Loading...
HomeMy WebLinkAboutResolution - 3341 - Accept Improvements - Kerr Construction - Project #9486, Kingsgate Park - 04/12/1990IJWF: js Resolution # 3341 April 1.2, 1990 Item #16 RESOLUTION A RESOLUTION ACCEPTING DRAINAGE AND STREET IMPROVEMENTS AS LISTED BELOW: WHEREAS, the City of Lubbock heretofore entered into a Contract with Kerr Construction Company for the making of drainage and street improvements in said City including among others the following: Kingsgate Drainage and Street improvements. WHEREAS, the construction of the above improvements was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accor- dance with the terms of said Contract, Project No. 9486; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements above-mentioned BE and the same are hereby accepted and the City Engineer BE and he is hereby authorized to direct the final payment to the Contractor in the amount of $5,923.02. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this ATTEST: e uoya, city 5ecrina APPROVED AS TO CONTENT: arry herTei, city tngineer APPROVED AS TO FORM: J./Wqtth Fullingim, Assistantficity At o ney 12th day of April , 1990. B. C. McMIN , MAYOR MONTHLY ESTIMATE CITY OFLUBBOCK Project: Kingsgate Drainage & Street Improvements_ _ _ Project No. 9486 Contractor: Kerr Construction Company Estimate No. 4 & FINAL Address: P. 0. Box 888 Contract $ 114, 084.00 Lubbock, Texas 79408 Estimate Period From March 26, . 19 90 to April 12, '1990 on First estimate and final estimate use actual work dates ITEM UNIT OF PROJECT WORK DONE CONTRACT MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT 1 Concrete Draina e -'Slab and S.Y. 245 215.70 5.00 APPROVED: Fo, Fn ,,'s C', , E' I r 118 460.32 Tots �=,tiiount of Work Done ....... � , (dIC II Ll11 nils hy: . . . . . . . . . . .. S 0 3 ?� Q !�d Less 5 %Retained Engineer Date C;��� Difference ... e 118,460.32 -' Less Special Deduction . .. ----- 2Ct,ecwe(jt)y: Dept. Head Date Less Liquidated Damage .. $ ----- Less PrpOous PaVm.ents I ........ $ 112, 537 .30 Director Date Amount Due this Estimate......... $ 5,923.02 V.G. removal and disposal 2. Curb and Gutter removal and L.F.398.66 $ 5.00 disposal 3. 5" thick concrete drainage S 511 17.909,146.90 slabs 3000 psi/28 da 4. Curb and Gutter L.F. 300 368.66 $ 6.65 $ 2,451.59 5. Ten foot storm sewer inlet box Each 5 5 1.400.00 $ 7,000.00 6. Concrete erosion control slabs S:Y 107.26 $ 33.90 3,636.11 3000psi/28 day concrete 7. 18" RCP Class 2 pipe installed L.F. 1,000,000 $ 19.50 $ 19,500.00 8. 6" thick concrete paving, w S.Y. 2315 $ 22.90 52,768.93 5% entrained air Class "C" 3600 psi concrete 9. Contraction and longitudinal L.F. 3950 4,246 $ 1.25 5 307.50 concrete joint sawing and sea -ling 10. 1-1/2"THD Type "C" Asphalt S.Y. 560 727.92 21.70 $ 15,577.49 Concrete Paving with 6" of Asphalt Stabilized Base. APPROVED: Fo, Fn ,,'s C', , E' I r 118 460.32 Tots �=,tiiount of Work Done ....... � , (dIC II Ll11 nils hy: . . . . . . . . . . .. S 0 3 ?� Q !�d Less 5 %Retained Engineer Date C;��� Difference ... e 118,460.32 -' Less Special Deduction . .. ----- 2Ct,ecwe(jt)y: Dept. Head Date Less Liquidated Damage .. $ ----- Less PrpOous PaVm.ents I ........ $ 112, 537 .30 Director Date Amount Due this Estimate......... $ 5,923.02