Loading...
HomeMy WebLinkAboutResolution - 3085 - Contract - Angnew, Storrs, & Associates - HVAC Evaluation, LIA Terminal Building - 05/01/1989HW: da RESOLUTION Resolution #3085 May 1, 1989 Item #3 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: {' THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Contract by 11 and between the City of Lubbock and Agnew, Storr's & Associates, Inc. for engineering services for H.V.A.C. systems at Lubbock International Airport, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this Ist day of May , 1989. ATTEST: Ran tte Boyd,—'City Se r tary APPROVED AS TO CONTENT: en ds, Purchasing Manager APPROVED AS TO FORM: Harold Willa -rd, Assistant City Attorney "B.C. MCMINN,- MAYOR Resolution #3085 This document has important legal consequences; consultation with an attorney is encouraged with respect to its completion or modification. STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER I •' PROFESSIONAL SERVICES Prepared by ENGINEERS' JOINT CONTRACT DOCUMENTS COMMITTEE and Issued and Published Jointly By PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE A practice division of the NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS AMERICAN CONSULTING ENGINEERS COUNCIL AMERICAN SOCIETY OF CIVIL ENGINEERS CONSTRUCTION SPECIFICATIONS INSTITUTE EJCDC No. 1910-1 (1984 Edition) This document has important legal consequences; consultation with an attorney is encouraged with respect to its completion or modification. STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES THIS IS AN AGREEMENT made as of May 1 , 19A-9— . between City of Luhhock (OWNER) and (ENGINEER). OWNER intends to evaluate the existing heating, ventilating and air conditioning system serving the Lubbock International Airport Terminal Building in Part T. Part II of the services will include contract documents for the implementation of Part I recommendations. (hereinafter called the Project). OWNER and ENGINEER in consideration of their mutual covenants herein agree in respect of the performance of professional engineering services by ENGINEER and the payment for those services by OWNER as set forth below. SECTION 1—BASIC SERVICES OF ENGINEER 1.2. Study and Report Phase. 1.1. General. 1.1.1. ENGINEER shall provide for OWNER profes- sional engineering services in all phases of the Project to which this Agreement applies as hereinafter pro- vided. These services will include serving as OWNER's professional engineering representative for the Project, providing professional engineering consultation and advice and furnishing customary civil, structural, mechanical and electrical engineering services and cus- tomary architectural services incidental thereto. After written authorization to proceed, ENGINEER shall: 1.2.1. Consult with OWNER to clarify and define OWNER's requirements for the Project and review available data. 1.2.2. Advise OWNER as to the necessity of OWN - ER's providing or obtaining from others data or ser- vices of the types described in paragraph 3.3, and assist OWNER in obtaining such data and services. Page 1 of 21 pages 1.2.3. Identify and analyze requirements of govern, mental authorities having jurisdiction to approve the design of the Project and participate in consultations with such authorities. 1.2.5. Provide a general economic analysis of OWN - ER's requirements applicable to various alternatives. 1.2.6. Prepare a Report containing schematic layouts, sketches and conceptual design criteria with appropri- ate exhibits to indicate clearly the considerations involved (including applicable requirements of governmental authorities having jurisdiction as aforesaid) and the alternative solutions available to OWNER and setting forth ENGINEER'S findings and recommendations. This Report will be accompanied by ENGINEER'S opinion of probable costs for the Project, including the following which will be separately itemized: Construction Cost, allowance for engineering costs and contingencies, and (on the basis of information furnished by OWNER) allowances for such other items as charges of all other professionals and consultants, fe; tho r amt of land and and for other services to be provided by others for Owner pursuant to paragraphs 3.7 through 3.11, inclusive. The total of all such costs, allowances, etc. are hereinafter called "Total Project Costs". 1.2.7. Furnish five copies of the Study and Report doc- uments and review them in person with OWNER. The duties and responsibilities of ENGINEER during the Study and Report Phase are amended and supple- mented as indicated in paragraph 2 of Exhibit A "Fur- ther Descriptions of Basic Engineering Services and Related Matters". Preliminary Design Phase. After wribmauthorization to proceed with the inary Design se, ENGINEER shall: 1.3.1. In consultationth OWNER and on the b of the accepted Study an eport documents, de xte mine the general scope, eand character of Project. 1.3.2. Prepare Preliminary Design documeI�( ing of final design criteria, preliminary drawings, specifications and written descriptions of the P .3; Advise OWNER if additional data or services of fttypes described in paragraph 3.4 are necessary and ass' t OWNER in obtaining such data and services. 1.3.4. Based the information contained in the pre- liminary design avIcuments, submit a revised opinion of probable Total P ect Costs. 1.3.5. Furnish five copies f the above Preliminary Design documents and presen d review them in per- son with OWNER. The duties and responsibilities of ENG EER during the Preliminary Design Phase are amende and sup- plemented as indicated in paragraph 3 of E 'bit A "Further Description of Basic Engineering Ser ' es and Related Matters". 1.4. Final Design Phase. After written authorization to proceed with the Final Design Phase, ENGINEER shall: Study, & Repgrt 1.4.1. On the basis of the accepted documents and the a:cvisad opinion-ef probable Total Project Costs prepare for incorporation in the Contract Documents final drawings to show the general scope, extent and character of the work to be furnished and performed by Contractor(s) (hereinafter called "Draw- ings") and Specifications (which will be prepared in conformance with the sixteen division format of the Construction Specifications Institute). 1.4.2. Provide technical criteria, written descriptions and design data for OWNER's use in filing applications for permits with or obtaining approvals of such gov- ernmental authorities as have jurisdiction to approve the design of the Project, and assist OWNER in con- sultations with appropriate authorities. 1.4.3. Advise OWNER of any adjustments to the latest opinion of probable Total Project Costs caused by changes in general scope, extent or character or design requirements of the Project or Construction Costs. Fur- nish to OWNER a revised opinion of probable Total Project Costs based on the Drawings and Specifica- tions. 1.4.4. Prepare for review and approval by OWNER, its legal counsel and other advisors contract agreement forms, general conditions and supplementary condi- tions; and (where appropriate) bid forms, invitations to bid and instructions to bidders (all of which shall be consistent with the forms and pertinent guide sheets Page 2 of 21_ pages 1.4.5. Furnish five copies of the above documents and of the Drawings and Specifications and present and review them in person with OWNER. ' -MU - - MM 1.5. Bidding or Negotiating Phase. After written authorization to proceed with the Bidding or Negotiating Phase, ENGINEER shall: 1.5.1. Assist OWNER in advertising for and obtaining bids or negotiating proposals for each separate prime contract for construction, materials, equipment and services; and, where applicable, maintain a record of prospective bidders to whom Bidding Documents have been issued, attend pre-bid conferences and receive and process deposits for Bidding Documents. Assist OWNER in preparation of 1.5.2. Us -a addenda as appropriate to interpret, clarify or expand the Bidding Documents. 