Loading...
HomeMy WebLinkAboutResolution - 3266 - Accept Paving Improvements - Kerr Construction - Western Meadows Addition - 12/14/1989JWF:dw RESOLUTION Resolution # 3266 December 14, 1989 Item #11 RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Western Meadows Addition, Lots 14-A, 15-A & 19-A-1 made arrangements with Kerr Construction Company for the construction of paving improvements on a certain street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the abovementioned addition including the following street: Alley stub removal on east side of Slide Road between 54th and 55th streets and replace with curb and gutter designated as N.S. 2034-18. WHEREAS, the construction of the above improvements on the abovementioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements on said portions of the abovementioned street be and the same are hereby accepted and the City Engineer be and he is hereby authorized to release escrow money in the amount of $695.00. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this 14th day of December 1989. B. C. McM- I`1N , MAYOR _ ST,. /----� Ranptte Boyd, City Secfetak-y =`APPROV AS TO CONTENT: A"o Ctiarry Hertel, ity Engineer APPROVE AVn� STO FORM: J. W&yth Fullingim, Assistan Cit ttorney WESTERN MEADOWS ADDITION Lots 14-A, 15-A, & 19-A-1 December,. 14, 1989 QUANTITIES Unit & Sub -Unit Location 2034-18 Alley stub removal on east side of Slide Rd. between 54th. and 55th. Streets and replace with curb and gutter 22.42 S.Y. Concrete alley stub removal and disposal 35.42 L.F. Curb and Gutter removal and disposal 34.001L.F. Curb and Gutter construction COST DISTRIBUTION Contract Developer City Escrow Cost Cost _ Account $ 695.00 $ 695.00 $ 695.00 * * Placed in City escrow account by developer in lieu of bank letter and to be returned to developer subsequent to acceptance .by City Council. CONSTRUCTION IS LUMP SUM CONTRACT WITH KERR CONSTRUCTION COMPANY FOR $ 695.00.