RESOLUTION
Resolution # 3171
August, 1.0, 1989
Item #13
RESOLUTION ACCEPTING STORM SEWER DRAINAGE IMPROVEMENTS AS LISTED
BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of King's Gate North, Lots 4-7 made arrange-
ments with Lee Lewis General Contractor, Inc. and Hugo Reed and Associates,
Inc. for the construction of storm sewer drainage improvements in said sub-
division under the provisions of said Ordinance prior to the recording of
the subdivision plat of the above-mentioned Addition including the follow-
ing:
48" and 36" storm sewer construction in King's Gate North Addition
known as Unit No. 2034-17; and
WHEREAS, the construction of the above improvements was performed un-
der the supervision of the City Engineer, and said improvements have been
completed and have been inspected and found to have been constructed in ac-
cordance with City specifications and in accordance with the provisions of
City Ordinance 1331; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF.LUBBOCK:,
SECTION 1. THAT the improvements be and the same are hereby accepted
and the City Engineer be and he is hereby authorized to notify the developer
of acceptance by the Lubbock City Council.
SECTION 2. THAT this Resolution shall take effect and be in force
from and after its passage.
Passed by the City Council this 10th day of August 1989.
Ranettle Boyd, City Secretary
APPROVED AS TO CONTENT:
earZryvH� er City Engineer
e
B. C. McMIN , MAYOR
APPROVED AS TO FORM:
r 04
orth Fullingim, Assist City
t rney
AUGUST 10, 1989
CONSOLIDATED FINAL COST
KING'S GATE NORTH
LOTS 4-7
CONSTRUCTION
UNIT &
SUB -UNIT DESCRIPTION
2034-17 Storm sewer drainage improvements including 452 L. F.
of 48" I.D. RCP, 264 L. F. of 36" I.D. RCP and all
related work to construct in place as per Hugo Reed
Plans (2D-584 A&B).
CONSTRUCTION COST $ 81,925.57
COST DISTRIBUTION
Construction Developer
Cost Cost
$ 81,925.57 $ 81,925.57:
Cost furnished by Hugo Reed and Associates, Inc.