1.5.3. Consult with and advise OWNER as to the acceptability of subcontractors, suppliers and other persons and organizations proposed by the prime con- tractors) (herein called "Contractor(s)") for those por- tions of the work as to which such acceptability is required by the Bidding Documents. 1.5.4. Consult with OWNER concerning and deter- mine the acceptability of substitute materials and equip- ment proposed by Contractor(s) when substitution prior to the award of contracts is allowed by the Bidding Documents. 1.5.5. Attend the bid opening, prepare bid tabulation sheets and assist OWNER in evaluating bids or pro- posals and in assembling and awarding contracts for construction, materials, equipment and services. r 1.6. Construction Phase. During the Construction Phase: ks 1. General Administration of Construction Con- tra ENGINEER shall consult with and advise OWN and act as OWNER's representative as pro- vided in A 'cies 1 through 17, inclusive, of the Standard General Con 'tions of the Construction Contract, No. 1910-8 (1983 a 'on) of the Engineers Joint Contract Documents Comm ee. The extent and limitations of the duties, responsib 'ties and authority of ENGI- NEER as assigned in sai tandard General Conditions shall not be modified, excep o the extent provided in paragraph 6 of Exhibit A "Furt Description of Basic Engineering Services and Related tters" and except as ENGINEER may otherwise agree ' writing. All of OWNER's instructions to Contractor(s) ill be issued through ENGINEER who will have authors to act on behalf of OWNER to the extent provided in sa Stan- dard General Conditions except as otherwise pro - ed in writing. 1.6.2. Visits to Site and Observation of Construction. In connection with observations of the work of Con- tractors) while it is in progress: 1.6.2.1. ENGINEER shall make visits to the site at intervals appropriate to the various stages of con- struction as ENGINEER deems necessary in order to observe as an experienced .and qualified design professional the progress and quality of the various aspects of Contractor(s)' work.'- addition, ENG1 -art _R4;Pre.&cnW*;r@ (and assistants as agriood) at4hQ. -sit@ to assist ENG INEENR and to pr-owidc mom -on- mation obtained during such visits and on such obser- vations, ENGINEER shall endeavor to determine in general if such -work is proceeding in accordance with the Contract Documents and ENGINEER shall keep OWNER informed of the progress of the work. 1.6.2.3. The purpose of ENGINEER's visits W. sentative (and assistants, if any) at the site will be to enable ENGINEER to better carry out the duties and Page 3 of 21 pages responsibilities assigned to and undertaken by ENGINEER during the Construction Phase, and, in addition, by exercise of ENGINEER's efforts as an experienced and qualified design professional, to pro- vide for OWNER a greater degree of confidence that" the completed work of Contractor(s) will conform generally to the Contract Documents and that the integrity of the design concept as reflected in the Contract Documents has been implemented and pre- served by Contractor(s). On the other hand, ENGI- NEER shall not, during such visits or as a result of such observations of Contractor(s)' work in progress, supervise, direct or have control over Contractor(s)' work nor shall ENGINEER have authority over or responsibility for the means, methods, techniques, sequences or procedures of construction selected by Contractor(s), for safety precautions and programs incident to the work of Contractor(s) or for any failure of Contractor(s) to comply with laws, rules, regula- tions, ordinances, codes or orders applicable to Con- tractors) furnishing and performing their work. Accordingly, ENGINEER can neither guarantee the performance of the construction contracts by Con- tractors) nor assume responsibility for Contrac- tor(s)' failure to furnish and perform their work in accordance with the Contract Documents. 1.6.3. Defective Work. During such visits and on the basis of such observations, ENGINEER may disap- prove of or reject Contractor(s)' work while it is in progress if ENGINEER believes that such work will not produce a completed Project that conforms gen- erally to the Contract Documents or that it will preju- dice the integrity of the design concept of the Project as reflected in the Contract Documents. 1.6. retations and Clarifications. ENGINEER shall issue neces ��nnlerpretations and clarifications of the Contract Documenfs—ai connection therewith prepare work directive changes anders as required. 77 1.6.5. Shop Drawings. ENGINEER shall review and approve (or take other appropriate action in respect of) Shop Drawings (as that term is defined in the aforesaid Standard General Conditions), samples and other' data which Contractor(s) are required to submit, but only for conformance with the design concept of the Project and compliance with the information given in the Con- tract Documents. Such reviews and approvals or other action shall not extend to means, methods, techniques, sequences or procedures of construction or to safety precautions and programs incident thereto. 1.6.6. Substitutes. ENGINEER shall evaluate and determine the acceptability of substitute materials and equipment proposed by Contractor(s), but subject to the provision of paragraph 2.2.2. 1.6.7. Inspections and Tests. ENGINEER shall have authority, as OWNER's representative, to require spe- cial inspection or testing of the work, and shall receive and review all certificates of inspections, testings and approvals required by laws, rules, regulations, ordi- nances, codes, orders or the Contract Documents (but only to determine generally that their content complies with the requirements of, and the results certified indi- cate compliance with, the Contract Documents). 1.6.8. Disputes between OWNER and Contractor. ENGINEER shall act as initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the work thereunder and make deci- sions on all claims of OWNER and Contractor(s) relat- ing to the acceptability of the work or the interpretation of the requirements of the Contract Documents per- taining to the execution and progress of the work. ENGINEER shall not be liable for the results of any such interpretations or decisions rendered in good faith. 1.6.9. Applications for Payment. Based on ENGI- NEER's on-site observations as an experienced and qualified design professional, a-- .nformazion nrnviderl and on review of applications for payment and the accompanying data and schedules: 1.6.9.1. ENGINEER shall determine the amounts owing to Contractor(s) and recommend in writing payments to Contractor(s) in such amounts. Such recommendations of payment will constitute a rep- resentation to OWNER, based on such observations and review, that the work has progressed to the point indicated, and that, to the best of ENGINEER's knowledge, information and belief, the quality of such work is generally in accordance with the Con- tract Documents (subject to an evaluation of such work as a functioning whole prior to or upon Sub- stantial Completion, to the results of any subsequent tests called for in the Contract Documents and to any other qualifications stated in the recommendation). In the case of unit price work, ENGINEER's rec- ommendations of payment will include final deter- minations of quantities and classifications of such work (subject to any subsequent adjustments allowed by the Contract Documents). 