Loading...
HomeMy WebLinkAboutResolution - 3171 - Accept Storm Sewer Improvements - Lee Lewis General Contractor - L4-7, KGN AD - 08/10/1989JWF:js RESOLUTION Resolution # 3171 August, 1.0, 1989 Item #13 RESOLUTION ACCEPTING STORM SEWER DRAINAGE IMPROVEMENTS AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of King's Gate North, Lots 4-7 made arrange- ments with Lee Lewis General Contractor, Inc. and Hugo Reed and Associates, Inc. for the construction of storm sewer drainage improvements in said sub- division under the provisions of said Ordinance prior to the recording of the subdivision plat of the above-mentioned Addition including the follow- ing: 48" and 36" storm sewer construction in King's Gate North Addition known as Unit No. 2034-17; and WHEREAS, the construction of the above improvements was performed un- der the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in ac- cordance with City specifications and in accordance with the provisions of City Ordinance 1331; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF.LUBBOCK:, SECTION 1. THAT the improvements be and the same are hereby accepted and the City Engineer be and he is hereby authorized to notify the developer of acceptance by the Lubbock City Council. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this 10th day of August 1989. Ranettle Boyd, City Secretary APPROVED AS TO CONTENT: earZryvH� er City Engineer e B. C. McMIN , MAYOR APPROVED AS TO FORM: r 04 orth Fullingim, Assist City t rney AUGUST 10, 1989 CONSOLIDATED FINAL COST KING'S GATE NORTH LOTS 4-7 CONSTRUCTION UNIT & SUB -UNIT DESCRIPTION 2034-17 Storm sewer drainage improvements including 452 L. F. of 48" I.D. RCP, 264 L. F. of 36" I.D. RCP and all related work to construct in place as per Hugo Reed Plans (2D-584 A&B). CONSTRUCTION COST $ 81,925.57 COST DISTRIBUTION Construction Developer Cost Cost $ 81,925.57 $ 81,925.57: Cost furnished by Hugo Reed and Associates, Inc.