HomeMy WebLinkAboutResolution - 3122 - CO#1 To Contract - UCA Inc - Water Supply Line, BSL & LRC - 06/08/1989Resolution # 31.22
June 8, 1989
Item #30
JWF: j
- �sril■1haEllI
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an Amendment by
Change Order to a Contract previously entered into between said City and
Utility Contractors of America, Inc. for construction of a water supply line
for Buffalo Springs Lake and Lake Ransom Canyon, attached herewith, which
shall be spread upon the minutes of the Council and as spread upon the min-
utes of this Council shall constitute and be a part of this Resolution as if
fully copied herein in detail.
Passed by the City Council this 8th day of June , 1989•
B. C. McMINN, MAYOR
ATTEST:
-'I Ranegte Boyd, City Secreta
u
1 APPROVED AS TO CONTENT:
lo
i . Wats n, Chief Engineer
for Wafer Utilities
APPROVED AS TO FORM:
X00 ttM4-'
y.')forth Fullingim, Assistant Ci
A orney
Resolution #3122
Water supply Line For
Buffalo Springs Lake and
Lake Ransom Canyon
2123-553102-9361
TO: Utility Contractors of America, Inc.
5520 Brownfield Highway
Lubbock, TX 79407
Original Amount of Contract $69,399.00
New Amount this Change Order $18,307.47
Amended Amount of Contract $87,706.47
Addition Time of Completion July 28, 1989
WHEREAS, it is desirable to make changes in the plans and
specifications for this project;
THIS AGREEMENT WITNESSETH: In consideration of the mutual
advantages gained, the Owner and Contractor agree to the change shown
herein and in the attached exhibits and data and the Owner and the
Contractor agree that the original contract between them shall be
modified and amended to the extent herein indicated.
IN WITNESS WHEREOF, the Owner and the Contractor have hereto set
their hands this 8th day of June 1989 .
CITY OF LUBBOCK
rPIR
e
BY `
Maor
ATTEST:
Ci y Secretary
RECOMMEND FOR APPROVAL:
I . � L '211. e, /'� �
/0� ief gineer-Water Utilities
Page 2
Water Supply Line for
Buffalo Springs Lake and
Lake Ransom Canyon
2123-553102-9361
BREAKDOWN OF CHANGE
Item 1: Add control valve, piping, fittings and concrete box to
be constructed at water storage tank, Lake Ransom Canyon
as follows:
Control Valve, Pipe and Fittings $ 2,963.67
Labor 1,855.00
Concrete Vault 2,850.00
15% Overhead and Profit 1,150.30
TOTAL ITEM #1 $ 8,818.97
Item 2: Extension of time through July 28, 1989 for completion of
Item One only, to allow for delivery of materials and
installation.
Item 3: Extra work due to rerouting pipeline and to material
handling.
1. Cement — soil stabilization
backfill - 65 C.Y. @ $61.00 $ 3,965.00
2. Special barricades for creek crossing 500.00
3. Grubbing and clearing right-of-way 1,500.00
4. Furnish and install steel casing
in open trench - 142.5 L.F. @ $61.00 8,692.50
5. Load and haul extra pipe to warehouse. 1,000.00
6. Provide miscellaneous materials,
including fittings, gaskets, bolts
etc., not available at City Warehouse. 1,331.00
TOTAL ITEM #3 $16,988.50
ITEM 4: Deduct for scheduled work not to be performed on this
project.
1. 100 Feet of furnished and installed
steel casement in bored tunnel @ $75.00
per foot. ($ 7,500.00)
TOTAL ITEM #4 ($ 7,500.00)
TOTAL AMOUNT OF CHANGE ORDER $18,307.47
xxx.aasxxx