1.6.9.2. By recommending any payment ENGI- NEER will not thereby be deemed to have repre- sented that exhaustive, continuous or detailed reviews or examinations have been made by ENGINEER to check the quality or quantity of Contractor(s)' work Page 4 of 21 pages as it is furnished and performed beyond the respon- sibilities specifically assigned to ENGINEER in this Agreement and the Contract Documents. ENGI- NEER's review of Contractor(s)' work for the pur- poses of recommending payments will not impose on ENGINEER responsibility to supervise, direct or control such work or for the means, methods, tech- niques, sequences, or procedures of construction or safety precautions or programs incident thereto or Contractor(s) compliance with laws, rules, regula- tions, ordinances, codes or orders applicable to their furnishing and performing the work. It will also not impose responsibility on ENGINEER to make any examination to ascertain how or for what purposes any Contractor has used the moneys paid on account of the Contract Price, or to determine that title to any of the work, materials or equipment has passed to OWNER free and clear of any lien, claims, security interests or encumbrances, or that there may not be other matters at issue between OWNER and CON- TRACTOR that might affect the amount that should be paid. 1.6.10. Contractor(s)' Completion Documents. ENGI- NEER shall receive and review maintenance and oper- ating instructions, schedules, guarantees, bonds and certificates of inspection, tests and approvals which are to be assembled by Contractor(s) in accordance with the Contract Documents (but such review will only be to determine that their content complies with the requirements of, and in the case of certificates of inspec- tion, tests and approvals the results certified indicate compliance with, the Contract Documents); and shall transmit them to OWNER with written comments. 1.6.11. Inspections. ENGINEER shall conduct an inspection to determine if the work is substantially complete and a final inspection to determine if the com- pleted work is acceptable so that ENGINEER may recommend, in writing, final payment to Contractor(s) and may give written notice to OWNER and the Con- tractors) that the work is acceptable (subject to any conditions therein expressed), but any such recom- mendation and notice will be subject to the limitations expressed in paragraph 1.6.9.2. 1.6.12. Limitation of Responsibilities. ENGINEER shall not be responsible for the acts or omissions of any Contractor, or of any subcontractor or supplier, or any of the Contractor(s)' or subcontractor's or supplier's agents or employees or any other persons (except ENGINEER's own employees and agents) at the site or otherwise furnishing or performing any of the Con- tractor(s)' work; however, nothing contained in para- graphs 1.6.1 thru 1.6.11 inclusive, shall be construed to release ENGINEER from liability for failure to prop- erly perform duties and responsibilities assumed by ENGINEER in the Contract Documents. 1.7. Operational Phase. During the Operational Phase, ENGINEER shall, when requested by OWNER: 1.7.1. Provide assistance in the closing of any financial or related transaction for the Project. 1.7.2. Provide assistance in connection with the refin- ing and adjusting of any equipment or system. 1.7.3. - Fisist QIAINRR « $Wain .. 11t ZAiIE 'F, stag s.. ,esarsr•�rj�iyr�re17 . ..11011 Whil 1.7.5. Prepare a set of reproducible record prints of Drawings showing those changes made during the Con- struction process, based on the marked -up prints, draw- ings and other data furnished by Contractor(s) to ENGI- NEER and which ENGINEER considers significant. 1.7.6. In company with OWNER, visit the Project to observe any apparent defects in the completed con- struction, assist OWNER in consultations and discus- sions with Contractor(s) concerning correction of such deficiencies, and make recommendations as to replace- ment or correction of defective work. The duties and responsibilities of ENGINEER during the Operational Phase are amended and supplemented as indicated in paragraph 7 of Exhibit A "Further Description of Basic Engineering Services and Related Matters". SECTION 2—ADDITIONAL SERVICES OF ENGINEER 2.1. Services Requiring Authorization in Advance. If authorized in writing by OWNER, ENGINEER shall furnish or obtain from others Additional Services of the types listed in paragraphs 2.1.1 through 2.1.14, inclusive. These services are not included as part of Basic Services except to the extent provided otherwise in Exhibit A "Further Description of Basic Engineering Services and Related Matters"; these will be paid for by OWNER as indicated in Section 5. Page 5 of 91 pages 2.1.1. Preparation of applications and supporting doc- uments (in addition to those furnished under Basic'Ser- vices) for private or governmental grants, loans or advances in connection with the Project; preparation or review of environmental assessments and impact statements; review and evaluation of the effect on the design requirements of the Project of any such state- ments and documents prepared by others; and assis- tance in obtaining approvals of authorities having juris- diction over the anticipated environmental impact of the Project. 2.1.2. Services to make measured drawings of or to investigate existing conditions or facilities, or to verify the accuracy of drawings or other information furnished by OWNER. 2.1.3. Services resulting from significant changes in the general scope, extent or character of the Project or its design including, but not limited to, changes in size, complexity, OWNER's schedule, character of con- struction or method of financing; and revising previ- ously accepted studies, reports, design documents or Contract Documents when such revisions are required by changes in laws, rules, regulations, ordinances, codes or orders enacted subsequent to the preparation of such studies, reports or documents, or are due to any other causes beyond ENGINEERS's control. 2.1.4. Providing renderings or models for OWNER's use. 2.1.5. Preparing documents for alternate bids requested by OWNER for Contractor(s)' work which is not exe- cuted or documents for out -of -sequence work. 2.1.6. Investigations and studies involving, but not lim- ited to, detailed consideration of operations, mainte- nance and overhead expenses; providing value engi- neering during the course of design; the preparation of feasibility studies, cash flow and economic evaluations, rate schedules and appraisals; assistance in obtaining financing for the Project; evaluating processes available for licensing and assisting OWNER in obtaining process licensing; detailed quantity surveys of material, equip- ment and labor; and audits or inventories required in connection with construction performed by OWNER. 2.1.7. Furnishing services of independent professional associates and consultants for other than Basic Services (which include, but are not limited to, customary civil, structural, mechanical and electrical engineering and customary architectural design incidental thereto); and providing data or services of the types described in paragraph 3.4 when OWNER employs ENGINEER to provide such data or services in lieu of furnishing the same in accordance with paragraph 3.4. 2.1.8. If ENGINEER's compensation is on the basis of a lump sum or percentage of Construction Cost or cost-plus a fixed fee method of payment, services resulting from the award of more separate prime con- tracts for construction, materials or equipment for the Project than are contemplated by paragraph 5.1.1.2. If ENGINEER's compensation is on the basis of a per- centage of Construction Cost and ENGINEER has been required to prepare Contract Documents on the assumption that more than one prime contract will be awarded for construction, materials and equipment, but only one prime contract is awarded for construction, materials and equipment for the Project, services attrib- utable to the preparation of contract documentation that was rendered unuseable and any revisions or addi- tions to contract documentation used that was neces- sitated by the award of only one prime contract. 2.1.9. Services during out-of-town travel required of ENGINEER other than visits to the site or OWNER's office as required by Section 1. 