HomeMy WebLinkAboutResolution - 3114 - Agreement - BNR Company - Crossing Reconstruction, Quirt Avenue - 06/08/1989Resolution # 3114
June 8, 1.989
Item #22
JWF:js
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an Agreement
for crossing reconstruction and repairs on Quirt Avenue to be entered into
by and between the City of Lubbock and Burlington Northern Railroad Company,
attached herewith, which shall be spread upon the minutes of the Council and
as spread upon the minutes of this Council shall constitute and be a part of
this Resolution as if fully copied herein in detail.
Passed by the City Council this 8th day of June , 1989•
B. C. McMIN , MAYOR
Ranet(e Boyd, City Secretary
APPROVED AS TO CONTENT:
Larry D. flertel, City Engineer
APPROVED AS TO FORM:
, I �05� 4-j��
J. or h Fullingim, Assistant Cit
Att r ey
AGREEMENT
between
BURLINGTON NORTHERN RAILROAD COMPANY
and
CITY OF LUBBOCK, TEXAS
A Municipal Corporation
*************
Covering construction of rubber crossing surface at Burlington Northern
Railroad tracks and Quirt Ave., in the City of Lubbock, Lubbock County,
Texas.
1
THIS AGREEMENT, entered into the day and year last below written, by and
between the Burlington Northern Railroad, hereinafter called the "Railway
Company", and the City of Lubbock, Texas, a municipal corporation, hereinafter
called the "City", WITNESSETH:
The City proposes to upgrade track crossing on Quirt Ave. in the City of
Lubbock, Lubbock County, that will require the construction of a rubber surface
crossing, hereinafter called the "crossing".
The proposed construction will include grading, drainage, surfacing,
installation of railroad grade crossing at the proposed crossing.
It is agreed that each of the parties hereto shall perform certain work in
connection with the construction and maintenance of the project, and that the
expense of construction and maintenance thereof shall be borne as hereinafter
provided.
AGREEMENT:
ARTICLE I
In consideration of the covenants of the City hereinafter contained and the
faithful performance thereof, the Railway Company agrees:
1. To license or permit, without compensation other than the covenants of
the City hereinafter contained, the construction and use of said crossing, including
drainage structures appurtenant to the project on its right-of-way (as shown in
Exhibit B"), and in accordance with the plans for the proposed project, as approved
by the parties hereto; reserving, however, the Railway Company, its successors,
assigns, tenants or lessees the right to construct, operate, rearrange and maintain
along or across said right-of-way such tracks and facilities over said crossings and
such pipe lines,m communication, signal and electrical transmission lines, either over
or under said crossings, as the Railway Company, its successors, assigns, lessees or
tenants may find necessary and convenient, provided that any such construction,
reconstruction, rearrangement, etc. does not in any way endanger or unnecessarily
impair the use of said crossing.
2. To prepare plans and estimates for approval of the City to furnish all
materials for the following item of work:
(a) The removal of existing crossing surfaces.
(b) The installation of rubber crossing surfaces.
(c) Make temporary and permanent adjustment of its tracks; wire lines,
fences and other Railway Company facilities.
(d) Furnish railway flagging.
(e) Any other railway work necessary to complete this project as
planned and approved, including removal and replacement of
tracks, track structures and appurtenances.
3. To provide railway flagging service during performance of the contractor's
operations in accordance with the Special Provisions for Flagging included in the
construction contract.
4. To provide railway field engineering and inspection to the extent that
such engineering and inspection is believed to be necessary to protect the Railway
Company's interests during the construction period.
5. - To obtain all materials purchased for its portion of the work. -
6. To sample and test all materials used in its portion of the work, and to
reject all materials which do not conform to the governing specifications.
7. To commence its portion of the work as soon as possible after receipt of
notice from the City to do so, and to prosecute such work dill yently to the conclusion
of its obligations hereunder. This is with the understanding that the various
portions of work will have to be done in sequence to comply with the construction
phases.
8. To grant the City's representatives access to all parts of the work at all
times.
9. To keep its account of work performed hereunder in such a manner that
they maybe readily audited by representatives of the City and actual costs plus
additives of such work readily determined, and to grant said representatives free
access to such accounts at all reasonable times.
10. WHEREAS, said crossing has been constructed and it is the intent of the
parties to provide for allocation of costs of maintaining said crossing and the active
warning devices protecting same;
(a) Railway Company hereby agrees, during the term of the agreement,
to maintain, renew, rehabilitate and repair the crossing and the
tracks of Railway Company end of tie to end of tie.
(b) This agreement shall remain in full force and effect so long as
crossing crosses the tracks of Railway Company, unless terminated
by mutual consent of the parties hereto.
11. The Railway Company shall pay for the items as shown on page 1 of
Exhibit A hereto attached.
ARTICLE II
In consideration of the covenants of the Railway Company hereinbefore
contained and the faithful performance thereof, the City agrees:
1. To provide and place necessary asphalt.
2. To arrange forthe closing of road and detour of traffic during
construction.
3. To sample and test all materials used in its portion of the work and reject
all materials which do not conform to the governing specifications.
4. To appoint and keep competent inspectors on the work under its
supervision.
5. To construct a barrier or curb on West approach to narrow City Street to
maximum of 40 feet usable width at railroad crossing.
