Loading...
HomeMy WebLinkAboutResolution - 3088 - Amendment #5 To Contract - TWDB - #8-482-504, South Lubbock Drainage Study - 05/11/1989HW: js Resolution #3088 May 11., 1989 Item #14 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an Amendment No. 5 to a Contract entered into by and between the City of Lubbock and the Texas Water Development Board being numbered TWDB Contract No. 8-483-504, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 11th day of May , 1989. ATTEST: anettte Boyd, City Secretar -APPROVED-AS TO CONTENT: arry Her el, City Erfgineer APPROVED AS TO FORM: . ..& Ikli -�nk..4 I? fidrold Willard, Assistant y Attorney C B. C. McMINN, MAYOR- ATTEST: AY R TWDB C011tract No. 8-483-504 STATE OF TEXAS Texas Water DevelcI, Board and 00UNTY OF TRAVIS City of Lubbock, Texas Amendment No. 5 This Contract and Amt, made and entered on May 28, 1987, is hereby armed as follows: (1) Me task budget shall be revised as shown in Attachment 1 of this amendment. (2) The date of submission of the final report by the City and termination of TWDB Contract No. 8-483-504 shall be changed from December 16, 1988, to Mare 31, 1989. All other terms and conditions of TWDB Cm*xaet No. 8-483-504 remain in effect. Agreement to be duly exea ted in triplicate this 11th day of Mal 1989 . ST: Ran tte Boyd, City Secret y APPROVED AS TO.CONTENT: Larry H tel, City Engineer APPROVED AS TO FORM: � t JI./Worth Fullingim, Assistan ty Attorney APM Date:_ C By: ZF. e - z,*. — '0�_..', Homo 1 B. C. Mcd4inn Mayor Date: 05/31/89 0 F 1. ATIAC1MENT 1 S OOM AHENEMM BUDCT $21,886 $21,886 2. South Dock Drainage Study Current Revised 3. Evaluate Alternatives Budget Budget 4. Task Description Amount AmoRmt 5• Phase I 7,931 6,165 1. Data Collection $ 8,653 $ 8,653 2. Prepare Base Maps 1,569 1,569 3. Determine Drainage Area Characteristics 8,296 8,296 4. Determine Storage Volume 5,912 5,912 5. Determine Overflow Rating Curves 10,840 10,840 6 • Prepare wry Report 3,422 3,422 F 1. Model Playa Lake System $21,886 $21,886 2. Develop Alternate Plans 7,708 7,706 3. Evaluate Alternatives 10,056 9,703 4. Evaluate Controls and Autcmation 2,509 1,670 5• Prepare Cost Estimates 7,931 6,165 6. Determine Phasing of Alternatives 4,077 4,071 7. Prepare Draft and Final Reports 18,341 21,307 $111,200 $111,200