2.1.10. Assistance in connection with bid protests, rebidding or renegotiating contracts for construction, materials, equipment or services, except when such assistance is required to complete services called for in paragraph 6.2.2.5. 2.1.11. Providing any type of property surveys or related engineering services needed for the transfer of interests in real property and field surveys for design purposes and engineering surveys and staking to enable Con- tractor(s) to proceed with their work; and providing other special field surveys. 2.1.12. Preparation ofoperating, maintenance and staff- ing manuals to supplement Basic Services under para- graph 1.7.3. 2.1.13. Preparing to serve or serving as a consultant or witness for OWNER in any litigation, arbitration or other legal or administrative proceeding involving the Project (except for assistance in consultations which is included as part of Basic Services under paragraphs 1.2.3 and 1.4.2). 2.1.14. Additional services in connection with the Proj- ect, including services which are to be furnished by OWNER in accordance with Article 3, and services not otherwise provided for in this Agreement. Page 6 of 21 pages . Required Additional Services. hen required by the Contract Documents in circum- st ces beyond ENGINEER'S control, ENGINEER sha furnish or obtain from others, as circumstances requ a during construction and without waiting for speci authorization from OWNER, Additional Ser- vices o the types listed in paragraphs 2.2.1 through 2.2.6, in lusive (except to the extent otherwise pro- vided in hibit A "Further Description of Basic Engi- neering Se ices and Related Matters"). These services are not incl ed as part of Basic Services. ENGINEER shall advise WNER promptly after starting any such Additional Se ices which will be paid for by OWNER as indicated in ection 5. 2.2.1. Services connection with work directive changes and chang orders to reflect changes requested by OWNER if the esulting change in compensation for Basic Services is of commensurate with the addi- tional services render 2.2.2. Services in maki revisions to Drawings and Specifications occasiony the acceptance of substi- tutions proposed by Cont ctor(s); and services after the award of each contract i evaluating and determin- ing the acceptability of an u easonable or excessive number of substitutions propo ed by Contractor. 2.2.3. Services resulting from sig ' cant delays, changes or price increases occurring as a di ect or indirect result of material, equipment or energy s ortages. 2.2.4. Additional or extended sere es during con- struction made necessary by (1) workamaged by fire or other cause during construction, ( a significant amount of defective or neglected work ony Contrac- tor, (3) acceleration of the progress sched a involving services beyond normal working hours, an (4) default by any Contractor. 2.2.5. Services (other than Basic Services du 'ng the Operational Phase) in connection with any pa 1 uti- lization of any part of the Project by OWNER p r to Substantial Completion. 2.2.6. Evaluating an unreasonable or extensive nu - ber of claims submitted by Contractor(s) or others i connection with the work. SECTION 3—OWNER'S RESPONSIBILITIES OWNER shall do the following in a timely manner so as not to delay the services of ENGINEER: 3.1. Designate in writing a person to act as OWNER's representative with respect to the services to be ren- dered under this Agreement. Such person shall have complete authority to transmit instructions, receive information, interpret and define OWNER's policies and decisions with respect to ENGINEER's services for the Project. 3.2. Provide all criteria and full information as to OWNER's requirements for the Project, including design objectives and constraints, space, capacity and perfor- mance requirements, flexibility and expandability, and any budgetary limitations; and furnish copies of all design and construction standards which OWNER will require to be included in the Drawings and Specifica- tions. 3.3. Assist ENGINEER by placing at ENGINEER's disposal all available information pertinent to the Proj- ect including previous reports and any other data rel- ative to design or construction of the Project. 4. Furnish to ENGINEER, as required for perfor- nce of ENGINEER's Basic Services (except to the ct nt provided otherwise in Exhibit A "Further esc 'ption of Basic Engineering Services and Related .atte •"), the following: 3.4.1. data prepared by or services of others, including without limitation borings, probings and subsurface xplorations, hydrographic surveys, lab- oratory test and inspections of samples, materials' and eauipmen - 3.4.2. appropri to professional interpretations of all of the foregoing, 3.4.3. environmen 1 assessment and impact statements; 3.4.4. property, bound easement, right-of-way, topographic and utility surve s; 3.4.5. property descriptions; 3.4.6. zoning, deed and other Ian use restriction; and 3.4.7. other special data or consultati s not cov- ered in Section 2; all of which ENGINEER may use and rely u on in performing services under this Agreement. 3.5. Provide engineering surveys to establish referen Page 7 of 21 pages 3.6. Arrange for access to and make all provisions for ENGINEER to enter upon public and private property as required for ENGINEER to perform services under this Agreement. 3.7. Examine all studies, reports, sketches, Drawings, Specifications, proposals and other documents pre- sented by ENGINEER, obtain advice of an attorney, insurance counselor and other consultants as OWNER deems appropriate for such examination and render in writing decisions pertaining thereto within a reasonable time so as not to delay the services of ENGINEER. 3.8. Furnish approvals and permits from all govern- mental authorities having jurisdiction over the Project and such approvals and consents from others as may be necessary for completion of the Project. 3.9. Provide such accounting, independent cost esti- mating and insurance counseling services as may be required for the Project, such legal services as OWNER may require or ENGINEER may reasonably request with regard to legal issues pertaining to the Project including any that may be raised by Contractor(s), such auditing service as OWNER may require to ascertain how or for what purpose any Contractor has used the moneys paid under the construction contract, and such inspection services as OWNER may require to ascer- tain that Contractor(s) are complying with any law, rule, regulation, ordinance, code or order applicable to their furnishing and performing the work. 3.10. If OWNER designates a person to represent OWNER at the site who is not ENGINEER or ENGI- NEER'S agent or employee, the duties, responsibilities and limitations of authority of such other person and the affect thereof on the duties and responsibilities of ENGINEER and the Resident Prejeet Repre9etAft6Y%—. will be set forth in an exhibit that is to be identified, attached to and made a part of this Agreement before such services begin. 3.11. If more than one prime contract is to be awarded for construction, materials, equipment and services for the entire Project, designate a person or organization to have authority and responsibility for coordinating the activities among the various prime contractors. 3.12. Furnish to ENGINEER data or estimated figures as to OWNER's anticipated costs for services to be provided by others for OWNER (such as services pur- suant to paragraphs 3.7 through 3.11, inclusive and other costs of the types referred to in paragraph 1.2.6) so that ENGINEER may make the necessary findings to support opinions of probable Total Project Costs. 3.13. Attend the pre-bid conference, bid opening, pre - construction conferences, construction progress and other job related meetings and substantial completion inspections and final payment inspections. 