6. The City shall have the right to inspect the work to be performed
hereunder by the Railway Company at any time during its progress and to make final
inspection upon completion thereof. Failure of the City to object, within twenty (20)
days after final inspection, shall indicate satisfactory performance on the contract by
the Railway Company; however, written approval may be made by the City within
the 20 day period.
ARTICLE III
1. The City shall reimburse the Railway Company for material expenses
- _- - incurred -by -said Railway Company in performance of work outlined under Article -
Sections 2 through 6, as defined in estimate dated April 5, 1989 and
shown on page 2 of Exhibit A hereto attached.
2. The City shall pay the entire amount due on the contract or contracts let by
it for the construction of work set forth in Article II of the Agreement.
3. Reimbursement to the Railway Company will be made for materials
furnished, including, but not limited to, insurance premiums and coverage at the
rate and amount set forth in the approved cost estimate attached, (119,900) and in
accordance with the provisions of Federal -Aid Highway Program Manual, Volume 1,
Chapter 4, Section 3, issued by the Federal Highway Administration on April 25,
1975, and amendments thereto except as modified by the provisions herein.
4. Railroad and utility company bills.
Upon satisfactory completion of the work performed by the railway
Company underthis agreement and receipt of a statement in proper form, the City
shall make payment to the Railway Company.
ARTICLE IV
"The Railway Company agrees in the performance of this contract not to
discriminate on the grounds or because of race, creed, color, national origin or
ancestry, sex, religion, handicap, age, or political opinion of affiliation, against any
employee of the Railway Company of applicant for employment and shall include a
similar provision in all subcontracts let or awarded hereunder."
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be
executed by their duly authorized officers of representatives on the dates set forth
below.
BURLINGTON NORTHERN RAILROAD COMPANY
By
Title
Date .20
ATTEST:
CITY OF LUBBOCK, TEXAS
By�►�
Title B. C. McMINN, MAYOR
Date June 8, 1.989
:ATTEST:
Rin-ett Boyd, City Secreta
APPROVED AS TO CONTENT:
D�
Larry He e.l, City Engineer
APPROVED AS TO FORM:
C.
J. rtFu ingim, Assistant City orney
4
BURUNGTON
' AFE ESTIMATE SHEET �
NORTHERN
W
Estimated cost to install I0' rubber crossing
surface on Quirt Avenue in Lubbock, TX.
LINE SEGMENT No. 487
PART I - BN EXPENSE
Acct. 8 - Ties
50 Ea. - No. 5 Cross Ties
Labor to Unload & Place
Work Train
Sheet No. 1 of 2
Capital Non -Cash Oper. Tata
(71%) 955
460
s0
TOTAL 1,465 1,465
Acct. 9 - Rail & OTM
216 LF - Rail 115# SH 4.14 N.T.
4 Ea. - Field Welds
4 Ea. - Compr. Joints
24 Ea. - Track Bolts
24 Ea. - Washers
241 Ea. - Track Spikes
100 Ea. - Tie Plates SH
400 Ea. - Rail Anchors
Store Expense
Labor to Relay 108 TY (75%)
Labor to Place Field Welds
Work Train
TOTAL
Acct. 11 - Ballast
42 NT - Cr. Rock - Ryder
Labor to Unload & Place
Work Train
350
220
485
35
10
55
200
370
140
530
380
75
2,300 550 2,850
205
170.
20
TOTAL 395 395
Acct. 39 - Public Improvements; Const.
Labor to Place 70 Rubber Crossing 4,480
TOTAL 4,480 4,480
Overheads
Labor -Additives
Business Expense
Transportation
Contingencies
5,730
495
190
445
TOTAL 6,860
6,860
GROSS COST- PART I 15,500 550 16,050
F-;<)4)8 rr A PA 4rc ) of
A" BURUNGrON
AFE ESTIMATE SHEET RNORTHERN
AILROAD
PART 11- CITY OF LUBBOCK EXPENSE
Acct. 709 - Accrued Accounts Receivable
69 AU LF - Rubber Crossing Su ace
84 LF - Stabilization Fabric
188 LF - 6" Perf. Pipe
4 Ea. Perf. Tees
4 Ea. - Perf. Ells
32 Tons - Asphalt
Traffic Control
Material Handling
Freight
Contingencies
TOTAL
Acct. 761 - Use Tax - State & Provinces
State Tax
TOTAL
GROSS COST- PART II
ESTIMATED GROSS COST- ALL PARTS
Office of Division Engineer
Ft. Worth, TX
April 5, 1989
FRH
Sheet No. 2 of '2
Labor Material Total
12,620
150
1,120
265
200
1,280
1,000
1,320
310
835
19,100 19,100
800
800 800
19,900 19,900
35,950
rX N iR,r J DA, -;, „•r
PRAIRIE DOG
STATE C3
mire dim
man=
ION IAKES
IM®RNM A,
I
SOUTHEAST LOOP 269
64
Ck IV
HOME
Mh BURLINGTON NORTHERN RAILROAD
ENGINEERING DEPARTMENT - MAINTENANCE OF WAY
6851 N. E. Loop 820
Suite 300
Fort Worth, Texas 76180
May 19,1989
K. Smith - P.E.
Engineering Dept.
City of Lubbock
P.O. Box 2000
Lubbock, TX 79457
Re: Full depth rubber crossing on Quirt St. in Lubbock.
Dear Mr. Smith:
Returning herewith is copy of agreement which has been revised per
your request. If this meets your approval please have executed by city
and return for our handling.
Sincerely,
E. A. Wilson
Engineer Public Works
tit