HomeMy WebLinkAboutResolution - 3122 - CO#1 To Contract - UCA Inc - Water Supply Line, BSL & LRC - 06/08/1989Resolution # 31.22 June 8, 1989 Item #30 JWF: j - �sril■1haEllI BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an Amendment by Change Order to a Contract previously entered into between said City and Utility Contractors of America, Inc. for construction of a water supply line for Buffalo Springs Lake and Lake Ransom Canyon, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the min- utes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 8th day of June , 1989• B. C. McMINN, MAYOR ATTEST: -'I Ranegte Boyd, City Secreta u 1 APPROVED AS TO CONTENT: lo i . Wats n, Chief Engineer for Wafer Utilities APPROVED AS TO FORM: X00 ttM4-' y.')forth Fullingim, Assistant Ci A orney Resolution #3122 Water supply Line For Buffalo Springs Lake and Lake Ransom Canyon 2123-553102-9361 TO: Utility Contractors of America, Inc. 5520 Brownfield Highway Lubbock, TX 79407 Original Amount of Contract $69,399.00 New Amount this Change Order $18,307.47 Amended Amount of Contract $87,706.47 Addition Time of Completion July 28, 1989 WHEREAS, it is desirable to make changes in the plans and specifications for this project; THIS AGREEMENT WITNESSETH: In consideration of the mutual advantages gained, the Owner and Contractor agree to the change shown herein and in the attached exhibits and data and the Owner and the Contractor agree that the original contract between them shall be modified and amended to the extent herein indicated. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this 8th day of June 1989 . CITY OF LUBBOCK rPIR e BY ` Maor ATTEST: Ci y Secretary RECOMMEND FOR APPROVAL: I . � L '211. e, /'� � /0� ief gineer-Water Utilities Page 2 Water Supply Line for Buffalo Springs Lake and Lake Ransom Canyon 2123-553102-9361 BREAKDOWN OF CHANGE Item 1: Add control valve, piping, fittings and concrete box to be constructed at water storage tank, Lake Ransom Canyon as follows: Control Valve, Pipe and Fittings $ 2,963.67 Labor 1,855.00 Concrete Vault 2,850.00 15% Overhead and Profit 1,150.30 TOTAL ITEM #1 $ 8,818.97 Item 2: Extension of time through July 28, 1989 for completion of Item One only, to allow for delivery of materials and installation. Item 3: Extra work due to rerouting pipeline and to material handling. 1. Cement — soil stabilization backfill - 65 C.Y. @ $61.00 $ 3,965.00 2. Special barricades for creek crossing 500.00 3. Grubbing and clearing right-of-way 1,500.00 4. Furnish and install steel casing in open trench - 142.5 L.F. @ $61.00 8,692.50 5. Load and haul extra pipe to warehouse. 1,000.00 6. Provide miscellaneous materials, including fittings, gaskets, bolts etc., not available at City Warehouse. 1,331.00 TOTAL ITEM #3 $16,988.50 ITEM 4: Deduct for scheduled work not to be performed on this project. 1. 100 Feet of furnished and installed steel casement in bored tunnel @ $75.00 per foot. ($ 7,500.00) TOTAL ITEM #4 ($ 7,500.00) TOTAL AMOUNT OF CHANGE ORDER $18,307.47 xxx.aasxxx