3.14. Give prompt written notice to ENGINEER whenever OWNER observes or otherwise becomes aware of any development that affects the scope or timing of ENGINEER's services, or any defect or non- conformance in the work of any Contractor. 3.15. Furnish, or direct ENGINEER to provide, Addi- tional Services as stipulated in paragraph 2.1 of this Agreement or other services as required. 3.16. Bear all costs incident to compliance with the requirements of this Section 3. SECTION 4—PERIODS OF SERVICE 4.1. The provisions of this Section 4 and the various rates of compensation for ENGINEER's services pro- vided for elsewhere in this Agreement have been agreed to in anticipation of the orderly and continuous progress of the Project through completion of the Construction Phase. ENGINEER's obligation to render services hereunder will extend for a period which may reason- ably be required for the design, award of contracts, construction and initial operation of the Project includ- ing extra work and required extensions thereto. if in Exhibit A "Further Description of Basic Engineering Services and Related Matters" specific periods of time for rendering services are set forth or specific dates by which services are to be completed are provided and if such dates are exceeded through no fault of ENGI- NEER, all rates, measures and amounts of compen- sation provided herein shall be subject to equitable adjustment. 4.2. The services called for in the Study and Report Phase will be completed and the Report submitted within the stipulated period indicated in paragraph 2 of Exhibit A "Further Description of Basic Engineering Services' and Related Matters" after written authorization to proceed with that phase of services which will be given by OWNER within thirty days after ENGINEER has signed this Agreement. 4.3. After acceptance by OWNER of the Study and Report Phase documents indicating any specific mod - Page 8 of 21 pages ifications or changes in the general scope, extent or character of the Project desired by OWNER, and upon written authorization from OWNER, ENGINEER shall proceed with the performance of the services called for in the Fury Design Phase, and shall 1we- lifainafy design documents and a revised opinion of probable Total Project Costs within the stipulated period indicated in paragraph 3 of Exhibit A "Further Descrip- tion of Basic Engineering Services and Related Mat- ters". Study and Report 4.4. After acceptance by OWNER of the Pesig;iPhase documents and .reuised.opinion of prob- able Total Project Costs, indicating any specific mod- ifications or changes in the general scope, extent or character of the Project desired by OWNER, and upon written authorization from OWNER, ENGINEER shall proceed with the performance of the services called for in the Final Design Phase; and shall deliver Contract Documents and a revised opinion of probable Total Project Costs for all work of Contractor(s) on the Proj- ect within the stipulated period indicated in paragraph 4 of Exhibit A "Further Description of Basic Engi- neering Services and Related Matters". 4.5. ENGINEER's services under the Study and Report Phase, F+elifaiaar3, Design Mase and Final Design Phase shall each be considered complete at the earlier of (1) the date when the submissions for that phase have been accepted by OWNER or (2) thirty days after the date when such submissions are delivered to OWNER for final acceptance, plus in each case such additional time as may be considered reasonable for obtaining approval of governmental authorities having jurisdiction to approve the design of the Project. 4.6. After acceptance by OWNER of the ENGI- NEER's Drawings, Specifications and other Final Design Phase documentation including the most recent opinion of probable Total Project Costs and upon written autho- rization to proceed, ENGINEER shall proceed with performance of the services called for in the Bidding or Negotiating Phase. This Phase shall terminate and the services to be rendered thereunder shall be consid- ered complete upon commencement of the Construc- tion Phase or upon cessation of negotiations with pro- spective Contractor(s) (except as may otherwise be required to complete the services called for in para- graph 6.2.2.5). 4.7. The Construction Phase will commence with the execution of the first prime contract to be executed for the work of the Project or any part thereof, and will terminate upon written recommendation by ENGI- NEER of final payment on the last prime contract to be completed. Construction Phase services may be ren- dered at different times in respect of separate prime contracts if the Project involves more than one prime contract. 4.8. The Operational Phase will commence during the Construction Phase and will terminate one year after the date of Substantial Completion of the last prime contract for construction, materials and equipment on which substantial completion is achieved. 4.9. If OWNER has requested significant modifications or changes in the general scope, extent or character of the Project, the time of performance of ENGINEER's services shall be adjusted equitably. 4.10. If OWNER fails to give prompt written authori- zation to proceed with any phase of services after com- pletion of the immediately preceding phase, or if the Construction Phase has not commenced within 90 calendar days (plus such additional time as may be required to complete the services called for under para- graph 6.2.2.5) after completion of the Final Design Phase, ENGINEER may, after giving seven days' written notice to OWNER, suspend services under this Agreement. 4.11. If ENGINEER's services for design or during construction of the Project are delayed or suspended in whole or in part by OWNER for more than three months for reasons beyond ENGINEER's control, ENGINEER shall on written demand to OWNER (but without termination of this Agreement) be paid as pro- vided in paragraph 5.3.2. If such delay or suspension extends for more than one year for reasons beyond ENGINEER's control, or if ENGINEER for any rea- son .is required to render Construction Phase services in respect of any prime contract for construction, mate- rials or equipment more than one year after Substantial Completion is achieved under that contract, the various rates of compensation provided for elsewhere in this Agreement shall be subject to equitable adjustment. 4.12. In the event that the work designed or specified by ENGINEER is to be furnished or performed under more than one prime contract, or if ENGINEER's ser- vices are to be separately, sequenced with the work of one or more prime contractors (such as in the case of fast -tracking), OWNER and ENGINEER shall, prior to commencement of the Final Design Phase, develop a schedule for performance of ENGINEER's services during the Final Design, Bidding or Negotiating and Construction Phases in order to sequence and coordi- nate properly such services as are applicable to the work under such separate contracts. This schedule is Page 9 of 21 pages to be- prepared whether or not the work under such contracts is to proceed concurrently and is to be included in Exhibit A "Further Description of Basic Engineering Services and Related Matters", and the provisions of paragraphs 4.4 through 4.10 inclusive, will be modified accordingly. [The remainder of this page was left blank intentionally.] Page 10 of 11_ pages LUMP SUM METHOD OF PAYMENT SECTION 5—PAYMENTS TO ENGINEER 5.1. Methods of Payment for Services and Expenses of ENGINEER. 1.1. For Basic Services. OWNER shall pay EN ER for Basic Services rendered under Section 1 nded and supplemented by Exhibit A "Furt -s ription of Basic Engineering Services and Rela att s") as follows: 5.1. A. One Prime Contract. If only one prime contra t is awarded for construction, materials and equipm t for the Project, a lump sum fee of $ for all Basic Services (except ser- vices of GINEER's Resident Project Represen- tative (and ssistants) furnished under paragraph 1.6.2.1 and O rational Phase services furnished under paragraph 1.7 but, if the prime contract contains cost-plus or in ntive savings provisions for Con- tractor's basic mpensation, a lump sum fee of $ or such services. 