Board being numbered TWDB Contract No. 8-483-504,
attached herewith, which shall be spread upon the minutes of the Council and
as spread upon the minutes of this Council shall constitute and be a part of
this Resolution as if fully copied herein in detail.
Passed by the City Council this 11th day of May , 1989.
ATTEST:
anettte Boyd, City Secretar
-APPROVED-AS TO CONTENT:
arry Her el, City Erfgineer
APPROVED AS TO FORM:
. ..& Ikli -�nk..4 I?
fidrold Willard, Assistant y
Attorney
C
B. C. McMINN, MAYOR-
ATTEST:
AY R
TWDB C011tract No. 8-483-504
STATE OF TEXAS Texas Water DevelcI, Board
and
00UNTY OF TRAVIS City of Lubbock, Texas
Amendment No. 5
This Contract and Amt, made and entered on May 28, 1987, is
hereby armed as follows:
(1) Me task budget shall be revised as shown in Attachment 1 of
this amendment.
(2) The date of submission of the final report by the City and
termination of TWDB Contract No. 8-483-504 shall be changed
from December 16, 1988, to Mare 31, 1989.
All other terms and conditions of TWDB Cm*xaet No. 8-483-504 remain
in effect.
Agreement to be duly exea ted in triplicate this 11th day of Mal
1989 .
ST:
Ran tte Boyd, City Secret y
APPROVED AS TO.CONTENT:
Larry H tel, City Engineer
APPROVED AS TO FORM:
� t
JI./Worth Fullingim, Assistan
ty Attorney
APM
Date:_
C
By: ZF. e - z,*. — '0�_..',
Homo 1 B. C. Mcd4inn
Mayor
Date: 05/31/89
0
F
1.
ATIAC1MENT 1
S OOM AHENEMM BUDCT
$21,886
$21,886
2.
South Dock Drainage
Study
Current
Revised
3.
Evaluate Alternatives
Budget
Budget
4.
Task Description
Amount
AmoRmt
5•
Phase I
7,931
6,165
1.
Data Collection
$ 8,653
$ 8,653
2.
Prepare Base Maps
1,569
1,569
3.
Determine Drainage Area Characteristics
8,296
8,296
4.
Determine Storage Volume
5,912
5,912
5.
Determine Overflow Rating Curves
10,840
10,840
6 •
Prepare wry Report
3,422
3,422
F
1.
Model Playa Lake System
$21,886
$21,886
2.
Develop Alternate Plans
7,708
7,706
3.
Evaluate Alternatives
10,056
9,703
4.
Evaluate Controls and Autcmation
2,509
1,670
5•
Prepare Cost Estimates
7,931
6,165
6.
Determine Phasing of Alternatives
4,077
4,071
7.
Prepare Draft and Final Reports
18,341
21,307
$111,200 $111,200