5.1.1.2. Several P 'me Contracts. If more than one but less than separate prime contracts are awarded for constructs n, materials and equipment for the Project, a lumps m fee of $ for all Basic Services ( cept services of ENGI- NEER'S Resident Project presentative (and assis- tants) furnished under para V1 and Oper- ational Phase services furnishragraph 1.7); but, if any prime contract conlus orincen- tive savings provisions for Cs basic com- pensation, a lump sum fee ofor such services. 5.1.1.3. Resident Project Services. or services of ENGINEER's Resident ProjectRep__ entative (and assistants) furnished under paragraph 1..2.1, on the basis of Salary Costs times a factor of for services rendered by principals and aployees assigned to resident Project representation. 5.1.1.4. Operational Phase Services. For per- ational Phase services furnished under para 1.7, an amount equal to ENGINEER's Salary Costs ti es a factor of for services rendered by pr - cipals and employees engaged directly on the Projec .1.2. For Additional Services. OWNER shall pay NGINEER for Additional Services rendered under ection 2 as follows: 5.1.2.1. General. For Additional Services of ENGINEER's principals and employees engaged directly on the Project and rendered pursuant to para- graph 2.1 or 2.2 (except services as a consultant or witness under paragraph 2.1.13), on the basis of ENGINEER'S Hourly Rate Schedule, Exhibit B. 5.1.2.2. Professional Associates and Consultants. For services and Reimbursable Expenses of inde- pendent professional associates and consultants employed by ENGINEER to render Additional Ser- vices pursuant to paragraph 2.1 .or 2.2, the amount billed to ENGINEER therefor times a factor Of 1.10 , 5.1.2.3. Serving as a Witness. For services ren- dered by ENGINEER's principals and employees as consultants or witnesses in any litigation, arbitration or other legal or administrative proceeding in ac- cordance with paragraph 2.1.13, at the rate of $ 4RQ per day or any portion thereof (but com- pensation for time spent in preparing to appear in any such litigation, arbitration or proceeding will be on the basis provided in paragraph 5.1.2.1). Com- pensation for ENGINEER's independent profes- sional associates and consultants will be on the basis provided in paragraph 5.1.2.2. 5.1:3. For Reimbursable Expenses. In addition to pay- ments provided for in paragraphs 5. 1.1 and 5.1.2, OWNER shall pay ENGINEER the actual costs of all Reimbursable Expenses incurred in connection with all Basic and Additional Services. 5.1.4. The terms "Salary Costs" and "Reimbursable Expenses" have the meanings assigned to them in para- graph 5.4. 5.2. Times of Payments. 5.2.1. ENGINEER shall submit monthly statements for Basic and Additional Services rendered and for Reimbursable Expenses incurred. The statements will be based upon ENGINEER's estimate of the propor- tion of the total services actually completed at the time of billing. OWNER shall make prompt monthly pay- ments in response to ENGINEER's monthly state- ments. Page 11 of _21_ pages 5.3. Other Provisions Concerning Payments. 5.3.1. If OWNER fails to make any payment due ENGINEER for services and expenses within thirty days after receipt of ENGINEER's statement therefor, the amounts due ENGINEER will be increased at the rate of 1% per month from said thirtieth day, and in addition, ENGINEER may, after giving seven days' written notice to OWNER, suspend services under this Agreement until ENGINEER has been paid in full all amounts due for services, expenses and charges. 5.3.2. In the event of termination by OWNER under paragraph 7.1 upon the completion of any phase of the Basic Services, progress payments due ENGINEER for services rendered through such phase shall consti- tute total payment for such services. In the event of such termination by OWNER during any phase of the Basic Services, ENGINEER will be paid for services rendereENGI- NEER's It durit � `fin n.� � &, &he xhitit BGI, services rendered during that phase to date of termi- nation by ENGINEER's principals and employees engaged directly on the Project. In the event of any such termination, ENGINEER also will be reimbursed for the charges of independent professional associates and consultants employed by ENGINEER to render Basic Services, and paid for all unpaid Additional Ser- vices and unpaid Reimbursable Expenses, plus all ter- mination expenses. Termination expenses mean Reim- bursable Expenses directly attributable to termination, which, if termination is at OWNER's convenience, shall include an amount computed as a percentage of total compensation for Basic Services earned by ENGI- NEER to the date of termination, as follows: 10% if termination occurs after commencement of the Final Design Phase. 5.3.3. Records of ENGINEER's Salary Costs perti- nent to ENGINEER's compensation under this Agree- ment will be kept in accordance with generally accepted accounting practices. Copies will be made available to OWNER at cost on request prior to final payment for ENGINEER's services. 5.3.4. Whenever a factor is applied to Salary Costs in determining compensation payable to ENGINEER that factor will be adjusted periodically and equitably to reflect changes in the various elements that comprise such factor. All such adjustments will be in accordance with generally accepted accounting practices as applied on a consistent basis by ENGINEER and consistent with ENGINEER's overall compensation practices and procedures. Definitions. 5..1. The Salary Costs used as a basis for payment m n salaries and wages (basic and incentive) paid to all\ENG INEER's personnel engaged directly on the Proncluding, but not limited to, engineers, archi- tecrveyors, designers, draftsmen, specification wriestimators, other technical and business per- sonus the cost of customary and statutory ben- efitu ing, but not limited to, social security con- tribs, nemployment, excise and payroll taxes, woco pensation, health and retirement benefits, sice, v cation and holiday pay and other group benFor t e purposes of this Agreement, the prin- cipENG EER and their current hourly Salary Coe: The hourly Salary Costs of principals of ENGINEER will be adjusted equitablylo reflect changes in person- nel and in ENGINEER's verall compensation pro- cedures and practices. The amount of customary and tatutory benefits of all other personnel of ENGINEER ACHI be considered equal to % of salaries and mkges, subject to equi- table adjustment to reflect Chang in ENGINEER's overall compensation procedures a d practices. 5.4.2. Reimbursable Expenses mean th actual expenses incurred by ENGINEER or ENGIN R's in professional associates or consulta s, directly or indirectly in connection with the Proj ct, such as expenses for: transportation and subsisten incidental thereto; obtaining bids or proposals from Co tractor(s); providing and maintaining field office facilities including furnishings and utilities; subsistence and trans rtation of Resident Project Representatives and thei assis- tants; toll telephone calls and telegrams; repro ction of reports, Drawings, Specifications, Bidding cu- ments, and similar Project -related items in additio to those required under Section 1; and, if authorize in advance by OWNER, overtime work requiring high r than regular rates. Page 12 of 21 pages [This page was left blank intentionally.] Page 13 of .21_ pages [This page was left blank intentionally.] Page 14 of 2_ pages SECTION 6—CONSTRUCTION COST AND OPINIONS OF COST 6.1. Construction Cost. The construction cost of the entire Project (herein referred to as "Construction Cost") means the total cost to OWNER of those portions of the entire Project designed and specified by ENGINEER, but it will not include ENGINEER's compensation and expenses, the cost of land, rights-of-way, or compensation for or damages to, properties unless this Agreement so specifies, nor will it include OWNER's legal, accounting, insurance counseling or auditing services, or interest and financ- ing charges incurred in connection with the Project or the cost of other services to be provided by others to OWNER pursuant to paragraphs 3.7 throughh 3.11, inclusive. (Construction Cost is one of the items com- prising Total Project Costs which is defined in para- graph 1.2.5.1 6.2. Opinions of Cost. 6.2.1. Since ENGINEER has no control over the cost of labor, materials, equipment or services furnished by others, or over the Contractor(s)' methods of deter- mining prices, or over competitive bidding or market conditions, ENGINEER's opinions of probable Total Project Costs and Construction Cost provided for herein are to be made on the basis of ENGINEER's experience and qualifications and represent ENGINEER's best judgment as an experienced and qualified professional engineer, familiar with the construction industry; but ENGINEER cannot and does not guarantee that pro- posals, bids or actual Total Project or Construction Costs will not vary from opinions of probable cost prepared by ENGINEER. If prior to the Bidding or Negotiating Phase OWNER wishes greater assurance as to Total Project or Construction Costs, OWNER shall employ an independent cost estimator as provided in paragraph 3.9. 6.2.2. If a Construction Cost. limit is established by written agreement between OWNER and ENGINEER and specifically set forth in this Agreement as a con- dition thereto, the following will apply: 6.2.2.1. The acceptance by OWNER at any time during the Basic Services of a revised opinion of probable Total Project or Construction Costs in excess of the then established cost limit will constitute a corresponding revision in the Construction Cost limit to the extent indicated in such revised opinion. 6.2.2.2. Any Construction Cost limit so estab- lished will include a contingency of ten percent unless another amount is agreed upon in writing. 6.2.2.3. ENGINEER will be permitted to deter- mine what types of materials, equipment and com- ponent systems are to be included in the Drawings and Specifications and to make reasonable adjust- ments in the general scope, extent and character of the Project to bring it within the cost limit. 6.2.2.4. If the Bidding or Negotiating Phase has not commenced within six months after completion of the Final Design Phase, the established Construc- tion Cost limit will not be binding on ENGINEER, and OWNER shall consent to an adjustment in such cost limit commensurate with any applicable change in the general level of prices in the construction indus- try between the date of completion of the Final Design Phase and the date on which proposals or bids are sought. 6.2.2.5. If the lowest bona fide proposal or bid exceeds the established Construction Cost limit, OWNER shall (1) give written approval to increase such cost limit, (2) authorize negotiating or rebidding the Project within a reasonable time, or (3) cooperate in revising the Project's general scope, extent or character to the extent consistent with the Project's requirements and with sound engineering practices. In the case of (3), ENGINEER shall modify the Con- tract Documents as necessary to bring the Construc- tion Cost within the cost limit. In lieu of other com- pensation for services in making such modifications, OWNER shall pay ENGINEER, ENGINEER's cost of such services, all overhead expenses reasonably related thereto and Reimbursable Expenses, but without profit to ENGINEER on account of such services. The providing of such service will be the limit of ENGINEER's responsibility in this regard and, having done so, ENGINEER shall be entitled to payment for services in accordance with this Agreement and will not otherwise be liable for dam- ages attributable to the lowest bona fide proposal or bid exceeding the established Construction Cost. SECTION 7—GENERAL CONSIDERATION 7.1. Termination. The obligation to provide further services under this Agreement may be terminated by either party upon thirty days' written notice in the event of substantial Page 15 of 21 pages failure by the other party to perform in accordance with the terms hereof through no fault of the terminating party. Reuse of Documents. All ocuments including Drawings and Specifications prepa d or furnished by ENGINEER (and ENGI- NEER independent professional associates and con- sultants) rsuant to this Agreement are instruments of service i respect of the Project and ENGINEER shall retain a wnership and property interest therein whether or not a Project is completed. OWNER may make and retain pies for information and reference in connection with t e use and occupancy of the Project by OWNER and othe ; however, such documents are not intended or represe ted to be suitable for reuse by OWNER or others on ex nsions of the Project or on any other project. Any reu without written verifica- tion or adaptation by ENGI ER for the specific pur- pose intended will beat OWNE 's sole risk and without liability or legal exposure to EN EER, or to ENGI- NEER's independent professional ssociates or con- sultants, and OWNER shall indemni and hold harm- less ENGINEER and ENGINEER' independent' professional associates and consultants fr all claims, damages, losses and expenses including atto eys' fees' arising out of or resulting therefrom. Any s h verti- fication or adaptation will entitle ENGINEER to oher compensation at rates to be agreed upon by O ER and ENGINEER. 7.3..Insurance. 7.3.1. ENGINEER shall procure and maintain insur- ance for protection from claims under workers' com- pensation acts, claims for damages because of bodily injury including personal injury, sickness or disease or death of any and all employees or of any person other than such employees, and from claims or damages because of injury to or destruction of property including loss of use resulting therefrom. 7.4. Controlling Law. This Agreement is to be governed by the law of the principal place of business of ENGINEER. 7.5. Successors and Assigns. 7.5.1. OWNER and ENGINEER each is hereby bound and the partners, successors, executors, administrators and legal representatives of OWNER and ENGINEER (and to the extent permitted by paragraph 7.5.2 the assigns of OWNER and ENGINEER) are hereby bound to the other party to this Agreement and to the partners, successors, executors, administrators and legal repre- sentatives (and said assigns) of such other party, in respect of all covenants, agreements and obligations of this Agreement. 7.5.2. Neither OWNER nor ENGINEER shall assign, sublet or transfer any rights under or interest in (includ- ingbut without limitation, moneys that may become Zor moneys that are due) this Agreement without the written consent of the other, except to the extent that any assignment, subletting or transfer is mandated by law or the effect of this limitation may be restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this Agreement. Nothing con- tained in this paragraph shall prevent ENGINEER from employing such independent professional associates and consultants as ENGINEER may deem appropriate to assist in the performance of services hereunder. 7.5.3. Nothing under this Agreement shall be con- strued to give any rights or benefits in this Agreement to anyone other than OWNER and ENGINEER, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of OWNER and ENGINEER and not for the benefit of any other party. [The remainder of this page was left blank intentionally.] Page 16 of _ZJ _ pages 7.6. Arbitration. 7.6.1. All claims, counterclaims, disputes and other matters in question between the parties hereto arising out of or relating to this Agreement or the breach thereof will be decided by arbitration in accordance with the Construction Industry Arbitration Rules of the Amer- ican Arbitration Association then obtaining, subject to the limitations and restrictions stated in paragraphs 7.6.3 and 7.6.4 below. This Agreement so to arbitrate and any other agreement or consent to arbitrate entered into in accordance herewith as provided in this para- graph 7.6 will be specifically enforceable under the prevailing law of any court having jurisdiction. 7.6.2. Notice of demand for arbitration must be filed in writing with the other parties to this Agreement and with the American Arbitration Association. The demand must be made within a reasonable time after the claim, dispute or other matter in question has arisen. In no event may the demand for arbitration be made after the date when institution of legal or equitable proceedings based on such claim, dispute or other matter in question would be barred by the applicable statute of limitations. 7.6.3. All demands for arbitration and all answering statements thereto which include any monetary claim must contain a statement that the total sum or value in controversy as alleged by the party making such demand or answering statement is not more than $200,000 (exclusive of interest and costs) and the arbitrators will not have jurisdiction, power or authority to render a monetary award in response thereto against any party which totals more than $200,000 (exclusive of interest and costs). The arbitrators will not have jurisdiction, power or authority to consider, or make findings (except in denial of their own jurisdiction) concerning any claim, counterclaim, dispute or other matter in question where the amount in controversy of any such claim, counter- claim, dispute or matter is more than $200,000 (exclu- sive of interest and costs). 7.6.4. No arbitration arising out of, or relating to, this Agreement may include, by consolidation, joinder or in any other manner, any person or entity who is not a party to this Agreement. 7.6.5. By written consent signed by all the parties to this Agreement and containing a specific reference hereto, the limitations and restrictions contained in paragraphs 7.6.3 and 7.6.4 may be waived in whole or in part as to any claim, counterclaim, dispute or other matter spe- cifically described in such consent. No consent to arbi- tration in respect of a specifically described claim, counterclaim, dispute or other matter in question will constitute consent to arbitrate any other claim, coun- terclaim, dispute or other matter in question which is not specifically described in such consent or in which the sum or value in controversy exceeds $200,000 (exclusive of interest and costs) or which is with any party not specifically described therein. 7.6.6. The award rendered by the arbitrators will be final, judgment may be entered upon it in any court having jurisdiction thereof, and will not be subject to modification or appeal except to the extent permitted by Sections 10 and 11 of the Federal Arbitration Act (9 U.S.C. H10, 11). [The remainder of this page was left blank intentionally.] Page 17 of 21 pages [This page was left blank intentionally.] Page 18 of _91 pages SECTION 8—SPECIAL PROVISIONS, EXHIBITS and SCHEDULES. 8.1. This Agreement is subject to the following special provisions. 8.1.1. Paragraph 2.1.2 shall be provided under Basic Services. 8.1.2 In paragraph 2.1.6, detailed consideration of operations and maintenance expenses; the preparation of feasibility studies and economic evaluations shall be provided under Report and Study Phase. 8.1.3 Paragraph 1.4.4 and 1.5.1 shall be Owner's Responsibility. 8.2. The following Exhibits are attached to and made a part of this Agreement: 8.2.1. Exhibit A "Further Description of Basic Engineering Services and Related Matters" consisting of �— pages. ... , 8.2.2 Exhibit B "Hourly Rate Schedule" and Exhibit C "Payment to Engineer", consisting of 1 page. 8.3. This Agreement (consisting of pages 1 to 21 , inclusive) together with the Exhibits and schedules identified above constitute the entire agreement between OWNER and ENGINEER and supersede all prior written or oral understandings. This Agreement and said Exhibits and schedules may only be amended, supplemented, modified or cancelled by a duly executed written instrument. IN WITNESS WHEREOF, the parties hereto have made and executed this Agreement as of the day and year first above written. OWNER: Mayo r City of Lubbock ENGIN R: Prestd Agnew Storrs and Associates, Inc. Address for giving notices: of 91. pages FURTHER DESCRIPTION OF BASIC EXHIBIT A TO AGREEMENT BETWEEN OWNERS AND ENGINEER FOR PROFESSIONAL SERVICES SERVICES AND RELATED MATTERS 1. This is an exhibit attached to, made a part of and incorporated by reference into the Agreement made on May 1, 1989 between City of Lubbock (OWNER) and Agnew Storrs and Associates, Inc. (ENGINEER) providing for professional engineering services. The Basic Services of Engineer as described in Section 1 of the Agreement are amended or supplemented as indicated below and the time periods for the performance of certain services as indicated in Section 4 of the Agreement are stipulated as indicated below. 2. During the Study and Report Phase ENGINEER shall: Determine the feasibility of repair or replacement of existing direct expansion air conditioning units, identify alternatives, compare owning and operating cost with the use of computer-generated HVAC system simulation program (Trane Trace software). Use City of Lubbock Specifications for H.V.A.C. Repair Bid #10049 for a guide as to condition and needed repairs to existing direct expansion air conditioning equipment. Identify computer software used for system simulation and provide licensing information that would permit the Owner to update the study as needed. Negotiate a lump sum fee for the remaining Basic Services. The Study and Report Phase Services will be completed and the Report submitted within 56 calendar days following written authorization from OWNER to ENGINEER to proceed with that phase of services. 3. During the Operational Phase ENGINEER shall: Provide a reproducible record set of prints to be the sole the Owner. The ENGINEER's firm name and engineering seal removed from the Drawings. Page 20 of 21 property of will be EXHIBIT B TO AGREEMENT BETWEEN OWNERS AND ENGINEER FOR PROFESSIONAL SERVICES HOURLY RATE SCHEDULE Principal's time at a fixed rate of sixty dollars ($60.00) per hour. The Principals' are: Dwayne R. Agnew, P.E. Mark Storrs, P.E. Rich 011er, P.E. Staff Engineer's time at a fixed rate of forty dollars ($40.00) per hour. The Engineers' are: Travis Brqwn Molly Santese Reese Wright Drafting - Level 3 time at the fixed rate of thirty five dollars ($35.00) per hour. Drafting - Level 2 personnel include: Ray Price Basil Agnew Jessie Lozada Drafting - Level 1 time at the fixed rate of twenty dollars ($20.00) per hour. Drafting - Level 1 personnel include: Terry Wright Shannon Bynum Ben Price Clerical time at the fixed rate of twenty dollars ($20.00) per hour. Clerical personnel include: Debby Moore EXHIBIT C TO AGREEMENT BETWEEN OWNERS AND ENGINEER FOR PROFESSIONAL SERVICES PAYMENT TO ENGINEER For Basic Services, OWNER shall pay ENGINEER for services rendered under Section 1 (as amended and supplemented by Exhibit A "Further Description of Basic Engineering Services and Related Matters") as follows: Study and Report Phase: A lump sum fee of $9,750.00 for all Basic Services furnished under paragraph 1.2. Twenty-five percent of the fee will be paid at the completion of the site survey work, the remainder due at the conclusion of this Phase. Final Design Phase, Bidding and Negotiating Phase, Construction Phase and Operational Phase: A lump sum fee and payment schedule will be negotiated for the Basic Services furnished under paragraphs 1.4 through 1.7, inclusive upon the determination of the scope of work. Page 21 of 21